5 resultados para Airport drainage

em Aston University Research Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis describes an investigation into a Local Authority's desire to use its airport to aid regional economic growth. Short studies on air freight. the impact of an airport on the local economy, incoming tourism. and the factors influencing airlines in their use of airports, show that this desire is valid. but only in so far as the airport enables air services to be provided. A survey of airlines. conducted to remedy some deficiencies in the documented knowledge on airline decision-making criteria. indicates that there is cause for concern about the methods used to develop air services. A comparison with the West German network suggests that Birmingham is underprovided with international scheduled flights, and reinforces the survey conclusion that an airport authority must become actively involved in the development of air services. Participation in the licence applications of two airlines to use Birmingham Airport confirms the need for involvement but without showing the extent of the influence which an airport authority may exert. The conclusion is reached that in order to fulfill its development potential, an airport must be marketed to both the general public and the air transport industry. There is also a need for a national air services plan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1974 Dr D M Bramwell published his research work at the University of Aston a part of which was the establishment of an elemental work study data base covering drainage construction. The Transport and Road Research Laboratory decided to, extend that work as part of their continuing research programme into the design and construction of buried pipelines by placing a research contract with Bryant Construction. This research may be considered under two broad categories. In the first, site studies were undertaken to validate and extend the data base. The studies showed good agreement with the existing data with the exception of the excavation trench shoring and pipelaying data which was amended to incorporate new construction plant and methods. An inter-active on-line computer system for drainage estimating was developed. This system stores the elemental data, synthesizes the standard time of each drainage operation and is used to determine the required resources and construction method of the total drainage activity. The remainder of the research was into the general topic of construction efficiency. An on-line command driven computer system was produced. This system uses a stochastic simulation technique, based on distributions of site efficiency measurements to evaluate the effects of varying performance levels. The analysis of this performance data quantities the variability inherent in construction and demonstrates how some of this variability can be reconciled by considering the characteristics of a contract. A long term trend of decreasing efficiency with contract duration was also identified. The results obtained from the simulation suite were compared to site records collected from current contracts. This showed that this approach will give comparable answers, but these are greatly affected by the site performance parameters.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Case law report - online