53 resultados para Project management


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

There are several studies on managing risks in information technology (IT) projects. Most of the studies identify and prioritise risks through empirical research in order to suggest mitigating measures. Although they are important to clients for future projects, these studies fail to provide any framework for risk management from IT developers' perspective. Although a few studies introduced a framework of risk management in IT projects, most of them are presented from clients' perspectives and very little effort has been made to integrate this with the project management cycle. As IT developers absorb a considerable amount of risk, an integrated framework for managing risks in IT projects from developers' perspective is needed in order to ensure success in IT projects. The main objective of the paper is to develop a risk management framework for IT projects from the developers' perspective. This study uses a combined qualitative and quantitative technique with the active involvement of stakeholders in order to identify, analyse and respond to risks. The entire methodology has been explained using a case study on an information technology project in a public sector organisation in Barbados.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to develop an integrated quality management model that identifies problems, suggests solutions, develops a framework for implementation and helps to evaluate dynamically healthcare service performance. Design/methodology/approach - This study used the logical framework analysis (LFA) to improve the performance of healthcare service processes. LFA has three major steps - problems identification, solution derivation, and formation of a planning matrix for implementation. LFA has been applied in a case-study environment to three acute healthcare services (Operating Room utilisation, Accident and Emergency, and Intensive Care) in order to demonstrate its effectiveness. Findings - The paper finds that LFA is an effective method of quality management of hospital-based healthcare services. Research limitations/implications - This study shows LFA application in three service processes in one hospital. This very limited population sample needs to be extended. Practical implications - The proposed model can be implemented in hospital-based healthcare services in order to improve performance. It may also be applied to other services. Originality/value - Quality improvement in healthcare services is a complex and multi-dimensional task. Although various quality management tools are routinely deployed for identifying quality issues in healthcare delivery, they are not without flaws. There is an absence of an integrated approach, which can identify and analyse issues, provide solutions to resolve those issues, develop a project management framework to implement those solutions. This study introduces an integrated and uniform quality management tool for healthcare services. © Emerald Group Publishing Limited.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Although the various tools and techniques of quality management are routinely deployed in order to improve healthcare quality, an integrated approach is lacking, which combines the customer focus to identify quality issues, analytical techniques for prioritising improvement measures and a project management approach to plan, implement and evaluate the improvement projects. This study develops an innovative framework using Quality Function Deployment (QFD) and a logical framework in order to address this issue, and demonstrates its effectiveness using a case study on the intensive care unit of a hospital.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

As levels of investment in advanced manufacturing systems increase, effective project management becomes ever more critical. This paper demonstrates how the model proposed by Mintzberg, Raisinghani and Theoret in 1976, which structures complicated strategic decision processes, can be applied to the design of new production systems for both descriptive and analytical research purposes. This paper sets a detailed case study concerning the design and development of an advanced manufacturing system within the Mintzberg decision model and so breaks down the decision sequence into constituent parts. It thus shows how a structured model can provide a framework for the researcher who wishes to study decision episodes in the design of manufacturing facilities in greater depth.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to help managers to successfully plan, implement, and operate enterprise resource planning (ERP) projects using a risk management framework. Design/methodology/approach – This paper adopted a combined literature review and case study method. Using literature review, the paper first identified major issues of managing ERP projects and develops a risk management framework for managing those issues. The proposed risk management framework was then applied to a ERP implementation project of a UK-based energy services group and its effectiveness for managing ERP projects implementation had been demonstrated. Additionally, the risk factors as identified from the case application are compared with the risk factors from the previous researches so as to suggest mitigating measures. Findings – All the risk factors are categorized into planning, implementation and operations phases along with project processes, organizational transformation and information technology (IT) perspectives. Project implementation phase is the most vulnerable to failure. The case study results reveal that the effect of other projects on on-going ERP project, management of overall IT architecture and non-availability of resources for organizational transformation are most critical from likelihood and impact perspectives. Managing risk across various phases of project and equal emphasize to effective project management, organizational transformation and IT adoption are the key to success in ERP implementation. Practical implications – The risk factors, which were identified using literature review and the case study, have great significance as mitigating measures of those risks may result successful implementation of ERP projects in the industry. Additionally, proposed risk management framework could be customized to implement ERP projects elsewhere. Originality/value – ERP projects are risky as they are capital intensive, technically complex, and call for organizational transformation. There are both success and failure stories. However, both researchers and practitioners agree, that if it can be implemented and operated successfully and benefits should be achievable. Although there are many studies on ERP implementation, little has been discussed on managing risks of ERP projects. Therefore, this paper bridges the gap.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The control needed in the management of a project was analysed with particular reference to the unique needs of the construction industry within the context of site management. This was explored further by analysing the various problems facing managers within the overall system and determining to what extent the organisation would benefit from an integrated mangement information system. Integration and management of information within the organisational units and the cycles of events that make up the main sub-system was suggested as the means of achieving this objective. A conceptual model of the flow of information was constructed within the whole process of project management by examining the type of information and documents which are generated for the production cycle of a project. This model was analysed with respect to the site managers' needs and the minimum requirements for an overall integrated system. The most tedious and time-consuming task facing the site manager is the determination of weekly production costs, calculation and preparation of interim certificates and valuation of variations occurring during the production stage and finally the settlement and preparation of supplier and sub-contractors' accounts. These areas where microcomputers could be of most help were identified and a number of packages were designed and implemented for various contractors. The gradual integration of stand-alone packages within the whole of the construction industry is a logical sequence to achieve integration of management system. The methods of doing this were analysed together with the resulting advantages and disadvantages.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The research described here concerns the development of metrics and models to support the development of hybrid (conventional/knowledge based) integrated systems. The thesis argues from the point that, although it is well known that estimating the cost, duration and quality of information systems is a difficult task, it is far from clear what sorts of tools and techniques would adequately support a project manager in the estimation of these properties. A literature review shows that metrics (measurements) and estimating tools have been developed for conventional systems since the 1960s while there has been very little research on metrics for knowledge based systems (KBSs). Furthermore, although there are a number of theoretical problems with many of the `classic' metrics developed for conventional systems, it also appears that the tools which such metrics can be used to develop are not widely used by project managers. A survey was carried out of large UK companies which confirmed this continuing state of affairs. Before any useful tools could be developed, therefore, it was important to find out why project managers were not using these tools already. By characterising those companies that use software cost estimating (SCE) tools against those which could but do not, it was possible to recognise the involvement of the client/customer in the process of estimation. Pursuing this point, a model of the early estimating and planning stages (the EEPS model) was developed to test exactly where estimating takes place. The EEPS model suggests that estimating could take place either before a fully-developed plan has been produced, or while this plan is being produced. If it were the former, then SCE tools would be particularly useful since there is very little other data available from which to produce an estimate. A second survey, however, indicated that project managers see estimating as being essentially the latter at which point project management tools are available to support the process. It would seem, therefore, that SCE tools are not being used because project management tools are being used instead. The issue here is not with the method of developing an estimating model or tool, but; in the way in which "an estimate" is intimately tied to an understanding of what tasks are being planned. Current SCE tools are perceived by project managers as targetting the wrong point of estimation, A model (called TABATHA) is then presented which describes how an estimating tool based on an analysis of tasks would thus fit into the planning stage. The issue of whether metrics can be usefully developed for hybrid systems (which also contain KBS components) is tested by extending a number of "classic" program size and structure metrics to a KBS language, Prolog. Measurements of lines of code, Halstead's operators/operands, McCabe's cyclomatic complexity, Henry & Kafura's data flow fan-in/out and post-release reported errors were taken for a set of 80 commercially-developed LPA Prolog programs: By re~defining the metric counts for Prolog it was found that estimates of program size and error-proneness comparable to the best conventional studies are possible. This suggests that metrics can be usefully applied to KBS languages, such as Prolog and thus, the development of metncs and models to support the development of hybrid information systems is both feasible and useful.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The process framework comprises three phases, as follows: scope the supply chain/network; identify the options for supply system architecture and select supply system architecture. It facilitates a structured approach that analyses the supply chain/network contextual characteristics, in order to ensure alignment with the appropriate supply system architecture. The process framework was derived from comprehensive literature review and archival case study analysis. The review led to the classification of supply system architectures according to their orientation, whether integrated; partially integrated; co-ordinated or independent. The classification was combined with the characteristics that influence the selection of supply system architecture to encapsulate the conceptual framework. It builds upon existing frameworks and methodologies by focusing on structured procedure; supporting project management; facilitating participation and clarifying point of entry. The process framework was initially tested in three case study applications from the food, automobile and hand tool industries. A variety of industrial settings was chosen to illustrate transferability. The case study applications indicate that the process framework is a valid approach to the problem; however, further testing is required. In particular, the use of group support system technologies to support the process and the steps involving the participation of software vendors need further testing. However, the process framework can be followed due to the clarity of its presentation. It considers the issue of timing by including alternative decision-making techniques, dependent on the constraints. It is useful for ensuring a sound business case is developed, with supporting documentation and analysis that identifies the strategic and functional requirements of supply system architecture.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The purpose of this research has been to investigate the extent to which Lean techniques have been applied to indirect or White Collar activities within manufacturing operations. The work has been based on a systematic review of the literature and six UK based case studies. Both are described in the paper. The findings from this work include, for example, that there are few reports off the application of Lean in this context. The more substantive papers focus on NPI and Project Management, where as, Support and ‘Front Office’ activities are covered only briefly in ‘trade journal’ articles. These do demonstrate that Lean techniques can be applied successfully to non-production related activities, and there are significant opportunities for work in this area. However, the definition of Lean is evolving and practitioners do not share a common understanding of terminology. This may undermine their accuracy when reporting the application of Lean techniques.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – This paper reports the study of key success factors (KSFs) in the project management of the implementation of strategic manufacturing initiatives (SMIs). Design/methodology/approach – In order to gather the experience and knowledge of many industries, from different geographic locations, in a broad range of types and sizes of SMIs, a questionnaire-based survey of practitioners worldwide was selected as the most appropriate research method among those available. Findings – The identification of those tasks and activities that must be done well in order to succeed in the implementation of a SMI in practice. Practical implications – Practitioners focusing their attention on the KSFs identified are more likely to succeed. Once these factors have been identified, the value of benchmarking project management methodologies then comes from drawing attention to those tasks that are key to the success of the implementation of SMIs. Originality/value – The paper presents new thinking by bringing project management into the operations strategy implementation literature as an important mediating factor for success. In this context the factors that are required for successful implementation are identified.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.