38 resultados para Project management -- Computer programs -- TFC
Resumo:
Computer integrated manufacture has brought about great advances in manufacturing technology and its recognition is world wide. Cold roll forming of thin-walled sections, and in particular the design and manufacture of form-rolls, the special tooling used in the cold roll forming process, is but one such area where computer integrated manufacture can make a positive contribution. The work reported in this thesis, concerned with the development of an integrated manufacturing system for assisting the design and manufacture of form-rolls, was undertaken in collaboration with a leading manufacturer of thin-walled sections. A suit of computer programs, written in FORTRAN 77, have been developed to provide computer aids for every aspect of work in form-roll design and manufacture including cost estimation and stock control aids. The first phase of the development programme dealt with the establishment of CAD facilities for form-roll design, comprising the design of the finished section, the flower pattern, the roll design and the interactive roll editor program. Concerning the CAM facilities, dealt with in the second phase, an expert system roll machining processor and a general post-processor have been developed for considering the roll geometry and automatically generating NC tape programs for any required CNC lathe system. These programs have been successfully implemented, as an integrated manufacturing software system, on the VAX 11/750 super-minicomputer with graphics facilities for displaying drawings interactively on the terminal screen. The development of the integrated system has been found beneficial in all aspects of form-roll design and manufacture. Design and manufacturing lead times have been reduced by several weeks, quality has improved considerably and productivity has increased. The work has also demonstrated the promising nature of the expert systems approach to computer integrated manufacture.
Resumo:
Cold roll forming of thin-walled sections is a very useful process in the sheet metal industry. However, the conventional method for the design and manufacture of form-rolls, the special tooling used in the cold roll forming process, is a very time consuming and skill demanding exercise. This thesis describes the establishment of a stand-alone minicomputer based CAD/CAM system for assisting the design and manufacture of form-rolls. The work was undertaken in collaboration with a leading manufacturer of thin-walled sections. A package of computer programs have been developed to provide computer aids for every aspect of work in form-roll design and manufacture. The programs have been successfully implemented, as an integrated CAD/CAM software system, on the ICL PERQ minicomputer with graphics facilities. Thus, the developed CAD/CAM system is a single-user workstation, with software facilities to help the user to perform the conventional roll design activities including the design of the finished section, the flower pattern, and the form-rolls. A roll editor program can then be used to modify, if required, the computer generated roll profiles. As far as manufacturing is concerned, a special-purpose roll machining program and postprocessor can be used in conjunction to generate the NC control part-programs for the production of form-rolls by NC turning. Graphics facilities have been incorporated into the CAD/CAM software programs to display drawings interactively on the computer screen throughout all stages of execution of the CAD/CAM software. It has been found that computerisation can shorten the lead time in all activities dealing with the design and manufacture of form-rolls, and small or medium size manufacturing companies can gain benefits from the CAD/CM! technology by developing, according to its own specification, a tailor-made CAD/CAM software system on a low cost minicomputer.
Resumo:
The research described here concerns the development of metrics and models to support the development of hybrid (conventional/knowledge based) integrated systems. The thesis argues from the point that, although it is well known that estimating the cost, duration and quality of information systems is a difficult task, it is far from clear what sorts of tools and techniques would adequately support a project manager in the estimation of these properties. A literature review shows that metrics (measurements) and estimating tools have been developed for conventional systems since the 1960s while there has been very little research on metrics for knowledge based systems (KBSs). Furthermore, although there are a number of theoretical problems with many of the `classic' metrics developed for conventional systems, it also appears that the tools which such metrics can be used to develop are not widely used by project managers. A survey was carried out of large UK companies which confirmed this continuing state of affairs. Before any useful tools could be developed, therefore, it was important to find out why project managers were not using these tools already. By characterising those companies that use software cost estimating (SCE) tools against those which could but do not, it was possible to recognise the involvement of the client/customer in the process of estimation. Pursuing this point, a model of the early estimating and planning stages (the EEPS model) was developed to test exactly where estimating takes place. The EEPS model suggests that estimating could take place either before a fully-developed plan has been produced, or while this plan is being produced. If it were the former, then SCE tools would be particularly useful since there is very little other data available from which to produce an estimate. A second survey, however, indicated that project managers see estimating as being essentially the latter at which point project management tools are available to support the process. It would seem, therefore, that SCE tools are not being used because project management tools are being used instead. The issue here is not with the method of developing an estimating model or tool, but; in the way in which "an estimate" is intimately tied to an understanding of what tasks are being planned. Current SCE tools are perceived by project managers as targetting the wrong point of estimation, A model (called TABATHA) is then presented which describes how an estimating tool based on an analysis of tasks would thus fit into the planning stage. The issue of whether metrics can be usefully developed for hybrid systems (which also contain KBS components) is tested by extending a number of "classic" program size and structure metrics to a KBS language, Prolog. Measurements of lines of code, Halstead's operators/operands, McCabe's cyclomatic complexity, Henry & Kafura's data flow fan-in/out and post-release reported errors were taken for a set of 80 commercially-developed LPA Prolog programs: By re~defining the metric counts for Prolog it was found that estimates of program size and error-proneness comparable to the best conventional studies are possible. This suggests that metrics can be usefully applied to KBS languages, such as Prolog and thus, the development of metncs and models to support the development of hybrid information systems is both feasible and useful.
Resumo:
Customer relationship management (CRM) implementation projects reflect a growing conceptual shift from the traditional engineering view of projects. Such projects are complex and risky because they call for both organisational and technological changes. This requires effective project management across various phases of the implementation process. However, few empirical researches have dealt with these project management issues. The aim of this research is to investigate how a “project team” manages CRM implementation projects successfully, across the different phases of the implementation process. We conducted an in-depth case study of the “Firm-Clients Branch” of a large telecommunications company in France. The findings show that, to manage CRM implementation projects successfully, an integrated and balanced approach is required. This involves appropriate system selection, effective process re-engineering and further development of organizational structures. We highlight the need for a “technochange approach” to achieve successful organisational transition and effective CRM implementation. The study reveals that the project team plays a central role throughout the implementation phases. Furthermore the effectiveness of technochange depends on project team performance, technology efficiency and close coordination with stakeholders.
Resumo:
The eighth edition is a fundamental and essential update to the seventh edition published in 2000. This new edition examines a comprehensive range of existing and newer topics that are relevant to project financing in 2012 and explores current trends in the project finance and leasing industries. Contributors are experienced academics and practitioners. Since the first edition was published, the financial markets have undergone tremendous upheavals and many new structures and instruments have been created to meet the financing needs of business. This edition considers the wider world of project finance, applicable to such diverse situations as venture capital and leveraged buyouts, and using new approaches such as Islamic finance techniques. The eighth edition is an essential and over-due update to the previous edition published in 2000. The eighth edition updates a comprehensive review of financial and related topics which are relevant to project financing in 2012 and explores current trends in financial modelling of a project, risk management and the private finance initiatives. This is a comprehensive and practical book full of advice and tips for successful project financing, including leasing, offering a clear, easy to understand guide to a complex area with examples. The topic coverage is well organized and complete moving from the fundamentals to the more complex issues. There is an extensive glossary to support readers. Finally the use of 12 practitioner case studies brings many of these complex issues to life. This is the new edition of the clear, easy-to-understand industry-standard text on project financing. With a good overview of a broad area and using principles of project financing to explain complex structures, this book includes lots of examples and case studies (including Eurotunnel, Dabhol, multiple Paiton deals and other recent deals along with subsequent developments) to show the concepts in use, examine outcomes and to ensure you understand important issues such as effective project structuring and financing, financial modelling for project valuation, and risk management. Substantially updated and expanded to provide the latest developments in all aspects of project financing. An important manual reference, this book is a must-have for every project financier's desk. The text unites the domain of project financing with a wealth of project management techniques, supported by diagrams and charts and other pictorial features, where appropriate. All these supporting features facilitate a better understanding of the accompanying text for the reader. In many chapters there are diagrams to clarify the specific transaction structure discussed in the accompanying text. These diagrams enable the reader to get a very clear idea of the transaction structure, which is particularly useful where it is complex or unusual. There are also a number of checklists to assist stakeholders in the project and resource management of complex project financings. The new financial modelling chapters allow exploration of some of the pitfalls project models encounter, challenging the accurate replication of the project cash flows for stakeholders to evaluate. In the later new risk management chapters, worked examples are included to illustrate the techniques in practice. The new public private partnership/private finance initiatives chapter introduces readers to this new approach to public projects. References are made to useful websites throughout the text. Cases are included at the end of the main text to encourage examination of real-life examples of project financing in practice and also highlight specific issues of current interest. The book will be helpful to project finance sponsors, lawyers, host governments, bankers and providers of capital
Resumo:
Conventional project management techniques are not always sufficient to ensure that schedule, cost and quality goals are met on large-scale construction projects. These jobs require complex planning, designing and implementation processes. The main reasons for a project's nonachievement in India's hydrocarbon processing industry are changes in scope and design, altered government policies and regulations, unforeseen inflation, under and/or improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed by applying risk management throughout the project life cycle.
Resumo:
Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.