20 resultados para management earnings forecast, information disclosure, Australia, continuous disclosure, litigation risk


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study describes a pragmatic approach to the implementation of production planning and scheduling techniques in foundries of all types and looks at the use of `state-of-the-art' management control and information systems. Following a review of systems for the classification of manufacturing companies, a definitive statement is made which highlights the important differences between foundries (i.e. `component makers') and other manufacturing companies (i.e. `component buyers'). An investigation of the manual procedures which are used to plan and control the manufacture of components reveals the inherent problems facing foundry production management staff, which suggests the unsuitability of many manufacturing techniques which have been applied to general engineering companies. From the literature it was discovered that computer-assisted systems are required which are primarily `information-based' rather than `decision based', whilst the availability of low-cost computers and `packaged-software' has enabled foundries to `get their feet wet' without the financial penalties which characterized many of the early attempts at computer-assistance (i.e. pre-1980). Moreover, no evidence of a single methodology for foundry scheduling emerged from the review. A philosophy for the development of a CAPM system is presented, which details the essential information requirements and puts forward proposals for the subsequent interactions between types of information and the sub-system of CAPM which they support. The work developed was oriented specifically at the functions of production planning and scheduling and introduces the concept of `manual interaction' for effective scheduling. The techniques developed were designed to use the information which is readily available in foundries and were found to be practically successful following the implementation of the techniques into a wide variety of foundries. The limitations of the techniques developed are subsequently discussed within the wider issues which form a CAPM system, prior to a presentation of the conclusions which can be drawn from the study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Enterprise Resource Planning (ERP) projects are strategic and capital intensive, so failure may be costly and even cause bankruptcy of companies. Previous studies have proposed ways for improving implementation, but they are mostly generic and follow standardized project management practices as specified in various standards (e.g. the “project management body of knowledge” of the Project Management Institute). Because ERP is interdisciplinary (involving change management, project management and information technology management), it warrants a customized approach to managing risks throughout the life cycle of implementation and operation. Through a practical case study, this paper demonstrates a qualitative, user friendly approach to ERP project risk management. Firstly, through a literature review it identifies various risk factors in ERP implementation. Secondly, the risk management practices of a UK-based multinational consulting company in one of its clients are evaluated. The risk factors from the case study organization and literature are then compared and discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article argues that, post Enron, governance reforms around the world have served to raise the profile of risk management, and emphasise the need for a corporate wide approach to internal control that is overseen by the Board of Directors. In the US, this is most clearly demonstrated by the emergence of Enterprise Risk Management (ERM), defined as 'a process, effected by an entity's board of directors, management and other personnel, applied in strategy setting across the enterprise, designed to identify potential events that may affect the entity, and manage risk to be within its risk appetite, to provide reasonable assurance regarding the achievement of entity objectives.' (COSO, 2004, p.2). In practical terms, however, the introduction of an enterprise wide holistic risk management system poses a big challenge to all but the smallest of organisations. The financial crisis has clearly shown that enterprise wide risk management remains a dream rather than a reality for even the world's largest and once highly respected companies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, the rapid spread of smartphones has led to the increasing popularity of Location-Based Social Networks (LBSNs). Although a number of research studies and articles in the press have shown the dangers of exposing personal location data, the inherent nature of LBSNs encourages users to publish information about their current location (i.e., their check-ins). The same is true for the majority of the most popular social networking websites, which offer the possibility of associating the current location of users to their posts and photos. Moreover, some LBSNs, such as Foursquare, let users tag their friends in their check-ins, thus potentially releasing location information of individuals that have no control over the published data. This raises additional privacy concerns for the management of location information in LBSNs. In this paper we propose and evaluate a series of techniques for the identification of users from their check-in data. More specifically, we first present two strategies according to which users are characterized by the spatio-temporal trajectory emerging from their check-ins over time and the frequency of visit to specific locations, respectively. In addition to these approaches, we also propose a hybrid strategy that is able to exploit both types of information. It is worth noting that these techniques can be applied to a more general class of problems where locations and social links of individuals are available in a given dataset. We evaluate our techniques by means of three real-world LBSNs datasets, demonstrating that a very limited amount of data points is sufficient to identify a user with a high degree of accuracy. For instance, we show that in some datasets we are able to classify more than 80% of the users correctly.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main purpose of the study is to develop an integrated framework for managing project risks by analyzing risk across project, work package and activity levels, and developing responses. Design/methodology/approach: The study first reviews the literature of various contemporary risk management frameworks in order to identify gaps in project risk management knowledge. Then it develops a conceptual risk management framework using combined analytic hierarchy process (AHP) and risk map for managing project risks. The proposed framework has then been applied to a 1500 km oil pipeline construction project in India in order to demonstrate its effectiveness. The concerned project stakeholders were involved through focus group discussions for applying the proposed risk management framework in the project under study. Findings: The combined AHP and risk map approach is very effective to manage project risks across project, work package and activity levels. The risk factors in project level are caused because of external forces such as business environment (e.g. customers, competitors, technological development, politics, socioeconomic environment). The risk factors in work package and activity levels are operational in nature and created due to internal causes such as lack of material and labor productivity, implementation issues, team ineffectiveness, etc. Practical implications: The suggested model can be applied to any complex project and helps manage risk throughout the project life cycle. Originality/value: Both business and operational risks constitute project risks. In one hand, the conventional project risk management frameworks emphasize on managing business risks and often ignore operational risks. On the other hand, the studies that deal with operational risk often do not link them with business risks. However, they need to be addressed in an integrated way as there are a few risks that affect only the specific level. Hence, this study bridges the gaps. © 2010 Elsevier B.V. All rights reserved.