25 resultados para implementation project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: The Respiratory Health Network in Western Australia developed the Asthma Model of Care in 2010 which incorporates best practice guidelines. At the same time short-acting beta agonist guidelines (SABA) were developed by stakeholder consensus at University of Western Australia (UWA) and incorporated the use of an Asthma Action Plan Card. Objective: To report on the implementation of a key component of the WA Asthma Model of Care, the SABA guidelines that incorporate the Asthma Action Plan card. Methods: Implementation strategies included lectures, direct pharmacy detailing, media releases, and information packs (postal and electronic). Groups targeted included pharmacists, consumers and medical practitioners. Results: State-based (n=18) and national (n=6) professional organisations were informed about the launch of the guidelines into practice in WA. In the four-month implementation period more than 47,000 Asthma Action Plan Cards were distributed, primarily to community pharmacies. More than 500 pharmacies were provided with information packs or individual detailing. More than 10,000 consumers were provided with information about the guidelines. Conclusions and implications: The collaboration of stakeholders in this project allowed for widespread access to various portals which, in turn, resulted in a multifaceted approach in disseminating information. Ongoing maintenance programs are required to sustain and build on the momentum of the implementation program and to ultimately address patient outcomes and practice change, which would be the longer-term goals of such a project. Future research will seek to ascertain the impact of the card on patient outcomes in WA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper analyzes a case study of wireless network implementation in a politically sensitive environment and seeks to gain practical insights for IT managers in today’s networked economy. The case evolved around an urgent decision to implement wireless networks that were a radical replacement for the existing wired network infrastructure. Although the wireless network infrastructure was well calculated as being considerably cost-efficient, inexperienced administrators and IT department failed to consult various involved stakeholders. Consequently, unintended results of wireless network implementation entangled with the cost efficiency of technology outcome and in turn undermined the objectives and achievement of the initial project plan. Drawing from social perspectives, this case study challenges traditionally dominant perspectives of technology efficiency and summarizes several lessons that could help IT managers and policy makers to better strategize ICT in general, and wireless networks in particular.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Implementation of Enterprise Resource Planning (ERP) systems require huge investments while ineffective implementations of such projects are commonly observed. A considerable number of these projects have been reported to fail or take longer than it was initially planned, while previous studies show that the aim of rapid implementation of such projects has not been successful and the failure of the fundamental goals in these projects have imposed huge amounts of costs on investors. Some of the major consequences are the reduction in demand for such products and the introduction of further skepticism to the managers and investors of ERP systems. In this regard, it is important to understand the factors determining success or failure of ERP implementation. The aim of this paper is to study the critical success factors (CSFs) in implementing ERP systems and to develop a conceptual model which can serve as a basis for ERP project managers. These critical success factors that are called “core critical success factors” are extracted from 62 published papers using the content analysis and the entropy method. The proposed conceptual model has been verified in the context of five multinational companies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes the work undertaken in the Scholarly Ontologies Project. The aim of the project has been to develop a computational approach to support scholarly sensemaking, through interpretation and argumentation, enabling researchers to make claims: to describe and debate their view of a document's key contributions and relationships to the literature. The project has investigated the technicalities and practicalities of capturing conceptual relations, within and between conventional documents in terms of abstract ontological structures. In this way, we have developed a new kind of index to distributed digital library systems. This paper reports a case study undertaken to test the sensemaking tools developed by the Scholarly Ontologies project. The tools used were ClaiMapper, which allows the user to sketch argument maps of individual papers and their connections, ClaiMaker, a server on which such models can be stored and saved, which provides interpretative services to assist the querying of argument maps across multiple papers and ClaimFinder, a novice interface to the search services in ClaiMaker.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of Total Productive Maintenance (TPM) is to maximise plant and equipment effectiveness, to create a sense of ownership for operators, and promote continuous improvement through small group activities involving production, engineering and maintenance personnel. This paper describes and analyses a case study of TPM implementation at a newspaper printing house in Singapore. However, rather than adopting more conventional implementation methods such as employing consultants or through a project using external training, a unique approach was adopted based on Action Research using a spiral of cycles of planning, acting observing and reflecting. An Action Research team of company personnel was specially formed to undertake the necessary fieldwork. The team subsequently assisted with administering the resulting action plan. The main sources of maintenance and operational data were from interviews with shop floor workers, participative observation and reviews conducted with members of the team. Content analysis using appropriate statistical techniques was used to test the significance of changes in performance between the start and completion of the TPM programme. The paper identifies the characteristics associated with the Action Research method when used to implement TPM and discusses the applicability of the approach in related industries and processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The main purpose of the study is to develop an integrated framework for managing project risks by analyzing risk across project, work package and activity levels, and developing responses. Design/methodology/approach: The study first reviews the literature of various contemporary risk management frameworks in order to identify gaps in project risk management knowledge. Then it develops a conceptual risk management framework using combined analytic hierarchy process (AHP) and risk map for managing project risks. The proposed framework has then been applied to a 1500 km oil pipeline construction project in India in order to demonstrate its effectiveness. The concerned project stakeholders were involved through focus group discussions for applying the proposed risk management framework in the project under study. Findings: The combined AHP and risk map approach is very effective to manage project risks across project, work package and activity levels. The risk factors in project level are caused because of external forces such as business environment (e.g. customers, competitors, technological development, politics, socioeconomic environment). The risk factors in work package and activity levels are operational in nature and created due to internal causes such as lack of material and labor productivity, implementation issues, team ineffectiveness, etc. Practical implications: The suggested model can be applied to any complex project and helps manage risk throughout the project life cycle. Originality/value: Both business and operational risks constitute project risks. In one hand, the conventional project risk management frameworks emphasize on managing business risks and often ignore operational risks. On the other hand, the studies that deal with operational risk often do not link them with business risks. However, they need to be addressed in an integrated way as there are a few risks that affect only the specific level. Hence, this study bridges the gaps. © 2010 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Time, cost and quality are the prime objectives of any project. Unfortunately, today’s project management does not always ensure the realisation of these objectives. The main reasons of project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation, under-estimation and mis-estimation. An overall organisational approach with the application of appropriate management philosophies, tools and techniques can only solve the problem. The present study establishes a methodology for achieving success in implementing projects using a business process re-engineering (BPR) framework. Internal performance characteristics are introspected through condition diagnosis that identifies and prioritises areas of concern requiring attention. Process re-engineering emerges as a most critical area for immediate attention. Project process re-engineering is carried out by eliminating non-value added activities, taking up activities concurrently by applying information systems rigorously and applying risk management techniques throughout the project life cycle. The overall methodology is demonstrated through applications to cross country petroleum pipeline project organisation in an Indian scenario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent technological advances have paved the way for developing and offering advanced services for the stakeholders in the agricultural sector. A paradigm shift is underway from proprietary and monolithic tools to Internet-based, cloud hosted, open systems that will enable more effective collaboration between stakeholders. This new paradigm includes the technological support of application developers to create specialized services that will seamlessly interoperate, thus creating a sophisticated and customisable working environment for the end users. We present the implementation of an open architecture that instantiates such an approach, based on a set of domain independent software tools called "generic enablers" that have been developed in the context of the FI-WARE project. The implementation is used to validate a number of innovative concepts for the agricultural sector such as the notion of a services' market place and the system's adaptation to network failures. During the design and implementation phase, the system has been evaluated by end users, offering us valuable feedback. The results of the evaluation process validate the acceptance of such a system and the need of farmers to have access to sophisticated services at affordable prices. A summary of this evaluation process is also presented in this paper. © 2013 Elsevier B.V.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In ensuring the quality of learning and teaching in Higher Education, self-evaluation is an important component of the process. An example would be the approach taken within the CDIO community whereby self-evaluation against the CDIO standards is part of the quality assurance process. Eight European universities (Reykjavik University, Iceland; Turku University of Applied Sciences, Finland; Aarhus University, Denmark; Helsinki Metropolia University of Applied Sciences, Finland; Ume? University, Sweden; Telecom Bretagne, France; Aston University, United Kingdom; Queens University Belfast, United Kingdom) are engaged in an EU funded Erasmus + project that is exploring the quality assurance process associated with active learning. The development of a new self-evaluation framework that feeds into a ?Marketplace? where participating institutions can be paired up and then engage in peer evaluations and sharing around each institutions approach to and implementation of active learning. All of the partner institutions are engaged in the application of CDIO within their engineering programmes and this has provided a common starting point for the partnership to form and the project to be developed. Although the initial focus will be CDIO, the longer term aim is that the approach could be of value beyond CDIO and within other disciplines. The focus of this paper is the process by which the self-evaluation framework is being developed and the form of the draft framework. In today?s Higher Education environment, the need to comply with Quality Assurance standards is an ever present feature of programme development and review. When engaging in a project that spans several countries, the wealth of applicable standards and guidelines is significant. In working towards the development of a robust Self Evaluation Framework for this project, the project team decided to take a wide view of the available resources to ensure a full consideration of different requirements and practices. The approach to developing the framework considered: a) institutional standards and processes b) national standards and processes e.g. QAA in the UK c) documents relating to regional / global accreditation schemes e.g. ABET d) requirements / guidelines relating to particular learning and teaching frameworks e.g. CDIO. The resulting draft self-evaluation framework is to be implemented within the project team to start with to support the initial ?Marketplace? pairing process. Following this initial work, changes will be considered before a final version is made available as part of the project outputs. Particular consideration has been paid to the extent of the framework, as a key objective of the project is to ensure that the approach to quality assurance has impact but is not overly demanding in terms of time or paperwork. In other words that it is focused on action and value added to staff, students and the programmes being considered.