4 resultados para Carnegie Steel Company.
em Aston University Research Archive
Resumo:
This thesis investigates the role of accounting in planning and control in the Egyptian Iron and Steel Company "Hadisolb". The hypothesis is that there should be planning and control at appropriate levels, with a significant accounting involvement, In an organisation such as the Egyptian Iron and Steel Company "Hadisolb" . Part One of the thesis explains the role of accounting in planning and control, with special emphasis on its role in long-range corporate planning and control. Parts Two and Three review the history of the Egyptian Iron and Steel Company "Hadisolb", its organisation and structure, also the role of accounting in its planning and control arrangements, together with comments and criticisms concerning this. Part Four is mainly recommendations for alterations or improvements in planning and control in Hadisolb. This includes a suggested planning and organisation structure, physical and cost control reporting structures.
Resumo:
This thesis analyses the work situation and class position of Brazilian engineers through a Marxist perspective. The research is based on two case studies, one focused on a large German steel company based in Brazil and the other on a large Brazilian energy corporation. The fieldwork involved 114 interviews, with engineers from different hierarchical positions in these two companies. Data was also gathered through interviews with representatives from the companies, the Council of Engineering, the Engineering Education System and the Engineers Trade Unions. The findings show that the engineering profession in Brazil has shifted from its initial condition as a liberal profession to an organizational profession, with the country's industrial deployment. Both companies consider all salaried workers as employees, including managers. Hence they are subject to the company's general personnel policies. The multinational company controls labour more rigidly than the national company, as well as reserving its top positions for its home country's executives. Although no deskilling process was found, engineers of both companies performed simple work, which required less engineering knowledge than they had learned from school. Engineers have little autonomy, authority and participation in decision making and are subject to direct supervision, performance evaluation, time control, overtime work, productivity and to poor working conditions in the multinational company. The majority of the engineers supervised other workers without being in a managerial position. They found that to move into management, was a good way to improve their autonomy, authority, prestige, salary, status, power and professional pride. Despite ideological divisions between capital and labour, most of the engineers were unionised and saw unions as the right way to deal with the employer.
Resumo:
The thesis examines the effects of the privatisation process on productivity, competitiveness and performance in two major Brazilian steel companies, which were privatised in between 1991 and 1993. The case study method was adopted in this research due to its strengths as a useful technique allowing in-depth examination of the privatisation process, the context in which it happened and its effects on the companies. The thesis has developed a company analysis framework consisting of three components: management, competitiveness/productivity and performance and examined the evidence on the companies within this framework.The research indicates that there is no straightforward relationship between privatisation, competitiveness and performance. There were many significant differences in the management and technological capabilities, products and performance of the two companies, and these have largely influenced the effects of privatisation on each company. Company Alpha's strengths in technological and management capabilities and high value added products explain strong productivity and financial performance during and after privatisation. Company Beta's performance was weak before the privatisation and remained weak immediately after. Before the privatisation, weaknesses in management, commodity type low value added products and shortage of funds for investment were the major problems. These were compounded by greater government interference. Despite major restructuring, the poor performance has continued after privatisation largely because the company has not been able to improve its productivity sufficiently to be cost competitive in commodity type markets. Both companies state that their strategies have changed significantly. They claim to be more responsive to market conditions and customers and are attempting to develop closer links with major customers. It is not possible to assess the consequences of these changes in the short time that has elapsed since privatisation but Alpha appears to be more effective in developing a coherent strategy because of its strengths. Both companies accelerated their programme of organisational restructuring and reducing the number of their employees during the privatisation process to improve productivity and performance. Alpha has attained standards comparable to major international steel companies. Beta has had to make much bigger organisational changes and cuts in its labour force but its productivity levels still remain low in comparison with Alpha and international competitors.
Resumo:
The thesis describes the work carried out to develop a prototype knowledge-based system 'KBS-SETUPP' to generate process plans for the manufacture of seamless tubes. The work is specifically related to a plant in which hollows are made from solid billets using a rotary piercing process and then reduced to required size and finished properties using the fixed plug cold drawing process. The thesis first discusses various methods of tube production in order to give a general background of tube manufacture. Then a review of the automation of the process planning function is presented in terms of its basic sub-tasks and the techniques and suitability of a knowledge-based system is established. In the light of such a review and a case study, the process planning problem is formulated in the domain of seamless tube manufacture, its basic sub-tasks are identified and capabilities and constraints of the available equipment in the specific plant are established. The task of collecting and collating the process planning knowledge in seamless tube manufacture is discussed and is mostly fulfilled from domain experts, analysing of existing manufacturing records specific to plant, textbooks and applicable Standards. For the cold drawing mill, tube-drawing schedules have been rationalised to correspond with practice. The validation of such schedules has been achieved by computing the process parameters and then comparing these with the drawbench capacity to avoid over-loading. The existing models cannot be simulated in the computer program as such, therefore a mathematical model has been proposed which estimates the process parameters which are in close agreement with experimental values established by other researchers. To implement the concepts, a Knowledge-Based System 'KBS- SETUPP' has been developed on Personal Computer using Turbo- Prolog. The system is capable of generating process plans, production schedules and some additional capabilities to supplement process planning. The system generated process plans have been compared with the actual plans of the company and it has been shown that the results are satisfactory and encouraging and that the system has the capabilities which are useful.