3 resultados para Airport construction contracts
em Aston University Research Archive
Resumo:
This article analyzes the role of expert witness testimony in the trials of social movement actors, discussing the trial of the "Kingsnorth Six" in Britain and the trials of activists currently mobilising against airport construction at Notre Dame des Landes in western France. Though the study of expert testimony has so far overwhelmingly concentrated on fact-finding and admissibility, the cases here reveal the importance of expert testimony not simply in terms of legal argument, but in "moral" or political terms, as it reflects and constitutes movement cognitive praxis. In the so-called climate change defence presented by the Kingsnorth Six, I argue that expert testimony attained a "negotiation of proximity," connecting different types of contributory expertise to link the scales and registers of climate science with those of everyday understanding and meaning. Expert testimony in the trials of activists in France, however, whilst ostensibly able to develop similar bridging narratives, has instead been used to construct resistance to the airport siting as already proximate, material, and embedded. To explain this, I argue that attention to the symbolic, as well as instrumental, functions of expert testimony reveals the crucial role that collective memory plays in the construction of both knowledge and grievance in these cases. Collective memory is both a constraint on and catalyst for mobilisation, defining the boundaries of the sayable. Testimony in trials both reflects and reproduces these elements and is a vital explanatory tool for understanding the narrativisation and communication of movement identities and objectives. © 2013 The Author. Law & Policy © 2013 The University of Denver/Colorado Seminary.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
In 1974 Dr D M Bramwell published his research work at the University of Aston a part of which was the establishment of an elemental work study data base covering drainage construction. The Transport and Road Research Laboratory decided to, extend that work as part of their continuing research programme into the design and construction of buried pipelines by placing a research contract with Bryant Construction. This research may be considered under two broad categories. In the first, site studies were undertaken to validate and extend the data base. The studies showed good agreement with the existing data with the exception of the excavation trench shoring and pipelaying data which was amended to incorporate new construction plant and methods. An inter-active on-line computer system for drainage estimating was developed. This system stores the elemental data, synthesizes the standard time of each drainage operation and is used to determine the required resources and construction method of the total drainage activity. The remainder of the research was into the general topic of construction efficiency. An on-line command driven computer system was produced. This system uses a stochastic simulation technique, based on distributions of site efficiency measurements to evaluate the effects of varying performance levels. The analysis of this performance data quantities the variability inherent in construction and demonstrates how some of this variability can be reconciled by considering the characteristics of a contract. A long term trend of decreasing efficiency with contract duration was also identified. The results obtained from the simulation suite were compared to site records collected from current contracts. This showed that this approach will give comparable answers, but these are greatly affected by the site performance parameters.