42 resultados para Project management - Information technology
Resumo:
The need for an adequate information system for the Highways Departments in the United Kingdom has been recognised by the report of a committee presented to the Minister of Transport in 1970, (The Marshall Report). This research aims to present a comprehensive information system on a sound theoretical basis which should enable the different levels of management to execute their work adequately. The suggested system presented in this research covers the different functions of the Highways Department, and presents a suggested solution for problems which may occur during the planning and controlling of work in the different locations of the Highways Department. The information system consists of:- 1. A coding system covering the cost units, cost centres and cost elements. 2. Cost accounting records for the cost units and cost centres. 3. A budgeting and budgetary control system covering, the different planning methods and procedures which are required for preparing the capital expenditure budget, the improvement and maintenance operation flexible budgets and programme of work, the plant budget, the administration budget, and the purchasing budget. 4. A reporting system which ensures that the different levels of management are receiving relevant and timely information. 5. The flow of documents which covers the relationship between the prime documents, the cost accounting records, budgets, reports and their relation to the different sections and offices within the department. A comprehensive cost units, cost centres, and cost elements codes together with a number of examples demonstrating the results of the survey, and examples of the application and procedures of the suggested information system have been illustrated separately as appendices. The emphasis is on the information required for internal control by management personnel within the County Council.
Resumo:
Eight steps for projectizing continuous improvement to deliver desired change
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
Purpose – The purpose of the paper was to conduct an empirical investigation to explore the impact of project management maturity models (PMMMs) on improving project performance. Design/methodology/approach – The investigation used a cross-case analysis involving over 90 individuals in seven organisations. Findings – The findings of the empirical investigation indicate that PMMMs demonstrate very high levels of variability in individual's assessment of project management maturity. Furthermore, at higher levels of maturity, the type of performance improvement adopted following their application is related to the type of PMMM used in the assessment. The paradox of the unreliability of PMMMs and their widespread acceptance is resolved by calling upon the “wisdom of crowds” phenomenon which has implications for the use of maturity model assessments in other arena. Research limitations/implications – The investigation does have the usual issues associated with case research, but the steps that have been taken in the cross-case construction and analysis have improved the overall robustness and extendibility of the findings. Practical implications – The tendency for PMMMs to shape improvements based on their own inherent structure needs further understanding. Originality/value – The use of empirical methods to investigate the link between project maturity models and extant changes in project management performance is highly novel and the findings that result from this have added resonance.
Resumo:
Completing projects faster than normal is always a challenge as it often demands many paradigm shifts. Globalization opportunities and competition from private sectors and multinationals are forcing the management of public sector organizations in India's petroleum industry to take various aggressive strategies to maintain profitability. These projects are required to be completed sooner than with a typical schedule to remain competitive, get faster return on investment and give longer project life.
Resumo:
This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.
Resumo:
Currently, there are many instances where public sector organizations and government entities collapse and are unable to provide the required services to the public. Such organizations do not have effective mechanisms of control or any specific department which manages projects occurring in the organization. However, this study suggests the incorporation of the Project Management Office (PMO) in public sector organizations for the purpose of managing project management. There are other relevant roles of the PMO discussed in this study. The study is contextualized with respect to Corporate Governance, Risk Management, and Compliance (GRC) and the study shows how PMO can benefit or compliment GRC and provide overall better standards of practice for public sector organizations. The study uses a mixed methodology for data collection and the findings contribute to the body of knowledge regarding PMO's and GRC.