60 resultados para Business Process Improvement
Resumo:
Methodologies for understanding business processes and their information systems (IS) are often criticized, either for being too imprecise and philosophical (a criticism often levied at softer methodologies) or too hierarchical and mechanistic (levied at harder methodologies). The process-oriented holonic modelling methodology combines aspects of softer and harder approaches to aid modellers in designing business processes and associated IS. The methodology uses holistic thinking and a construct known as the holon to build process descriptions into a set of models known as a holarchy. This paper describes the methodology through an action research case study based in a large design and manufacturing organization. The scientific contribution is a methodology for analysing business processes in environments that are characterized by high complexity, low volume and high variety where there are minimal repeated learning opportunities, such as large IS development projects. The practical deliverables from the project gave IS and business process improvements for the case study company.
Resumo:
With new and emerging e-business technologies to transform business processes, it is important to understand how those technologies will affect the performance of a business. Will the overall business process be cheaper, faster and more accurate or will a sub-optimal change have been implemented? The use of simulation to model the behaviour of business processes is well established, and it has been applied to e-business processes to understand their performance in terms of measures such as lead-time, cost and responsiveness. This paper introduces the concept of simulation components that enable simulation models of e-business processes to be built quickly from generic e-business templates. The paper demonstrates how these components were devised, as well as the results from their application through case studies.
Resumo:
The materials management function is always a major concern to management of any industrial organization, since high inventory and an inefficient procurement process significantly affect profitability. Problems multiply due to the current dynamic business environment in many countries. Hence, existing materials planning and procurement process and inventory management systems require a review. This article shows a radical improvement in the materials management function for an Indian petroleum refinery through business process re-engineering (BPR) by analyzing the current process, identifying key issues, deriving paradigm shifts and developing re-engineered processes through customer value analysis. BPR has been carried out on the existing processes of "material planning and procurement" and "warehousing and surplus disposal.
Resumo:
Time, cost and quality are the prime objectives of any project. Unfortunately, today’s project management does not always ensure the realisation of these objectives. The main reasons of project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation, under-estimation and mis-estimation. An overall organisational approach with the application of appropriate management philosophies, tools and techniques can only solve the problem. The present study establishes a methodology for achieving success in implementing projects using a business process re-engineering (BPR) framework. Internal performance characteristics are introspected through condition diagnosis that identifies and prioritises areas of concern requiring attention. Process re-engineering emerges as a most critical area for immediate attention. Project process re-engineering is carried out by eliminating non-value added activities, taking up activities concurrently by applying information systems rigorously and applying risk management techniques throughout the project life cycle. The overall methodology is demonstrated through applications to cross country petroleum pipeline project organisation in an Indian scenario.
Resumo:
Context Many large organizations juggle an application portfolio that contains different applications that fulfill similar tasks in the organization. In an effort to reduce operating costs, they are attempting to consolidate such applications. Before consolidating applications, the work that is done with these applications must be harmonized. This is also known as process harmonization. Objective The increased interest in process harmonization calls for measures to quantify the extent to which processes have been harmonized. These measures should also uncover the factors that are of interest when harmonizing processes. Currently, such measures do not exist. Therefore, this study develops and validates a measurement model to quantify the level of process harmonization in an organization. Method The measurement model was developed by means of a literature study and structured interviews. Subsequently, it was validated through a survey, using factor analysis and correlations with known related constructs. Results As a result, a valid and reliable measurement model was developed. The factors that are found to constitute process harmonization are: the technical design of the business process and its data, the resources that execute the process, and the information systems that are used in the process. In addition, strong correlations were found between process harmonization and process standardization and between process complexity and process harmonization. Conclusion The measurement model can be used by practitioners, because it shows them the factors that must be taken into account when harmonizing processes, and because it provides them with a means to quantify the extent to which they succeeded in harmonizing their processes. At the same time, it can be used by researchers to conduct further empirical research in the area of process harmonization.
Resumo:
The implementation of advanced manufacturing systems with high process capability is an essential requirement for the high value manufacturing industries. To ensure high process capability, industry needs to deal with the requirement for tight tolerances and the unavoidable variations in materials, and manufacturing and inspection processes. In the case of machining superalloys, such variations result in the need to change the machine parameters for producing different batches of materials from different suppliers. This is required in order to get the process under control and reduce waste and defects, leading to better competitiveness. This papers discuss the variability in materials and the corresponding process requirements when machining superalloys, and highlights the impact of metrology in achieving manufacturing process improvement.
Resumo:
Local Government Authorities (LGAs) are mainly characterised as information-intensive organisations. To satisfy their information requirements, effective information sharing within and among LGAs is necessary. Nevertheless, the dilemma of Inter-Organisational Information Sharing (IOIS) has been regarded as an inevitable issue for the public sector. Despite a decade of active research and practice, the field lacks a comprehensive framework to examine the factors influencing Electronic Information Sharing (EIS) among LGAs. The research presented in this paper contributes towards resolving this problem by developing a conceptual framework of factors influencing EIS in Government-to-Government (G2G) collaboration. By presenting this model, we attempt to clarify that EIS in LGAs is affected by a combination of environmental, organisational, business process, and technological factors and that it should not be scrutinised merely from a technical perspective. To validate the conceptual rationale, multiple case study based research strategy was selected. From an analysis of the empirical data from two case organisations, this paper exemplifies the importance (i.e. prioritisation) of these factors in influencing EIS by utilising the Analytical Hierarchy Process (AHP) technique. The intent herein is to offer LGA decision-makers with a systematic decision-making process in realising the importance (i.e. from most important to least important) of EIS influential factors. This systematic process will also assist LGA decision-makers in better interpreting EIS and its underlying problems. The research reported herein should be of interest to both academics and practitioners who are involved in IOIS, in general, and collaborative e-Government, in particular. © 2013 Elsevier Ltd. All rights reserved.
Resumo:
This paper highlights the context within which business process outsourcing (BPO) has rapidly grown in India and the critical need to investigate the dynamics of human resource management (HRM) practices and systems in this sector. Using a mixed-method approach involving both in-depth interviews and self-completing questionnaires, we analyze the nature of HRM systems in BPO organizations operating in India. The analysis is based on a sample of 51 BPO companies, a majority of which are located near the capital of New Delhi. The results focus on the nature and structure of work and organization of Indian BPOs, as well as the strategic role played by HRM in such organizations. Furthermore, the findings highlight the way specific HRM practices such as recruitment, performance appraisal, training and development, and compensations are implemented. Our study suggests the existence of formal, structured, and rationalized HRM systems in Indian BPOs. A number of insights related to HRM policies and practices are shared by the HR managers interviewed shedding more light on the inner workings of the Indian BPO companies and their challenges. The analysis provides original and useful information to both academics and practitioners and opens avenues for future research on the nature of HRM systems and practices in the Indian BPO industry.
Resumo:
Purpose: The business process outsourcing (BPO) industry in India is evolving rapidly, and one of the key characteristics of this industry is the emergence of high-end services offered by knowledge processing outsourcing (KPO) organizations. These organizations are set to grow at a tremendous pace. Given the people-intensive nature of this industry, efficient employee management is bound to play a critical role. The literature lacks studies offering insights into the HR challenges involved and the ways in which they are addressed by KPOs. The purpose of this paper is to attempt to fill this gap by presenting findings from an in-depth case study of a KPO organization. Design/methodology/ approach: To achieve the research objective we adopted an in-depth case study approach. The research setting was that of a KPO organization in India, which specialises in offering complex analytics, accounting and support services to the real estate and financial services industries. Findings: The results of this study highlight the differences in the nature of work characteristics in such organizations as compared to call centres. The study also highlights some of the key people management challenges that these organizations face like attracting and retaining talent. The case company adopts formal, structured, transparent and innovative human resource practices. The study also highlights that such enlightened human resource practices stand on the foundations laid by an open work environment and facilitative leadership. Research limitations/implications: One of the key limitations is that the analysis is based on primary data from a single case study and only 18 interviews. The analysis contributes to the fields of KPO, HRM and India and has key messages for policy makers. Originality/value: The literature on outsourcing has in general focused on call centres established in the developed world. However, the booming BPO industry in India is also beginning to offer high-end services, which are far above the typical call centres. These KPOs and their people management challenges are relatively unexplored territories in the literature. By conducting this study in an emerging market (India) and focusing on people-related challenges in KPOs, this study attempts to provide a fresh perspective to the extant BPO literature. © Emerald Group Publishing Limited.
Resumo:
In an exploding and fluctuating construction market, managers are facing a challenge, which is how to manage business on a wider scale and to utilize modern developments in information technology to promote productivity. The extraordinary development of telecommunications and computer technology makes it possible for people to plan, lead, control, organize and manage projects from a distance without the need to be on site on a daily basis. A modern management known as distance management (DM) or remote management is emerging. Physical distance no longer determines the boundary of management since managers can now operate projects through virtual teams that organize manpower, material and production without face-to-face communication. What organization prototype could overcome psychological and physical barriers to reengineer a successful project through information technology? What criteria distinguishes the adapted way of communication of individual activities in a teamwork and assist the integration of an efficient and effective communication between face-to-face and a physical distance? The entire methodology has been explained through a case application on refuse incineration plant projects in Taiwan.
Resumo:
Purpose – Increasing turnover of frontline staff in call centres is detrimental to the delivery of quality service to customers. This paper aims to present the context for the rapid growth of the business process outsourcing (BPO) sector in India, and to address a critical issue faced by call centre organisations in this sector – the high employee turnover. Design/methodology/approach – Following a triangulation approach, two separate empirical investigations are conducted to examine various aspects of high labour turnover rates in the call centre sector in India. Study one examines the research issue via 51 in-depth interviews in as many units. Study two reports results from a questionnaire survey with 204 frontline agents across 11 call centres regarding employee turnover. Findings – This research reveals a range of reasons – from monotonous work, stressful work environment, adverse working conditions, lack of career development opportunities; to better job opportunities elsewhere, which emerge as the key causes of increasing attrition rates in the Indian call centre industry. Research limitations/implications – The research suggests that there are several issues that need to be handled carefully by management of call centres in India to overcome the problem of increasing employee turnover, and that this also demands support from the Indian government. Originality/value – The contributions of this study untangle the issues underlying a key problem in the call centre industry, i.e. employee turnover in the Indian call centre industry context. Adopting an internal marketing approach, it provides useful information for both academics and practitioners and suggests internal marketing interventions, and avenues for future research to combat the problem of employee turnover.
Resumo:
This paper discusses three major areas of knowledge; business process reengineering (BPR), soft systems methodology (SSM) and concurrent engineering (CE) to demonstrate that their philosophies are complementary. An example is given depicting how a manufacturing resource planning system is set up and how improvements can be achieved by applying CE best practice.
Resumo:
Purpose – The purpose of this paper is to help managers to successfully plan, implement, and operate enterprise resource planning (ERP) projects using a risk management framework. Design/methodology/approach – This paper adopted a combined literature review and case study method. Using literature review, the paper first identified major issues of managing ERP projects and develops a risk management framework for managing those issues. The proposed risk management framework was then applied to a ERP implementation project of a UK-based energy services group and its effectiveness for managing ERP projects implementation had been demonstrated. Additionally, the risk factors as identified from the case application are compared with the risk factors from the previous researches so as to suggest mitigating measures. Findings – All the risk factors are categorized into planning, implementation and operations phases along with project processes, organizational transformation and information technology (IT) perspectives. Project implementation phase is the most vulnerable to failure. The case study results reveal that the effect of other projects on on-going ERP project, management of overall IT architecture and non-availability of resources for organizational transformation are most critical from likelihood and impact perspectives. Managing risk across various phases of project and equal emphasize to effective project management, organizational transformation and IT adoption are the key to success in ERP implementation. Practical implications – The risk factors, which were identified using literature review and the case study, have great significance as mitigating measures of those risks may result successful implementation of ERP projects in the industry. Additionally, proposed risk management framework could be customized to implement ERP projects elsewhere. Originality/value – ERP projects are risky as they are capital intensive, technically complex, and call for organizational transformation. There are both success and failure stories. However, both researchers and practitioners agree, that if it can be implemented and operated successfully and benefits should be achievable. Although there are many studies on ERP implementation, little has been discussed on managing risks of ERP projects. Therefore, this paper bridges the gap.
Resumo:
Operations management deals with the management of the creation of goods and the delivery of services to the customer. It plays an essential role in the success of any organization. In this book, Andrew Greasley provides a clear and accessible introduction to this important area of study, focusing on all key areas of operations in both manufacturing and service industries. Operations Management, Second Edition covers the main areas of operations strategy, the design of the operations system and the management of operations over time. Yet, its concise nature of the text means students are not overwhelmed by the amount of material presented. This new edition also features: New content in such areas such as the quality gap model, enterprise systems and business process management. Expanded case studies, to include more global and European cases and longer cases at the end of each chapter. Greater clarity in chapter material organization. Worked Examples providing a step–by–step guide to the procedure to solve quantitative problems. Visual redesign in full colour. More support material for students and lecturers, including an interactive WileyPLUS course. All lecturers can access supporting resources on the companion website at www.wiley.com/college/greasley including an Instructor’s Manual with suggested solutions for all case study questions and end of chapter exercises, a Test Bank and PowerPoint slides for each chapter. Students will find multiple–choice test quizzes, web–links and an online glossary. Operations Management is essential reading for all students studying operations management, whether on undergraduate, postgraduate or continuing professional development courses.
Resumo:
The research comprises a suite of studies that examines and develops the Lead Authority Partnership Scheme (LAPS) as a central intervention strategy for health and safety by local authority (LA) enforcers. Partnership working is a regulatory concept that in recent years has become more popular but there has been little research conducted to investigate, explore and evaluate its practical application. The study reviewed two contrasting approaches to partnership working between LAs and businesses, both of which were intended to secure improvements in the consistency of enforcement by the regulators and in the health and safety management systems of the participating businesses. The first was a well-established and highly prescriptive approach that required a substantial resource commitment on the part of the LA responsible for conducting a safety management review (SMR) of the business. As a result of his evaluation of the existing ‘full SMR’ scheme, the author developed a second, more flexible approach to partnership working. The research framework was based upon a primarily qualitative methodology intended to investigate and explore the impact of the new flexible arrangements for partnership working. The findings from this study of the flexible development of the scheme were compared and contrasted with those from studies of the established ‘full SMR’ scheme. A substantial degree of triangulation was applied in an attempt to strengthen validity and broaden applicability of the research findings. Key informant interviews, participant observation, document/archive reviews, questionnaires and surveys all their particular part to play in the overall study. The findings from this research revealed that LAPS failed to deliver consistency of LA enforcement across multiple-outlet businesses and the LA enforced business sectors. Improvement was however apparent in the safety management systems of the businesses participating in LAPS. Trust between LA inspector and safety professional was key to the success of the partnerships as was the commitment of these key individuals. Competition for precious LA resources, the priority afforded to food safety over health and safety, the perceived high resource demands of LAPS, and the structure and culture of LAs were identified as significant barriers to LA participation. Flexible approaches, whilst addressing the resource issues, introduced some fresh concerns relating to credibility and delivery. Over and above the stated aims of the scheme, LAs and businesses had their own reasons for participation, notably the personal development of individuals and kudos for the organisation. The research has explored the wider implications for partnership working with the overall conclusion it is most appropriately seen as a strategic level element within a broader structured intervention strategy.