38 resultados para Project management Computer programs


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Completing projects faster than normal is always a challenge as it often demands many paradigm shifts. Globalization opportunities and competition from private sectors and multinationals are forcing the management of public sector organizations in India's petroleum industry to take various aggressive strategies to maintain profitability. These projects are required to be completed sooner than with a typical schedule to remain competitive, get faster return on investment and give longer project life.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Currently, there are many instances where public sector organizations and government entities collapse and are unable to provide the required services to the public. Such organizations do not have effective mechanisms of control or any specific department which manages projects occurring in the organization. However, this study suggests the incorporation of the Project Management Office (PMO) in public sector organizations for the purpose of managing project management. There are other relevant roles of the PMO discussed in this study. The study is contextualized with respect to Corporate Governance, Risk Management, and Compliance (GRC) and the study shows how PMO can benefit or compliment GRC and provide overall better standards of practice for public sector organizations. The study uses a mixed methodology for data collection and the findings contribute to the body of knowledge regarding PMO's and GRC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project-based firms currently follow an organizational structure whereby all projects are dealt with using a functionalist perspective which is integrated with projects so as to support a project-based structure. Project-based firms are increasingly moving towards the realization that innovation management is an integral part of any organizational strategy and the same is true for project-based firms. Moreover, the current body of knowledge regarding project-based firms does not incorporate any findings regarding the integration or use of innovation management in project management. As a result, it becomes important to research organizations to see how innovation management is applied in organizations and what the perspective is regarding innovation in organizations. Secondly, the question of whether slack resources can contribute to higher levels of innovation must also be researched. It has been a longstanding viewpoint that a lack of resources or limited resources results in higher levels of innovation. This study analyzes these two main viewpoints using qualitative analysis of 12 firms. The findings add to the current literature on innovation in organizations and project based firms while expanding the knowledge on innovation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects are risky. However, the characteristics of the risk highly depend on the type of procurement being adopted for managing the project. A build-operate-transfer (BOT) project is recognized as one of the most risky project schemes. There are instances of project failure where a BOT scheme was employed. Ineffective rts are increasingly being managed using various risk management tools and techniques. However, application of those tools depends on the nature of the project, organization's policy, project management strategy, risk attitude of the project team members, and availability of the resources. Understanding of the contents and contexts of BOT projects, together with a thorough understanding of risk management tools and techniques, helps select processes of risk management for effective project implementation in a BOT scheme. This paper studies application of risk management tools and techniques in BOT projects through reviews of relevant literatures and develops a model for selecting risk management process for BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants. Discussion is also made with regard to political risks. This study would contribute to the establishment of a framework for systematic risk management in BOT projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study demonstrates a quantitative approach to construction risk management through analytic hierarchy process and decision tree analysis. All the risk factors are identified, their effects are quantified by determining probability and severity, and various alternative responses are generated with cost implication for mitigating the quantified risks. The expected monetary values are then derived for each alternative in a decision tree framework and subsequent probability analysis aids the decision process in managing risks. The entire methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient for ensuring time, cost and quality achievement of large-scale construction projects due to complexity in planning and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation) under-estimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk numagement throughout project life cycle. However, the effectiveness of risk management depends on the technique in which the effects of risk factors are analysed and! or quantified. This study proposes Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique as a tool for risk analysis because it can handle subjective as well as objective factors in decision model that are conflicting in nature. This provides a decision support system (DSS) to project managenumt for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and competitive business environment. The whole methodology is explained through a case study of a cross-country petroleum pipeline project in India and its effectiveness in project1nana.gement is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to develop an integrated quality management model, which identifies problems, suggests solutions, develops a framework for implementation and helps evaluate performance of health care services dynamically. Design/methodology/approach - This paper uses logical framework analysis (LFA), a matrix approach to project planning for managing quality. This has been applied to three acute healthcare services (Operating room utilization, Accident and emergency, and Intensive care) in order to demonstrate its effectiveness. Findings - The paper finds that LFA is an effective method of quality management of hospital-based healthcare services. Research limitations/implications - This paper shows LFA application in three service processes in one hospital. However, ideally this is required to be tested in several hospitals and other services as well. Practical implications - In the paper the proposed model can be practised in hospital-based healthcare services for improving performance. Originality/value - The paper shows that quality improvement in healthcare services is a complex and multi-dimensional task. Although various quality management tools are routinely deployed for identifying quality issues in health care delivery and corrective measures are taken for superior performance, there is an absence of an integrated approach, which can identify and analyze issues, provide solutions to resolve those issues, develop a project management framework (planning, monitoring, and evaluating) to implement those solutions in order to improve process performance. This study introduces an integrated and uniform quality management tool. It integrates operations with organizational strategies. © Emerald Group Publishing Limited.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Healthcare services available these days deploy high technology to satisfy both internal and external customers by continuously improving various quality parameters. Quality improvement in healthcare services is a complex and multidimensional task. Although various quality management tools are routinely deployed for identifying quality issues in healthcare delivery, there is absence of an integrated approach, which can identify and analyse issues, provide solutions to resolve those issues and develop a project management framework to implement and evaluate those solutions. This study introduces an integrated and uniform quality management framework for healthcare services. This study uses the Logical Framework Analysis (LFA) to improve the performance of healthcare services. LFA has three major steps - problem identification, solution derivation and formation of a planning matrix for implementation and evaluation. LFA has been applied in a case study environment to three acute healthcare services (Operating Room (OR) utilisation, Accident and Emergency (A&E) and intensive care) in order to demonstrate its effectiveness. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the last few years, there has been considerable interest in using saturated magnetic objective lenses in high resolution electron microscopes. Such lenses, in present commercial electron microscopes, are energized either by conventional or superconducting coils. Very little work, however, has been reported on the use of conventional coils in saturated magnetic electron lenses. The present investigation has been concerned with the design of high flux density saturated objective lenses of both single and double polepiece types which may be energized by conventional coils and in some cases by superconducting coils. Such coils have the advantage of being small and capable of carrying high current densities. The present work has been carried out with the aid of several computer programs based on the finite element method. The effect of the shape and position of the energizing coil on the electron optical parameter has been investigated. Electron optical properties such as chromatic and spherical aberration have been studies in detail for saturated single and double polepiece lenses. Several high flux density coils of different shapes have been investigated. The choice of the most favourable coil shape and position subject to the operational requirements, has been studied in some detail. The focal properties of such optimised lenses have been computed and compared.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Advances in both computer technology and the necessary mathematical models capable of capturing the geometry of arbitarily shaped objects has led to the development in this thesis of a surface generation package called 'IBSCURF' aimed at providing a more economically viable solution to free-form surface manufacture. A suit of computer programs written in FORTRAN 77 has been developed to provide computer aids for every aspect of work in designing and machining free-form surfaces. A vector-valued parametric method was used for shape description and a lofting technique employed for the construction of the surface. The development of the package 'IBSCURF' consists of two phases. The first deals with CAD. The design process commences in defining the cross-sections which are represented by uniform B-spline curves as approximations to give polygons. The order of the curve and the position and number of the polygon vertices can be used as parameters for the modification to achieve the required curves. When the definitions of the sectional curves is complete, the surface is interpolated over them by cubic cardinal splines. To use the CAD function of the package to design a mould for a plastic handle, a mathematical model was developed. To facilitate the integration of design and machining using the mathematical representation of the surface, the second phase of the package is concerned with CAM which enables the generation of tool offset positions for ball-nosed cutters and a general post-processor has been developed which automatically generates NC tape programs for any CNC milling machine. The two phases of these programs have been successfully implemented, as a CAD/CAM package for free-form surfaces on the VAX 11/750 super-minicomputer with graphics facilities for displaying drawings interactively on the terminal screen. The development of this package has been beneficial in all aspects of design and machining of free form surfaces.