20 resultados para successful building projects


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The UK government aims at achieving 80% CO2 emission reduction by 2050 which requires collective efforts across all the UK industry sectors. In particular, the housing sector has a large potential to contribute to achieving the aim because the housing sector alone accounts for 27% of the total UK CO2 emission, and furthermore, 87% of the housing which is responsible for current 27% CO2 emission will still stand in 2050. Therefore, it is essential to improve energy efficiency of existing housing stock built with low energy efficiency standard. In order for this, a whole‐house needs to be refurbished in a sustainable way by considering the life time financial and environmental impacts of a refurbished house. However, the current refurbishment process seems to be challenging to generate a financially and environmentally affordable refurbishment solution due to the highly fragmented nature of refurbishment practice and a lack of knowledge and skills about whole‐house refurbishment in the construction industry. In order to generate an affordable refurbishment solution, diverse information regarding costs and environmental impacts of refurbishment measures and materials should be collected and integrated in right sequences throughout the refurbishment project life cycle among key project stakeholders. Consequently, various researchers increasingly study a way of utilizing Building Information Modelling (BIM) to tackle current problems in the construction industry because BIM can support construction professionals to manage construction projects in a collaborative manner by integrating diverse information, and to determine the best refurbishment solution among various alternatives by calculating the life cycle costs and lifetime CO2 performance of a refurbishment solution. Despite the capability of BIM, the BIM adoption rate is low with 25% in the housing sector and it has been rarely studied about a way of using BIM for housing refurbishment projects. Therefore, this research aims to develop a BIM framework to formulate a financially and environmentally affordable whole‐house refurbishment solution based on the Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) methods simultaneously. In order to achieve the aim, a BIM feasibility study was conducted as a pilot study to examine whether BIM is suitable for housing refurbishment, and a BIM framework was developed based on the grounded theory because there was no precedent research. After the development of a BIM framework, this framework was examined by a hypothetical case study using BIM input data collected from questionnaire survey regarding homeowners’ preferences for housing refurbishment. Finally, validation of the BIM framework was conducted among academics and professionals by providing the BIM framework and a formulated refurbishment solution based on the LCC and LCA studies through the framework. As a result, BIM was identified as suitable for housing refurbishment as a management tool, and it is timely for developing the BIM framework. The BIM framework with seven project stages was developed to formulate an affordable refurbishment solution. Through the case study, the Building Regulation is identified as the most affordable energy efficiency standard which renders the best LCC and LCA results when it is applied for whole‐house refurbishment solution. In addition, the Fabric Energy Efficiency Standard (FEES) is recommended when customers are willing to adopt high energy standard, and the maximum 60% of CO2 emissions can be reduced through whole‐house fabric refurbishment with the FEES. Furthermore, limitations and challenges to fully utilize BIM framework for housing refurbishment were revealed such as a lack of BIM objects with proper cost and environmental information, limited interoperability between different BIM software and limited information of LCC and LCA datasets in BIM system. Finally, the BIM framework was validated as suitable for housing refurbishment projects, and reviewers commented that the framework can be more practical if a specific BIM library for housing refurbishment with proper LCC and LCA datasets is developed. This research is expected to provide a systematic way of formulating a refurbishment solution using BIM, and to become a basis for further research on BIM for the housing sector to resolve the current limitations and challenges. Future research should enhance the BIM framework by developing more detailed process map and develop BIM objects with proper LCC and LCA Information.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the context of the UK public policy goal to increase community and social cohesion, this article explores the nature of local 'bridge-building' – activities intended to increase interpersonal contacts between diverse ethnic, faith and nationality groups. We draw on earlier research in a range of fields to develop the bridge-building concept and present findings from a study that identified community-level projects with bridge-building as a specific aim. We show the range of groupings involved, the activities encompassed and their organisational features. We consider the actual and potential contribution of local bridge-building to cohesion in the light of earlier research and our own study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper focuses on a hitherto unstudied segment of the broad 'third sector': organisations and groupings that aim to build bridges (that is, increase interpersonal contacts) between people of different faiths and/or ethnic groups. We draw on the findings of an empirical study, conducted in three diverse urban areas of England, of community-level projects with bridge building as an explicit aim. We describe the characteristics of bridge-building activities and the challenges they face; both the organisational challenges and those that arise from the nature of bridge building itself. We conclude by exploring the implications of our findings for an understanding of the third sector generally and for the potential role of the sector in responding to our diverse society.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research traces the implementation of an information system in the form of ERP modules covering tenant and contract management in a Chinese service company. Misalignments between the ERP system specification and user needs led to the adoption of informal processes within the organisation. These processes are facilitated within an informal organisational structure and are based on human interactions undertaken within the formal organisation. Rather than to attempt to suppress the emergence of the informal organisation the company decided to channel the energies of staff involved in informal processes towards organisational goals. The company achieved this by harnessing the capabilities of what we term a hybrid ERP system, combining the functionality of a traditional (formal) ERP installation with the capabilities of Enterprise Social Software (ESS). However the company recognised that the successful operation of the hybrid ERP system would require a number of changes in organisational design in areas such as reporting structures and communication channels. A narrative provided by interviews with company personnel is thematised around the formal and informal characteristics of the organisation as defined in the literature. This leads to a definition of the characteristics of the hybrid organisation and strategies for enabling a hybrid organisation, facilitated by a hybrid ERP system, which directs formal and informal behaviour towards organisational goals and provides a template for future hybrid implementations.