30 resultados para Safety, Construction management, Statistics
Resumo:
This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.
Resumo:
This research was conducted at the Space Research and Technology Centre o the European Space Agency at Noordvijk in the Netherlands. ESA is an international organisation that brings together a range of scientists, engineers and managers from 14 European member states. The motivation for the work was to enable decision-makers, in a culturally and technologically diverse organisation, to share information for the purpose of making decisions that are well informed about the risk-related aspects of the situations they seek to address. The research examined the use of decision support system DSS) technology to facilitate decision-making of this type. This involved identifying the technology available and its application to risk management. Decision-making is a complex activity that does not lend itself to exact measurement or precise understanding at a detailed level. In view of this, a prototype DSS was developed through which to understand the practical issues to be accommodated and to evaluate alternative approaches to supporting decision-making of this type. The problem of measuring the effect upon the quality of decisions has been approached through expert evaluation of the software developed. The practical orientation of this work was informed by a review of the relevant literature in decision-making, risk management, decision support and information technology. Communication and information technology unite the major the,es of this work. This allows correlation of the interests of the research with European public policy. The principles of communication were also considered in the topic of information visualisation - this emerging technology exploits flexible modes of human computer interaction (HCI) to improve the cognition of complex data. Risk management is itself an area characterised by complexity and risk visualisation is advocated for application in this field of endeavour. The thesis provides recommendations for future work in the fields of decision=making, DSS technology and risk management.
Resumo:
This thesis describes a study of the content and applicability of BS8800:1996 Guide to occupational health and safety management systems. The research is presented chronologically, with literature review and content analysis of SMS related guides and standards interwoven with two elements of qualitative empirical work. The first of these was carried out shortly after publication of BS8800 in 1996, a 'before-the-event' investigation of how organisations were intending to approach SMS implementation. The challenges faced by these organisations are reviewed against standard management theory, suggesting that the initial motivation for SMS implementation governs the approach organisations will adopt to guidance such as BS8800. The second phase of empirical work was undertaken in the context of OHSAS 18001, an auditable protocol based on BS8800, which allows organisations to certify their safety management systems. A discussion of the evolution of certifiable safety management system is presented, highlighting the similarities and differences between this, BS8800, SMS and wider management system standards. A case study then reviews the experiences of a catering company that implemented 18001, motivated by the opportunity for certification as a business benefit. The empirical work is used to comment on the guidance provided by BS8800, within its evolved role as guidance organisations may use for implementation of a SMS to be certified according to the specifications of OHSAS 18001. It is suggested that optimal implementation is facilitated by initial status review, continual improvement and the use of annexes, where there are used to make changes to the existing safety management system. This thesis concludes with a discussion of these elements, highlighting pertinent areas within BS8800 where revision or amendment may be appropriate.
Resumo:
There has been little research in health and safety management concernmg the application of information technology to the field. This thesis attempts to stimulate interest in this area by analysing the value of proprietary health and safety software to proactive health and safety management. The thesis is based upon the detailed software evaluation of seven pieces of proprietary health and safety software. It features a discussion concerning the development of information technology and health and safety management, a review of the key issues identified during the software evaluations, an analysis of the commercial market for this type of software, and a consideration of the broader issues which surround the use of this software. It also includes practical guidance for the evaluation, selection, implementation and maintenance of all health and safety management software. This includes a comprehensive software evaluation chart. The implications of the research are considered for proprietary health and safety software, the application of information technology to health and safety management, and for future research.
Resumo:
A prominent theme emerging in Occupational Health and Safety (OSH) is the development of management systems. A range of interventions, according to a prescribed route detailed by one of the management systems, can be introduced into an organisation with some expectation of improved OSH performance. This thesis attempts to identify the key influencing factors that may impact upon the process of introducing interventions, (according to B88800: 1996, Guide to Implementing Occupational Health and Safety Management Systems) into an organisation. To help identify these influencing factors a review of possible models from the sphere of Total Quality Management (TQM) was undertaken and the most suitable TQM model selected for development and use in aSH. By anchoring the aSH model's development in the reviewed literature a range ofeare, medium and low level influencing factors were identified. This model was developed in conjunction with the research data generated within the case study organisation (rubber manufacturer) and applied to the organisation. The key finding was that the implementation of an OSH intervention was dependant upon three broad vectors of influence. These are the Incentive to introduce change within an organisation which refers to the drivers or motivators for OSH. Secondly the Ability within the management team to actually implement the changes refers to aspects, amongst others, such as leadership, commitment and perceptions of OSH. Ability is in turn itself influenced by the environment within which change is being introduced. TItis aspect of Receptivity refers to the history of the plant and characteristics of the workforce. Aspects within Receptivity include workforce profile and organisational policies amongst others. It was found that the TQM model selected and developed for an OSH management system intervention did explain the core influencing factors and their impact upon OSH performance. It was found that within the organisation the results that may have been expected from implementation of BS8800:1996 were not realised. The OSH model highlighted that given the organisation's starting point, a poor appreciation of the human factors of OSH, gave little reward for implementation of an OSH management system. In addition it was found that general organisational culture can effectively suffocate any attempts to generate a proactive safety culture.
Resumo:
Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.
Resumo:
Research in safety management has been inhibited by lack of consensus as to the definitions of the terms with which it is concerned and, in general, the lack of an agreed theoretical framework within which to collate and contrast empirical findings. This thesis sets out definitions of key terms (hazard, risk, accident, incident and safety) and provides a theoretical framework. This framework has been informed by many sources but especially the Management Oversight and Risk Tree (MORT), cybernetics and the Viable System Model (VSM). Fieldwork designs are proposed for the empirical development of an analytical framework and its use to assist study of the development of safety management in organisations.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
Increasingly, feminist linguistic research has adopted a discursive perspective to learn how women and men 'do' leadership in gendered ways. 'Women' as a social category is made relevant to this study by virtue of the lack of female senior leaders in UK businesses (Sealy and Vinnicombe, 2013). Much previous research has analysed leadership discourse in mixed gender groups, relying on theories that imply comparisons between men and women. Using an Interactional Sociolinguistic approach, this study aims to learn more about how women perform leadership in the absence of men by analysing the spoken interactions of a women-only team who were engaged in a competitive leadership task. The analysis reveals that the women accomplish leadership in multiple and complex ways that defy binary gendered classifications. Nonetheless, there is a distinctive gendered dynamic to the team's interactions which, it is argued, might be disadvantageous to women aspiring to senior positions. © The Author(s) 2013.
Resumo:
Conventional project management techniques are not always sufficient to ensure that schedule, cost and quality goals are met on large-scale construction projects. These jobs require complex planning, designing and implementation processes. The main reasons for a project's nonachievement in India's hydrocarbon processing industry are changes in scope and design, altered government policies and regulations, unforeseen inflation, under and/or improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed by applying risk management throughout the project life cycle.
Resumo:
Intranet technologies accessible through a web based platform are used to share and build knowledge bases in many industries. Previous research suggests that intranets are capable of providing a useful means to share, collaborate and transact information within an organization. To compete and survive successfully, business organisations are required to effectively manage various risks affecting their businesses. In the construction industry too this is increasingly becoming an important element in business planning. The ability of businesses, especially of SMEs which represent a significant portion in most economies, to manage various risks is often hindered by fragmented knowledge across a large number of businesses. As a solution, this paper argues that Intranet technologies can be used as an effective means of building and sharing knowledge and building up effective knowledge bases for risk management in SMEs, by specifically considering the risks of extreme weather events. The paper discusses and evaluates relevant literature in this regard and identifies the potential for further research to explore this concept.
Resumo:
Objectives: To develop a decision support system (DSS), myGRaCE, that integrates service user (SU) and practitioner expertise about mental health and associated risks of suicide, self-harm, harm to others, self-neglect, and vulnerability. The intention is to help SUs assess and manage their own mental health collaboratively with practitioners. Methods: An iterative process involving interviews, focus groups, and agile software development with 115 SUs, to elicit and implement myGRaCE requirements. Results: Findings highlight shared understanding of mental health risk between SUs and practitioners that can be integrated within a single model. However, important differences were revealed in SUs' preferred process of assessing risks and safety, which are reflected in the distinctive interface, navigation, tool functionality and language developed for myGRaCE. A challenge was how to provide flexible access without overwhelming and confusing users. Conclusion: The methods show that practitioner expertise can be reformulated in a format that simultaneously captures SU expertise, to provide a tool highly valued by SUs. A stepped process adds necessary structure to the assessment, each step with its own feedback and guidance. Practice Implications: The GRiST web-based DSS (www.egrist.org) links and integrates myGRaCE self-assessments with GRiST practitioner assessments for supporting collaborative and self-managed healthcare.
Resumo:
The availability of regular supply has been identified as one of the major stimulants for the growth and development of any nation and is thus important for the economic well-being of a nation. The problems of the Nigerian power sector stems from a lot of factors culminating in her slow developmental growth and inability to meet the power demands of her citizens regardless of the abundance of human and natural resources prevalent in the nation. The research therefore had the main aim of investigating the importance and contributions of risk management to the success of projects specific to the power sector. To achieve this aim it was pertinent to examine the efficacy of risk management process in practice and elucidate the various risks typically associated with projects (Construction, Contractual, Political, Financial, Design, Human resource and Environmental risk factors) in the power sector as well as determine the current situation of risk management practice in Nigeria. To address this factors inhibiting the proficiency of the overarching and prevailing issue which have only been subject to limited in-depth academic research, a rigorous mixed research method was adopted (quantitative and qualitative data analysis). A review of the Nigeria power sector was also carried out as a precursor to the data collection stage. Using purposive sampling technique, respondents were identified and a questionnaire survey was administered. The research hypotheses were tested using inferential statistics (Pearson correlation, Chi-square test, t-test and ANOVA technique) and the findings revealed the need for the development of a new risk management implementation Framework. The proposed Framework was tested within a company project, for interpreting the dynamism and essential benefits of risk management with the aim of improving the project performances (time), reducing the level of fragmentation (quality) and improving profitability (cost) within the Nigerian power sector in order to bridge a gap between theory and practice. It was concluded that Nigeria’s poor risk management practices have prevented it from experiencing strong growth and development. The study however, concludes that the successful implementation of the developed risk management framework may help it to attain this status by enabling it to become more prepared and flexible, to face challenges that previously led to project failures, and thus contributing to its prosperity. The research study provides an original contribution theoretically, methodologically and practically which adds to the project risk management body of knowledge and to the Nigerian power sector.