17 resultados para karavan, dani
Resumo:
Since privatisation, maintenance of DNO LV feeder maximum demand information has gradually demised in some Utility Areas, and it is postulated that lack of knowledge about 11kV and LV electrical networks is resulting in a less economical and energy efficient Network as a whole. In an attempt to quantify the negative impact, this paper examines ten postulated new connection scenarios for a set of real LV load readings, in order to find the difference in design solutions when LV load readings were and were not known. The load profiles of the substations were examined in order to explore the utilisation profile. It was found that in 70% of the scenarios explored, significant cost differences were found. These cost differences varied by an average of 1000%, between schemes designed with and without load readings. Obviously, over designing a system and therefore operating more, underutilised transformers becomes less financially beneficial and less energy efficient. The paper concludes that new connection design is improved in terms of cost when carried out based on known LV load information and enhances the case for regular maximum feeder demand information and/or metering of LV feeders. © 2013 IEEE.
Resumo:
Automatic load transfer (ALT) on the 11 kV network is the process by which circuit breakers on the network are switched to form open points in order to feed load from different primary substations. Some of the potential benefits that may be gained from dynamically using ALT include maximising utilisation of existing assets, voltage regulation and reduced losses. One of the key issues, that has yet to be properly addressed in published research, is how to validate that the modelled benefits really exist. On an 11 kV distribution network where the load is continually changing and the load on each distribution substation is unlikely to be monitored - reduction in losses from moving the normally open point is particularly difficult to prove. This study proposes a method to overcome this problem and uses measured primary feeder data from two parts of the Western Power Distribution 11 kV Network under different configurations. The process of choosing the different configurations is based on a heuristic modelling method of locating minimum voltages to help reduce losses.