51 resultados para Project management practices
Resumo:
Purpose – The purpose of the paper was to conduct an empirical investigation to explore the impact of project management maturity models (PMMMs) on improving project performance. Design/methodology/approach – The investigation used a cross-case analysis involving over 90 individuals in seven organisations. Findings – The findings of the empirical investigation indicate that PMMMs demonstrate very high levels of variability in individual's assessment of project management maturity. Furthermore, at higher levels of maturity, the type of performance improvement adopted following their application is related to the type of PMMM used in the assessment. The paradox of the unreliability of PMMMs and their widespread acceptance is resolved by calling upon the “wisdom of crowds” phenomenon which has implications for the use of maturity model assessments in other arena. Research limitations/implications – The investigation does have the usual issues associated with case research, but the steps that have been taken in the cross-case construction and analysis have improved the overall robustness and extendibility of the findings. Practical implications – The tendency for PMMMs to shape improvements based on their own inherent structure needs further understanding. Originality/value – The use of empirical methods to investigate the link between project maturity models and extant changes in project management performance is highly novel and the findings that result from this have added resonance.
Resumo:
Completing projects faster than normal is always a challenge as it often demands many paradigm shifts. Globalization opportunities and competition from private sectors and multinationals are forcing the management of public sector organizations in India's petroleum industry to take various aggressive strategies to maintain profitability. These projects are required to be completed sooner than with a typical schedule to remain competitive, get faster return on investment and give longer project life.
Resumo:
This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.
Resumo:
Currently, there are many instances where public sector organizations and government entities collapse and are unable to provide the required services to the public. Such organizations do not have effective mechanisms of control or any specific department which manages projects occurring in the organization. However, this study suggests the incorporation of the Project Management Office (PMO) in public sector organizations for the purpose of managing project management. There are other relevant roles of the PMO discussed in this study. The study is contextualized with respect to Corporate Governance, Risk Management, and Compliance (GRC) and the study shows how PMO can benefit or compliment GRC and provide overall better standards of practice for public sector organizations. The study uses a mixed methodology for data collection and the findings contribute to the body of knowledge regarding PMO's and GRC.
Resumo:
Project-based firms currently follow an organizational structure whereby all projects are dealt with using a functionalist perspective which is integrated with projects so as to support a project-based structure. Project-based firms are increasingly moving towards the realization that innovation management is an integral part of any organizational strategy and the same is true for project-based firms. Moreover, the current body of knowledge regarding project-based firms does not incorporate any findings regarding the integration or use of innovation management in project management. As a result, it becomes important to research organizations to see how innovation management is applied in organizations and what the perspective is regarding innovation in organizations. Secondly, the question of whether slack resources can contribute to higher levels of innovation must also be researched. It has been a longstanding viewpoint that a lack of resources or limited resources results in higher levels of innovation. This study analyzes these two main viewpoints using qualitative analysis of 12 firms. The findings add to the current literature on innovation in organizations and project based firms while expanding the knowledge on innovation.
Resumo:
Enterprise Resource Planning (ERP) projects are strategic and capital intensive, so failure may be costly and even cause bankruptcy of companies. Previous studies have proposed ways for improving implementation, but they are mostly generic and follow standardized project management practices as specified in various standards (e.g. the “project management body of knowledge” of the Project Management Institute). Because ERP is interdisciplinary (involving change management, project management and information technology management), it warrants a customized approach to managing risks throughout the life cycle of implementation and operation. Through a practical case study, this paper demonstrates a qualitative, user friendly approach to ERP project risk management. Firstly, through a literature review it identifies various risk factors in ERP implementation. Secondly, the risk management practices of a UK-based multinational consulting company in one of its clients are evaluated. The risk factors from the case study organization and literature are then compared and discussed.
Resumo:
Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.
Resumo:
Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.
Resumo:
This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.
Resumo:
The availability of regular supply has been identified as one of the major stimulants for the growth and development of any nation and is thus important for the economic well-being of a nation. The problems of the Nigerian power sector stems from a lot of factors culminating in her slow developmental growth and inability to meet the power demands of her citizens regardless of the abundance of human and natural resources prevalent in the nation. The research therefore had the main aim of investigating the importance and contributions of risk management to the success of projects specific to the power sector. To achieve this aim it was pertinent to examine the efficacy of risk management process in practice and elucidate the various risks typically associated with projects (Construction, Contractual, Political, Financial, Design, Human resource and Environmental risk factors) in the power sector as well as determine the current situation of risk management practice in Nigeria. To address this factors inhibiting the proficiency of the overarching and prevailing issue which have only been subject to limited in-depth academic research, a rigorous mixed research method was adopted (quantitative and qualitative data analysis). A review of the Nigeria power sector was also carried out as a precursor to the data collection stage. Using purposive sampling technique, respondents were identified and a questionnaire survey was administered. The research hypotheses were tested using inferential statistics (Pearson correlation, Chi-square test, t-test and ANOVA technique) and the findings revealed the need for the development of a new risk management implementation Framework. The proposed Framework was tested within a company project, for interpreting the dynamism and essential benefits of risk management with the aim of improving the project performances (time), reducing the level of fragmentation (quality) and improving profitability (cost) within the Nigerian power sector in order to bridge a gap between theory and practice. It was concluded that Nigeria’s poor risk management practices have prevented it from experiencing strong growth and development. The study however, concludes that the successful implementation of the developed risk management framework may help it to attain this status by enabling it to become more prepared and flexible, to face challenges that previously led to project failures, and thus contributing to its prosperity. The research study provides an original contribution theoretically, methodologically and practically which adds to the project risk management body of knowledge and to the Nigerian power sector.
Resumo:
Manipulating, or "managing," reported earnings is a temptation faced by every accountant and corporation around the world. This study investigates whether national culture influences perceptions of the acceptability of earnings management. Participants from eight countries evaluated 13 vignettes describing various earnings management practices (Merchant & Rockness, 1994). Our results demonstrate considerable variation in perceptions across nations to the earnings management scenarios, providing strong evidence that the practice of earnings management was not perceived similarly in all countries. Using Hofstede’s (1991) cultural indices, we find that the differences in aggregate perceptions across countries were not closely associated with any of the cultural dimensions examined. We do, however, find that perceptions of earnings manipulations involving the timing of operating decisions were associated with both the Power Distance Index and the Masculinity Index.
Resumo:
Construction projects are risky. However, the characteristics of the risk highly depend on the type of procurement being adopted for managing the project. A build-operate-transfer (BOT) project is recognized as one of the most risky project schemes. There are instances of project failure where a BOT scheme was employed. Ineffective rts are increasingly being managed using various risk management tools and techniques. However, application of those tools depends on the nature of the project, organization's policy, project management strategy, risk attitude of the project team members, and availability of the resources. Understanding of the contents and contexts of BOT projects, together with a thorough understanding of risk management tools and techniques, helps select processes of risk management for effective project implementation in a BOT scheme. This paper studies application of risk management tools and techniques in BOT projects through reviews of relevant literatures and develops a model for selecting risk management process for BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants. Discussion is also made with regard to political risks. This study would contribute to the establishment of a framework for systematic risk management in BOT projects.
Resumo:
This study demonstrates a quantitative approach to construction risk management through analytic hierarchy process and decision tree analysis. All the risk factors are identified, their effects are quantified by determining probability and severity, and various alternative responses are generated with cost implication for mitigating the quantified risks. The expected monetary values are then derived for each alternative in a decision tree framework and subsequent probability analysis aids the decision process in managing risks. The entire methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.