40 resultados para Queensland public sector, psychological contract, motivation, Generation Y


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite recent research on time (e.g. Hedaa & Törnroos, 2001), consideration of the time dimension in data collection, analysis and interpretation in research in supply networks is, to date, still limited. Drawing on a body of literature from organization studies, and empirical findings from a six-year action research programme and a related study of network learning, we reflect on time, timing and timeliness in interorganizational networks. The empirical setting is supply networks in the English health sector wherein we identify and elaborate various issues of time, within the case and in terms of research process. Our analysis is wide-ranging and multi-level, from the global (e.g. identifying the notion of life cycles) to the particular (e.g. different cycle times in supply, such as daily for deliveries and yearly for contracts). We discuss the ‘speeding up’ of inter-organizational ‘e’ time and tensions with other time demands. In closing the paper, we relate our conclusions to the future conduct of the research programme and supply research more generally, and to the practice of managing supply (in) networks.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

EMBARGOED The literature on inter-organisational collaboration, although wide-ranging, offers little guidance on collaboration as process. It focuses in the main on human attributes like leadership, trust and agency, but gives little consideration to the role of objects in the development of inter-organisational collaborations. A central aim of this thesis is to understand the interaction of objects and humans in the development of a particular health and social care partnership in the North East of England. This socio-material perspective was achieved through actor-network theory (ANT) as a methodology, in which the researcher is equally sensitised to the role of human and non-human entities in the development of a network. The case study is that of the North East Lincolnshire Care Trust Plus (CTP). This was a unique health and social care collaboration arrangement between North East Lincolnshire Council and North East Lincolnshire Primary Care Trust, setup to address heath inequalities in the region. The CTP was conceived and developed at a local level by the respective organisation’s decision makers in the face of considerable opposition from regional policy makers and national regulators. However, despite this opposition, the directors eventually achieved their goal and the CTP became operational on 1st September 2007. This study seeks to understand how the CTP was conceived and developed, in the face of this opposition. The thesis makes a number of original contributions. Firstly, it adds to the current body of literature on collaboration by identifying how objects can help problematize issues and cement inter-organisational collaborations. Secondly it provides a novel account describing how two public sector organisations created a unique collaboration, despite pressing resistance from the regulatory authorities; and thirdly it extends Callon’s (1996) notion of problematization to examine how, what is rather vaguely described as ‘context’ in the literature, becomes enmeshed in decisions to collaborate. UNTIL 03/02/2016 THIS THESIS IS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

While the literature has suggested the possibility of breach being composed of multiple facets, no previous study has investigated this possibility empirically. This study examined the factor structure of typical component forms in order to develop a multiple component form measure of breach. Two studies were conducted. In study 1 (N = 420) multi-item measures based on causal indicators representing promissory obligations were developed for the five potential component forms (delay, magnitude, type/form, inequity and reciprocal imbalance). Exploratory factor analysis showed that the five components loaded onto one higher order factor, namely psychological contract breach suggesting that breach is composed of different aspects rather than types of breach. Confirmatory factor analysis provided further evidence for the proposed model. In addition, the model achieved high construct reliability and showed good construct, convergent, discriminant and predictive validity. Study 2 data (N = 189), used to validate study 1 results, compared the multiple-component measure with an established multiple item measure of breach (rather than a single item as in study 1) and also tested for discriminant validity with an established multiple item measure of violation. Findings replicated those in study 1. The findings have important implications for considering alternative, more comprehensive and elaborate ways of assessing breach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims to contribute to the debate about the role of the public sector in stimulating greater use of private sector equity for business start-up and growth in two ways. First, to examine the extent to which the provision of public sector equity finance enables individual firms to raise additional funds in the private sector market place. Second, to consider the methodological implications for an economic impact assessment of industrial policy interventions (especially those which include an equity component) at the level of the individual firm. We assess the extent to which there may be indirect positive effects (externalities) associated with public sector financial assistance to individual firms and if so how they distort standard evaluation methodologies designed to estimate the level of additionality of that support. The paper draws upon the results of a recent study of the impact of Enterprise Ireland (EI) financial assistance to indigenous Irish industry in the period 2000 to 2002. The paper demonstrates that a process of re-calibration is necessary in estimates of economic impact in order to account for these positive externalities and the result in this study was a ‘boost’ to additionality. In operational and conceptual terms, the study underlines the importance of the relationship between private and public sector sources of equity finance as an important dynamic in the attempt by industrial and regional policy to stimulate the number of firms with viable investment proposals accessing external equity finance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the UK, the government continues its project to reform public services. Earlier projects have focused on the modernization of public sector organizations; in the latest round of reform, New Labour has focused on widening choice and the personalization of services. To this end, the government has been working with Third Sector (TS) organizations to expand their role in shaping, commissioning and delivering public services. The government's vision is predicated on a normative assertion, that, unlike traditional public sector organizations, TS bodies create public value by being more innovative, are inspired by altruistic aims and values, and have greater commitment to their clients. This paper reviews recent policy and questions whether the government's policy is flawed, contradictory and risks damaging the attributes of the TS admired by New Labour. © 2007 The Author. Journal compilation © 2007 Blackwell Publishing Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Employees in the public and private sectors experience different working conditions and employment relationships. Therefore, it can be assumed that their attitudes toward their job and organizations, and relationships between them, are different. The existing literature has identified the relationship between organizational commitment and job satisfaction as interesting in this context. The present field study examines the satisfaction–commitment link with respect to differences between private and public sector employees. A sample of 617 Greek employees (257 from the private sector and 360 from the public sector) completed standardized questionnaires. Results confirmed the hypothesized relationship differences: Extrinsic satisfaction and intrinsic satisfaction are more strongly related to affective commitment and normative commitment for public sector employees than for private sector ones. The results are discussed, limitations are considered, and directions for future research are proposed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study presented here examines how public procurement agencies address establishing and maintaining competitive markets; a topic still in its academic infancy. Cases are used to address impediments and improve understanding of strategic priorities in managing for competitive markets. Public policy academics have observed many competing policies in the wider public sector. Specifically, this paper identifies a need for research on supplier incentives at a market level, on the post contract management of suppliers and as an important sub-set, key supplier relationship management, along with professional development.