19 resultados para contracting


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper reports on a part of work for the UNIDO initiative on technology transfer for sustainable industrial development. The proposed technology transfer framework, adapted from the East Asian late industrialisers model, identifies two categories of countries requiring support for enhancing their technological capabilities: (a) very late industrialisers (“low income” developing countries), and (b) slow industrialisers (countries with sizeable manufacturing sectors but limited success in gaining international competitiveness) and three technology transfer routes: (a) through trade and aid to strengthen indigenous production for domestic markets (Route 1); (b) through FDI and contracting to develop export oriented firms (Route 2), and (c) through the supply chain of capital equipment and materials to develop local subcontracting capacity (Route 3). Very late industrialisers need support to start with Route 1 in selected sectors and upgrade through imported mature technologies. Appropriate product innovations are also possible. The slow industrialisers have more scope for increased technology transfer through Routes 2 and 3.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to understand how reverse resource exchanges and resource dependencies are managed in the service supply chain (SSC) of returnable transport packaging (RTP). Design/methodology/approach: A single case study was conducted in the context of automotive logistics focusing on the RTP SSC. Data were collected through 16 interviews, primarily with managers of a logistics service provider (LSP) and document analysis of contractual agreements with key customers of the packaging service. Findings: Resource dependencies among actors in the SSC result from the importance of the RTP for the customer’s production processes, the competition among users for RTP and the negative implications of the temporary unavailability of RTP for customers and the LSP (in terms of service performance). Amongst other things, the LSP is dependent on its customers and third-party users (e.g. the customer’s suppliers) for the timely return of package resources. The role of inter-firm integration and collaboration, formal contracts as well as customers’ power and influence over third-party RTP users are stressed as key mechanisms for managing LSP’s resource dependencies. Research limitations/implications: A resource dependence theory (RDT) lens is used to analyse how reverse resource exchanges and associated resource dependencies in SSCs are managed, thus complementing the existing SSC literature emphasising the bi-directionality of resource flows. The study also extends the recent SSC literature stressing the role of contracting by empirically demonstrating how formal contracts can be mobilised to explicate resource dependencies and to specify, and regulate, reverse exchanges in the SSC. Practical implications: The research suggests that logistics providers can effectively manage their resource dependencies and regulate reverse exchanges in the SSC by deploying contractual governance mechanisms and leveraging their customers’ influence over third-party RTP users. Originality/value: The study is novel in its application of RDT, which enhances our understanding of the management of reverse exchanges and resource dependencies in SSCs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The deployment of bioenergy technologies is a key part of UK and European renewable energy policy. A key barrier to the deployment of bioenergy technologies is the management of biomass supply chains including the evaluation of suppliers and the contracting of biomass. In the undeveloped biomass for energy market buyers of biomass are faced with three major challenges during the development of new bioenergy projects. What characteristics will a certain supply of biomass have, how to evaluate biomass suppliers and which suppliers to contract with in order to provide a portfolio of suppliers that best satisfies the needs of the project and its stakeholder group whilst also satisfying crisp and non-crisp technological constraints. The problem description is taken from the situation faced by the industrial partner in this research, Express Energy Ltd. This research tackles these three areas separately then combines them to form a decision framework to assist biomass buyers with the strategic sourcing of biomass. The BioSS framework. The BioSS framework consists of three modes which mirror the development stages of bioenergy projects. BioSS.2 mode for early stage development, BioSS.3 mode for financial close stage and BioSS.Op for the operational phase of the project. BioSS is formed of a fuels library, a supplier evaluation module and an order allocation module, a Monte-Carlo analysis module is also included to evaluate the accuracy of the recommended portfolios. In each mode BioSS can recommend which suppliers should be contracted with and how much material should be purchased from each. The recommended blend should have chemical characteristics within the technological constraints of the conversion technology and also best satisfy the stakeholder group. The fuels library is made up from a wide variety of sources and contains around 100 unique descriptions of potential biomass sources that a developer may encounter. The library takes a wide data collection approach and has the aim of allowing for estimates to be made of biomass characteristics without expensive and time consuming testing. The supplier evaluation part of BioSS uses a QFD-AHP method to give importance weightings to 27 different evaluating criteria. The evaluating criteria have been compiled from interviews with stakeholders and policy and position documents and the weightings have been assigned using a mixture of workshops and expert interview. The weighted importance scores allow potential suppliers to better tailor their business offering and provides a robust framework for decision makers to better understand the requirements of the bioenergy project stakeholder groups. The order allocation part of BioSS uses a chance-constrained programming approach to assign orders of material between potential suppliers based on the chemical characteristics of those suppliers and the preference score of those suppliers. The optimisation program finds the portfolio of orders to allocate to suppliers to give the highest performance portfolio in the eyes of the stakeholder group whilst also complying with technological constraints. The technological constraints can be breached if the decision maker requires by setting the constraint as a chance-constraint. This allows a wider range of biomass sources to be procured and allows a greater overall performance to be realised than considering crisp constraints or using deterministic programming approaches. BioSS is demonstrated against two scenarios faced by UK bioenergy developers. The first is a large scale combustion power project, the second a small scale gasification project. The Bioss is applied in each mode for both scenarios and is shown to adapt the solution to the stakeholder group importance and the different constraints of the different conversion technologies whilst finding a globally optimal portfolio for stakeholder satisfaction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This edition of the guide to the law of contract takes account of the implications of Internet contracting and includes discussion of the Consumer Protection (Distance Selling) Regulations 2000. Where appropriate, reference is made, for reasons of comparison, to the principles contained in thePrinciples of European Contract Law (PECL) and the UNIDROIT Principles of International Commercial Contracts.;Significant developments in contract law, both statutory and case law, are discussed, including the Contracts (Rights of Third Parties) Act 1999, the Electronic Communications Act 2000 andthe House of Lords' decisions in Alfred McAlpine Construction Ltd v Panatown Ltd and Attorney General V Blake. Other important decisions covered in this revised edition are Royal Bank of Scotland v Etridge, Barclays Bank Plc v Coleman, Barclays Bank Plc v Boulter, Avon Insurance v Swire, Zanzibar vBritish Aerospace (Lancsaster House) Ltd and Nutt v Read. In addition, there is discussion of the Unfair Terms in Consumer Contracts Regulations 1999 and the European Commission's Review of the Unfair Terms Directive, as well as coverage of Director General of Fair Trading v First National Bank. Other decisions on illegality, onerous terms, constructionand repudiation of contract are included.