32 resultados para facts of risk


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Age related macular degeneration (AMD) is the leading cause of blindness in individuals older than 65 years of age. It is a multifactorial disorder and identification of risk factors enables individuals to make life style choices that may reduce the risk of disease. This review discusses the role of genetics, sunlight, diet, cardiovascular factors, smoking, and alcohol as possible risk factors for AMD. Genetics plays a more significant role in AMD than previously thought, especially in younger patients, histocompatibility locus antigen (HLA) and complement system genes being the most significant. Whether the risk of AMD is increased by exposure to sunlight, cardiovascular risk factors, and diet is more controversial. Smoking is the risk factor most consistently associated with AMD. Current smokers are exposed to a two to three times higher risk of AMD than non-smokers and the risk increases with intensity of smoking. Moderate alcohol consumption is unlikely to increase the risk of AMD. Optometrists as front-line informers and educators of ocular health play a significant role in increasing public awareness of the risks of AMD. Cessation of smoking, the use of eye protection in high light conditions, dietary changes, and regular use of dietary supplements should all be considered to reduce the lifetime risk of AMD.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper uses empirical evidence to examine the operational dynamics and paradoxical nature of risk management systems in the banking sector. It demonstrates how a core paradox of market versus regulatory demands and an accompanying variety of performance, learning and belonging paradoxes underlie evident tensions in the interaction between front and back office staff in banks. Organisational responses to such paradoxes are found to range from passive to proactive, reflecting differing organisational, departmental and individual risk culture(s), and performance management systems. Nonetheless, a common feature of regulatory initiatives designed to secure a more structurally independent risk management function is that they have failed to rectify a critical imbalance of power - with the back office control functions continuing to be dominated by front office trading and investment functions. Ultimately, viewing the 'core' of risk management systems as a series of connected paradoxes rather than a set of assured, robust practices, requires a fundamental switch in emphasis away from a normative, standards-based approach to risk management to one which gives greater recognition to its behavioural dimensions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis presents a two-dimensional Risk Assessment Method (RAM) where the assessment of risk to the groundwater resources incorporates both the quantification of the probability of the occurrence of contaminant source terms, as well as the assessment of the resultant impacts. The approach emphasizes the need for a greater dependency on the potential pollution sources, rather than the traditional approach where assessment is based mainly on the intrinsic geo-hydrologic parameters. The risk is calculated using Monte Carlo simulation methods whereby random pollution events were generated to the same distribution as historically occurring events or a priori potential probability distribution. Integrated mathematical models then simulate contaminant concentrations at the predefined monitoring points within the aquifer. The spatial and temporal distributions of the concentrations were calculated from repeated realisations, and the number of times when a user defined concentration magnitude was exceeded is quantified as a risk. The method was setup by integrating MODFLOW-2000, MT3DMS and a FORTRAN coded risk model, and automated, using a DOS batch processing file. GIS software was employed in producing the input files and for the presentation of the results. The functionalities of the method, as well as its sensitivities to the model grid sizes, contaminant loading rates, length of stress periods, and the historical frequencies of occurrence of pollution events were evaluated using hypothetical scenarios and a case study. Chloride-related pollution sources were compiled and used as indicative potential contaminant sources for the case study. At any active model cell, if a random generated number is less than the probability of pollution occurrence, then the risk model will generate synthetic contaminant source term as an input into the transport model. The results of the applications of the method are presented in the form of tables, graphs and spatial maps. Varying the model grid sizes indicates no significant effects on the simulated groundwater head. The simulated frequency of daily occurrence of pollution incidents is also independent of the model dimensions. However, the simulated total contaminant mass generated within the aquifer, and the associated volumetric numerical error appear to increase with the increasing grid sizes. Also, the migration of contaminant plume advances faster with the coarse grid sizes as compared to the finer grid sizes. The number of daily contaminant source terms generated and consequently the total mass of contaminant within the aquifer increases in a non linear proportion to the increasing frequency of occurrence of pollution events. The risk of pollution from a number of sources all occurring by chance together was evaluated, and quantitatively presented as risk maps. This capability to combine the risk to a groundwater feature from numerous potential sources of pollution proved to be a great asset to the method, and a large benefit over the contemporary risk and vulnerability methods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is both time-wasting and expensive. A risk-based model that reduces the amount of time spent on inspection has been presented. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests efficient design and operation philosophy, construction methodology and logical insurance plans. The risk-based model uses Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique, to identify the factors that influence failure on specific segments and analyzes their effects by determining probability of risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost, and the cumulative effect of failure is determined through probability analysis. The technique does not totally eliminate subjectivity, but it is an improvement over the existing inspection method.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Enterprise Risk Management (ERM) and Knowledge Management (KM) both encompass top-down and bottom-up approaches developing and embedding risk knowledge concepts and processes in strategy, policies, risk appetite definition, the decision-making process and business processes. The capacity to transfer risk knowledge affects all stakeholders and understanding of the risk knowledge about the enterprise's value is a key requirement in order to identify protection strategies for business sustainability. There are various factors that affect this capacity for transferring and understanding. Previous work has established that there is a difference between the influence of KM variables on Risk Control and on the perceived value of ERM. Communication among groups appears as a significant variable in improving Risk Control but only as a weak factor in improving the perceived value of ERM. However, the ERM mandate requires for its implementation a clear understanding, of risk management (RM) policies, actions and results, and the use of the integral view of RM as a governance and compliance program to support the value driven management of the organization. Furthermore, ERM implementation demands better capabilities for unification of the criteria of risk analysis, alignment of policies and protection guidelines across the organization. These capabilities can be affected by risk knowledge sharing between the RM group and the Board of Directors and other executives in the organization. This research presents an exploratory analysis of risk knowledge transfer variables used in risk management practice. A survey to risk management executives from 65 firms in various industries was undertaken and 108 answers were analyzed. Potential relationships among the variables are investigated using descriptive statistics and multivariate statistical models. The level of understanding of risk management policies and reports by the board is related to the quality of the flow of communication in the firm and perceived level of integration of the risk policy in the business processes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Strategic sourcing has increased in importance in recent years, and now plays an important role in companies’ planning. The current volatility in supply markets means companies face multiple challenges involving lock-in situations, supplier bankruptcies or supply security issues. In addition, their exposure can increase due to natural disasters, as witnessed recently in the form of bird flu, volcanic ash and tsunamis. Therefore, the primary focus of this study is risk management in the context of strategic sourcing. The study presents a literature review on sourcing based on the 15 years from 1998–2012, and considers 131 academic articles. The literature describes strategic sourcing as a strategic, holistic process in managing supplier relationships, with a long-term focus on adding value to the company and realising competitive advantage. Few studies discovered the real risk impact and status of risk management in strategic sourcing, and evaluation across countries and industries was limited, with the construction sector particularly under-researched. This methodology is founded on a qualitative study of twenty cases across Ger-many and the United Kingdom from the construction sector and electronics manufacturing industries. While considering risk management in the context of strategic sourcing, the thesis takes into account six dimensions that cover trends in strategic sourcing, theoretical and practical sourcing models, risk management, supply and demand management, critical success factors and the strategic supplier evaluation. The study contributes in several ways. First, recent trends are traced and future needs identified across the research dimensions of countries, industries and companies. Second, it evaluates critical success factors in contemporary strategic sourcing. Third, it explores the application of theoretical and practical sourcing models in terms of effectiveness and sustainability. Fourth, based on the case study findings, a risk-oriented strategic sourcing framework and a model for strategic sourcing are developed. These are based on the validation of contemporary requirements and a critical evaluation of the existing situation. It contemplates the empirical findings and leads to a structured process to manage risk in strategic sourcing. The risk-oriented framework considers areas such as trends, corporate and sourcing strategy, critical success factors, strategic supplier selection criteria, risk assessment, reporting, strategy alignment and reporting. The proposed model highlights the essential dimensions in strategic sourcing and guides us to a new definition of strategic sourcing supported by this empirical study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Supply Chain Risk Management (SCRM) has become a popular area of research and study in recent years. This can be highlighted by the number of peer reviewed articles that have appeared in academic literature. This coupled with the realisation by companies that SCRM strategies are required to mitigate the risks that they face, makes for challenging research questions in the field of risk management. The challenge that companies face today is not only to identify the types of risks that they face, but also to assess the indicators of risk that face them. This will allow them to mitigate that risk before any disruption to the supply chain occurs. The use of social network theory can aid in the identification of disruption risk. This thesis proposes the combination of social networks, behavioural risk indicators and information management, to uniquely identify disruption risk. The propositions that were developed from the literature review and exploratory case study in the aerospace OEM, in this thesis are:- By improving information flows, through the use of social networks, we can identify supply chain disruption risk. - The management of information to identify supply chain disruption risk can be explored using push and pull concepts. The propositions were further explored through four focus group sessions, two within the OEM and two within an academic setting. The literature review conducted by the researcher did not find any studies that have evaluated supply chain disruption risk management in terms of social network analysis or information management studies. The evaluation of SCRM using these methods is thought to be a unique way of understanding the issues in SCRM that practitioners face today in the aerospace industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Risk management and knowledge management have so far been studied almost independently. The evolution of risk management to the holistic view of Enterprise Risk Management requires the destruction of barriers between organizational silos and the exchange and application of knowledge from different risk management areas. However, knowledge management has received little or no attention in risk management. This paper examines possible relationships between knowledge management constructs related to knowledge sharing, and two risk management concepts: perceived quality of risk control and perceived value of enterprise risk management. From a literature review, relationships with eight knowledge management variables covering people, process and technology aspects were hypothesised. A survey was administered to risk management employees in financial institutions. The results showed that the perceived quality of risk control is significantly associated with four knowledge management variables: perceived quality of risk knowledge sharing, perceived quality of communication among people, web channel functionality, and risk management information system functionality. However, the relationships of the knowledge management variables to the perceived value of enterprise risk management are not significant. We conclude that better knowledge management is associated with better risk control, but that more effort needs to be made to break down organizational silos in order to support true Enterprise Risk Management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Definitions and perceptions of the role and styles of risk management, and performance management/strategic control systems have evolved over time, but it can be argued that risk management is primarily concerned with ensuring the achievement of strategic objectives. This paper shows the extent of overlap between a broad-based view of risk management, namely Enterprise Risk Management (ERM), and the balanced scorecard, which is a widely used strategic control system. A case study of one of the UK's largest retailers, Tesco plc, is used to show how ERM can be introduced as part of an existing strategic control system. The case demonstrates that, despite some differences in lines of communications, the strategic controls and risk controls can be used to achieve a common objective. Adoption of such an integrated approach, however, has implications for the profile of risk and the overall risk culture within an organisation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper explores the process of developing a principled approach for translating a model of mental-health risk expertise into a probabilistic graphical structure. The Galatean Risk Screening Tool [1] is a psychological model for mental health risk assessment based on fuzzy sets. This paper details how the knowledge encapsulated in the psychological model was used to develop the structure of the probability graph by exploiting the semantics of the clinical expertise. These semantics are formalised by a detailed specification for an XML structure used to represent the expertise. The component parts were then mapped to equivalent probabilistic graphical structures such as Bayesian Belief Nets and Markov Random Fields to produce a composite chain graph that provides a probabilistic classification of risk expertise to complement the expert clinical judgements. © Springer-Verlag 2010.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is both time-wasting and expensive. A risk-based model that reduces the amount of time spent on inspection has been presented. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests an efficient design and operation philosophy, construction methodology, and logical insurance plans. The risk-based model uses the analytic hierarchy process (AHP), a multiple-attribute decision-making technique, to identify the factors that influence failure on specific segments and to analyze their effects by determining probability of risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost, and the cumulative effect of failure is determined through probability analysis. The technique does not totally eliminate subjectivity, but it is an improvement over the existing inspection method.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The existing method of pipeline monitoring, which requires an entire pipeline to be inspected periodically, wastes time and is expensive. A risk-based model that reduces the amount of time spent on inspection has been developed. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests an efficient design and operation philosophy, construction method and logical insurance plans.The risk-based model uses analytic hierarchy process, a multiple attribute decision-making technique, to identify factors that influence failure on specific segments and analyze their effects by determining the probabilities of risk factors. The severity of failure is determined through consequence analysis, which establishes the effect of a failure in terms of cost caused by each risk factor and determines the cumulative effect of failure through probability analysis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.