30 resultados para Projects Analysis
Resumo:
Exploratory analysis of data seeks to find common patterns to gain insights into the structure and distribution of the data. In geochemistry it is a valuable means to gain insights into the complicated processes making up a petroleum system. Typically linear visualisation methods like principal components analysis, linked plots, or brushing are used. These methods can not directly be employed when dealing with missing data and they struggle to capture global non-linear structures in the data, however they can do so locally. This thesis discusses a complementary approach based on a non-linear probabilistic model. The generative topographic mapping (GTM) enables the visualisation of the effects of very many variables on a single plot, which is able to incorporate more structure than a two dimensional principal components plot. The model can deal with uncertainty, missing data and allows for the exploration of the non-linear structure in the data. In this thesis a novel approach to initialise the GTM with arbitrary projections is developed. This makes it possible to combine GTM with algorithms like Isomap and fit complex non-linear structure like the Swiss-roll. Another novel extension is the incorporation of prior knowledge about the structure of the covariance matrix. This extension greatly enhances the modelling capabilities of the algorithm resulting in better fit to the data and better imputation capabilities for missing data. Additionally an extensive benchmark study of the missing data imputation capabilities of GTM is performed. Further a novel approach, based on missing data, will be introduced to benchmark the fit of probabilistic visualisation algorithms on unlabelled data. Finally the work is complemented by evaluating the algorithms on real-life datasets from geochemical projects.
Resumo:
This paper presents a study of engineering design groups that seeks to explain how knowing other participants can influence processes and outcomes in design projects. Research in this paper contributes a framework to approach understanding how interpersonal relationships influence group processes and outcomes. This acknowledges that engineering design is achieved through individuals working in groups. First a temporal perspective is introduced to understand how individuals (through interpersonal relationships), group processes and outcomes influence each other; secondly identity is presented as a theme to focus on how knowing other participants identity influences group processes and outcomes. Within this framework it is recognised that engineering design has different levels of complexity of which two aspects are considered: design type and design setting. These aspects place different demands on a project group and its members and this structure provides an opportunity for cross case analysis to generalise findings.
Resumo:
With few exceptions (e.g. Fincham & Clark, 2002; Lounsbury, 2002, 2007; Montgomery & Oliver, 2007), we know little about how emerging professions, such as management consulting, professionalize and establish their services as a taken-for-granted element of social life. This is surprising given that professionals have long been recognized as “institutional agents” (DiMaggio & Powell, 1983; Scott, 2008) (see Chapter 17) and professionalization projects have been closely associated with institutionalization (DiMaggio, 1991). Therefore, in this chapter we take a closer look at a specific type of entrepreneurship in PSFs; drawing on the concept of “institutional entrepreneurship” (DiMaggio, 1988; Garud, Hardy, & Maguire, 2007; Hardy & Maguire, 2008) we describe some generic strategies by which proto-professions can enhance their “institutional capital” (Oliver, 1997), that is, their capacity to extract institutionally contingent resources such as legitimacy, reputation, or client relationships from their environment.
Resumo:
This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.
Resumo:
Practitioners assess performance of entities in increasingly large and complicated datasets. If non-parametric models, such as Data Envelopment Analysis, were ever considered as simple push-button technologies, this is impossible when many variables are available or when data have to be compiled from several sources. This paper introduces by the 'COOPER-framework' a comprehensive model for carrying out non-parametric projects. The framework consists of six interrelated phases: Concepts and objectives, On structuring data, Operational models, Performance comparison model, Evaluation, and Result and deployment. Each of the phases describes some necessary steps a researcher should examine for a well defined and repeatable analysis. The COOPER-framework provides for the novice analyst guidance, structure and advice for a sound non-parametric analysis. The more experienced analyst benefits from a check list such that important issues are not forgotten. In addition, by the use of a standardized framework non-parametric assessments will be more reliable, more repeatable, more manageable, faster and less costly. © 2010 Elsevier B.V. All rights reserved.
Resumo:
Energy price is related to more than half of the total life cycle cost of asphalt pavements. Furthermore, the fluctuation related to price of energy has been much higher than the general inflation and interest rate. This makes the energy price inflation an important variable that should be addressed when performing life cycle cost (LCC) studies re- garding asphalt pavements. The present value of future costs is highly sensitive to the selected discount rate. Therefore, the choice of the discount rate is the most critical element in LCC analysis during the life time of a project. The objective of the paper is to present a discount rate for asphalt pavement projects as a function of interest rate, general inflation and energy price inflation. The discount rate is defined based on the portion of the energy related costs during the life time of the pavement. Consequently, it can reflect the financial risks related to the energy price in asphalt pavement projects. It is suggested that a discount rate sensitivity analysis for asphalt pavements in Sweden should range between –20 and 30%.
Resumo:
Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.
Resumo:
Post-disaster housing reconstruction projects face several challenges. Resources and material supplies are often scarce; several and different types of organizations are involved, while projects must be completed as quickly as possible to foster recovery. Within this context, the chapter aims to increase the understanding of relief supply chain design in reconstruction. In addition, the chapter is introducing a community based and beneficiary perspective to relief supply chains by evaluating the implications of local components for supply chain design in reconstruction. This is achieved through the means of secondary data analysis based on the evaluation reports of two major housing reconstruction projects that took place in Europe the last decade. A comparative analysis of the organizational designs of these projects highlights the ways in which users can be involved. The performance of reconstruction supply chains seems to depend to a large extent on the way beneficiaries are integrated in supply chain design impacting positively on the effectiveness of reconstruction supply chains.
Resumo:
We present a data based statistical study on the effects of seasonal variations in the growth rates of the gastro-intestinal (GI) parasitic infection in livestock. The alluded growth rate is estimated through the variation in the number of eggs per gram (EPG) of faeces in animals. In accordance with earlier studies, our analysis too shows that rainfall is the dominant variable in determining EPG infection rates compared to other macro-parameters like temperature and humidity. Our statistical analysis clearly indicates an oscillatory dependence of EPG levels on rainfall fluctuations. Monsoon recorded the highest infection with a comparative increase of at least 2.5 times compared to the next most infected period (summer). A least square fit of the EPG versus rainfall data indicates an approach towards a super diffusive (i. e. root mean square displacement growing faster than the square root of the elapsed time as obtained for simple diffusion) infection growth pattern regime for low rainfall regimes (technically defined as zeroth level dependence) that gets remarkably augmented for large rainfall zones. Our analysis further indicates that for low fluctuations in temperature (true on the bulk data), EPG level saturates beyond a critical value of the rainfall, a threshold that is expected to indicate the onset of the nonlinear regime. The probability density functions (PDFs) of the EPG data show oscillatory behavior in the large rainfall regime (greater than 500 mm), the frequency of oscillation, once again, being determined by the ambient wetness (rainfall, and humidity). Data recorded over three pilot projects spanning three measures of rainfall and humidity bear testimony to the universality of this statistical argument. © 2013 Chattopadhyay and Bandyopadhyay.
Resumo:
bCHP (Biomass combined heat and power) systems are highly efficient at smaller-scales when a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost fossil fuel incumbent. The paper reviews the barriers to small-scale bCHP project development in the UK along with a case study of a failed 1.5MWel bCHP scheme. The paper offers possible explanations for the project's failure and suggests adaptations to improve the project resilience. Analysis of the project's: capital structuring contract length and bankability; feedstock type and price uncertainty, and plant oversizing highlight the negative impact of the existing project barriers on project development. The research paper concludes with a discussion on the effects of these barriers on the case study project and this industry more generally. A greater understanding of the techno-economic effects of some barriers for small-scale bCHP schemes is demonstrated within this paper, along with some methods for improving the attractiveness and resilience of projects of this kind. © 2014 Elsevier Ltd.
Resumo:
Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.
Resumo:
Different procurement decisions taken by relief organizations can result in considerably different implications in regards to transport, storage, and distribution of humanitarian aid and ultimately can influence the performance of the humanitarian supply chain and the delivery of the humanitarian aid. In this article, we look into what resources are needed and how these resources evolve in the delivery of humanitarian aid. Drawing on the resource-based view of the firm, we develop a framework to categorize the impact of local resources on the configuration of humanitarian supply chains. In contrast to other papers, the importance of localizing the configuration of the humanitarian supply chain is not only conceptually recognized, but empirical investigations are also provided. In terms of methodology, this article is based on the analysis of secondary data from two housing reconstruction projects. Findings indicate that the use of local resources in humanitarian aid has positive effects on programs' overall supply chain performance and these effects are not only related to the macroeconomic perspective, but benefits expand to improvements related to the use of knowledge. At the same time, it was found that local sourcing often comes with a number of problems. For example, in one of the cases, significant problems existed, which were related to the scarcity of local supplies. Both housing reconstruction projects have indicated the continuous need for changes throughout the programs as a dynamic supply chain configuration is important for the long-term sustainability of reconstruction aid. © 2014 Decision Sciences Institute.
Resumo:
The coordination of effort within and among different expert groups is a central feature of contemporary organizations. Within the existing literature, however, a dichotomy has emerged in our understanding of the role played by codification in coordinating expert groups. One strand of literature emphasizes codification as a process that supports coordination by enabling the storage and ready transfer of knowledge. In contrast, another strand highlights the persistent differences between expert groups that create boundaries to the transfer of knowledge, seeing coordination as dependent on the quality of the reciprocal interactions between groups and individuals. Our research helps to resolve such contested understandings of the coordinative role played by codification. By focusing on the offshore-outsourcing of knowledge-intensive services, we examine the role played by codification when expertise was coordinated between client staff and onsite and offshore vendor personnel in a large-scale outsourcing contract between TATA Consultancy Services (TCS) and ABN AMRO bank. A number of theoretical contributions flow from our analysis of the case study, helping to move our understanding beyond the dichotomized views of codification outlined above. First, our study adds to previous work where codification has been seen as a static concept by demonstrating the multiple, coexisting, and complementary roles that codification may play. We examine the dynamic nature of codification and show changes in the relative importance of these different roles in coordinating distributed expertise over time. Second, we reconceptualize the commonly accepted view of codification as focusing on the replication and diffusion of knowledge by developing the notion of the codification of the “knower” as complementary to the codification of knowledge. Unlike previous studies of expertise directories, codification of the knower does not involve representing expertise in terms of occupational skills or competences but enables the reciprocal interrelating of expertise required by more unstructured tasks.
Resumo:
Purpose – The purpose of this paper is to develop an integrated patient-focused analytical framework to improve quality of care in accident and emergency (A&E) unit of a Maltese hospital. Design/methodology/approach – The study adopts a case study approach. First, a thorough literature review has been undertaken to study the various methods of healthcare quality management. Second, a healthcare quality management framework is developed using combined quality function deployment (QFD) and logical framework approach (LFA). Third, the proposed framework is applied to a Maltese hospital to demonstrate its effectiveness. The proposed framework has six steps, commencing with identifying patients’ requirements and concluding with implementing improvement projects. All the steps have been undertaken with the involvement of the concerned stakeholders in the A&E unit of the hospital. Findings – The major and related problems being faced by the hospital under study were overcrowding at A&E and shortage of beds, respectively. The combined framework ensures better A&E services and patient flow. QFD identifies and analyses the issues and challenges of A&E and LFA helps develop project plans for healthcare quality improvement. The important outcomes of implementing the proposed quality improvement programme are fewer hospital admissions, faster patient flow, expert triage and shorter waiting times at the A&E unit. Increased emergency consultant cover and faster first significant medical encounter were required to start addressing the problems effectively. Overall, the combined QFD and LFA method is effective to address quality of care in A&E unit. Practical/implications – The proposed framework can be easily integrated within any healthcare unit, as well as within entire healthcare systems, due to its flexible and user-friendly approach. It could be part of Six Sigma and other quality initiatives. Originality/value – Although QFD has been extensively deployed in healthcare setup to improve quality of care, very little has been researched on combining QFD and LFA in order to identify issues, prioritise them, derive improvement measures and implement improvement projects. Additionally, there is no research on QFD application in A&E. This paper bridges these gaps. Moreover, very little has been written on the Maltese health care system. Therefore, this study contributes demonstration of quality of emergency care in Malta.
Resumo:
Purpose: The purpose of this paper is to present the application of logical framework analysis (LFA) for implementing continuous quality improvement (CQI) across multiple settings in a tertiary care hospital. Design/methodology/approach: This study adopts a multiple case study approach. LFA is implemented within three diverse settings, namely, intensive care unit, surgical ward, and acute in-patient psychiatric ward. First, problem trees are developed in order to determine the root causes of quality issues, specific to the three settings. Second, objective trees are formed suggesting solutions to the quality issues. Third, project plan template using logical framework (LOGFRAME) is created for each setting. Findings: This study shows substantial improvement in quality across the three settings. LFA proved to be effective to analyse quality issues and suggest improvement measures objectively. Research limitations/implications: This paper applies LFA in specific, albeit, diverse settings in one hospital. For validation purposes, it would be ideal to analyse in other settings within the same hospital, as well as in several hospitals. It also adopts a bottom-up approach when this can be triangulated with other sources of data. Practical implications: LFA enables top management to obtain an integrated view of performance. It also provides a basis for further quantitative research on quality management through the identification of key performance indicators and facilitates the development of a business case for improvement. Originality/value: LFA is a novel approach for the implementation of CQI programs. Although LFA has been used extensively for project development to source funds from development banks, its application in quality improvement within healthcare projects is scant.