51 resultados para OPM3 (Organizational Project Management Model Maturity)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient to ensure that schedule, cost and quality goals are met on large-scale construction projects. These jobs require complex planning, designing and implementation processes. The main reasons for a project's nonachievement in India's hydrocarbon processing industry are changes in scope and design, altered government policies and regulations, unforeseen inflation, under and/or improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed by applying risk management throughout the project life cycle.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - This paper aims to examine the usefulness of organizational change theory for management practice. Design/methodology/approach - The authors present an exploratory, empirical study of managers who were taught organizational change theory as part of a postgraduate degree. Building on the study findings, they analyse managers' subsequent experiences of organizational change; of how they use change theory in practice and the impact on their practice of their earlier formal study. Findings - The paper finds that the complexities of managing change in practice reflect distinctive organizational environments and cultures. The skills and knowledge which managers found most useful were those that enabled them to "make sense" of the organizational change they subsequently experienced. The main impact of their earlier studies was to prompt informative, discursive and reflective approaches to change management. Practical implications - The paper discusses the implications for future teaching of organizational change and the development of organizational change theory. Originality/value - The qualitative findings of the study add to, and help to explain, earlier research findings on the questions of how managers' experience change, how they use organizational change theory and its impact on their practice. © Emerald Group Publishing Limited.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Service supply chain (SSC) has attracted more and more attention from academia and industry. Although there exists extensive product-based supply chain management models and methods, they are not applicable to the SSC as the differences between service and product. Besides, the existing supply chain management models and methods possess some common deficiencies. Because of the above reasons, this paper develops a novel value-oriented model for the management of SSC using the modeling methods of E3-value and Use Case Maps (UCMs). This model can not only resolve the problems of applicability and effectiveness of the existing supply chain management models and methods, but also answer the questions of ‘why the management model is this?’ and ‘how to quantify the potential profitability of the supply chains?’. Meanwhile, the service business processes of SSC system can be established using its logic procedure. In addition, the model can also determine the value and benefits distribution of the entire service value chain and optimize the operations management performance of the service supply.