27 resultados para Management of enterprise development
Resumo:
This thesis is about the acquisition and diffusion of imported technology. Writers in the field of technology development in developing countries have always recognised that technical progress depends on the diffusion of imported technology and its applications to the provision of products and processes (Rosemberg, 1982). Despite the massive importation of technology by Malaysian companies, little effort has been made to study and understand the diffusion system in local companies. This study analyses: The problems associated with the acquisition of technology, highlighting the technology strategies adopted by the suppliers of technology; the diffusion pattern and key characteristics of the diffusion process; and major factors affecting the diffusion of technology. The policy implications are examined and the framework to manage the diffusion process within the enterprises is suggested. The findings indicated that the diffusion process is not one of passive acceptance but involves systematic efforts to acquire and diffuse the imported technology. A strong system of diffusion in companies had enabled a rapid diffusion of imported technology resulting in higher levels of technical capability. On the other hand, weakness in the company's diffusion system led to limited diffusion and slow technical progress. Characteristics of diffusion system are analysed and discussed extensively. The thesis attempts to develop the idea of `in-house system of diffusion' associated with the acquisition and development of imported technology. It argues for the development ofa stronger theoretical framework on the diffusion and development of technology particularly in countries like Malaysia which relies extensively on the importation of foreign technology.
Resumo:
Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.
Resumo:
The project set out with two main aims. The first aim was to determine whether large scale multispectral aerial photography could be used to successfully survey and monitor urban wildlife habitats. The second objective was to investigate whether this data source could be used to predict population numbers of selected species expected to be found in a particular habitat type. Panchromatic, colour and colour infra-red, 1:2500 scale aerial photographs, taken in 1981 and 1984, were used. For the orderly extraction of information from the imagery, an urban wildlife habitat classification was devised. This was based on classifications already in use in urban environments by the Nature Conservancy Council. Pilot tests identified that the colour infra-red imagery provided the most accurate results about urban wildlife habitats in the study area of the Blackbrook Valley, Dudley. Both the 1981 and 1984 colour infra-red photographs were analysed and information was obtained about the type, extent and distribution of habitats. In order to investigate whether large scale aerial photographs could be used to predict likely animal population numbers in urban environments, it was decided to limit the investigation to the possible prediction of bird population numbers in Saltwells Local Nature Reserve. A good deal of research has already been completed into the development of models to predict breeding bird population numbers in woodland habitats. These models were analysed to determine whether they could be used successfully with data extracted from the aerial photographs. The projects concluded that 1:2500 scale colour infra-red photographs can provide very useful and very detailed information about the wildlife habitats in an urban area. Such imagery can also provide habitat area data to be used with population predictive models of woodland breeding birds. Using the aerial photographs, further investigations into the relationship between area of habitat and the breeding of individual bird species were inconclusive and need further research.
Resumo:
Enterprise resource planning (ERP) projects are risky. But if they are implemented appropriately, they can provide competitive advantage to organisations. Therefore, ERP implementation has become one of the most critical aspects of today's information management research. The main purpose of this article is to describe a new ERP risk assessment framework (RAF) that can be used to increase the success of ERP implementation. In this article, through a case study based in a leading UK-based energy service provider, we demonstrate the new RAF, which has been shown to help identify and mitigate risks in ERP implementation. In contrast to other research, this RAF identifies risks hierarchically in external engagement, programme management, work stream and work package levels across technical, schedule, operational, business and organisational categories. This not only helped to develop responses to mitigate risks but also facilitates on-going risk control.
Resumo:
Over recent years, hub-and-spoke distribution techniques have attracted widespread research attention. Despite there being a growing body of literature in this area there is less focus on the spoke-terminal element of the hub-and-spoke system as being a key component in the overall service received by the end-user. Current literature is highly geared towards discussing bulk optimization of freight units rather than to the more discrete and individualistic profile characteristics of shared-user Less-than-truckload (LTL) freight. In this paper, a literature review is presented to review the role hub-and-spoke systems play in meeting multi-profile customer demands, particularly in developing sectors with more sophisticated needs, such as retail. The paper also looks at the use of simulation technology as a suitable tool for analyzing spoke-terminal operations within developing hub-and spoke systems.
Resumo:
Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.
Resumo:
This paper starts from the viewpoint that enterprise risk management is a specific application of knowledge in order to control deviations from strategic objectives, shareholders’ values and stakeholders’ relationships. This study is looking for insights into how the application of knowledge management processes can improve the implementation of enterprise risk management. This article presents the preliminary results of a survey on this topic carried out in the financial services sector, extending a previous pilot study that was in retail banking only. Five hypotheses about the relationship of knowledge management variables to the perceived value of ERM implementation were considered. The survey results show that the two people-related variables, perceived quality of communication among groups and perceived quality of knowledge sharing were positively associated with the perceived value of ERM implementation. However, the results did not support a positive association for the three variables more related to technology, namely network capacity for connecting people (which was marginally significant), risk management information system functionality and perceived integration of the information systems. Perceived quality of communication among groups appeared to be clearly the most significant of these five factors in affecting the perceived value of ERM implementation.
Resumo:
This paper builds on a Strategic Activity Framework (Jarzabkowski, 2005) and activity based theories of development (Vygotsky, 1978) to model how Enterprise Systems are used to support emerging strategy. It makes three contributions. Firstly, it links fluidity and extensiveness of system use to patterns of strategising. Fluidity - the ability to change system use as needs change - is supported by interactive strategising, where top managers communicate directly with the organisation. Extensiveness requires procedural strategising, embedding system use in structures and routines. Secondly, it relates interactive and procedural strategising to the importance of the system - procedural strategising is more likely to occur if the system is strategically important. Thirdly, using a scaffolding metaphor it identifies patterns in the activities of top managers and Enterprise System custodians, who identify process champions within the organisational community, orient them towards system goals, provide guided support, and encourage fluidity through pacing implementation with learning.© 2013 Published by Elsevier B.V. All rights reserved.
Resumo:
The progression of cardiovascular disease (CVD) is largely modifiable through lifestyle behaviours. UK pharmacists are contractually obliged to facilitate patient self-management of chronic conditions such as CVD. Pharmacists are easily accessible health professionals who are well placed to identify “at risk” patients through medication regimes. Research has identified varying attitudes towards and levels of involvement in pharmacist-led health promotion activity. Given the diverse and exploratory nature of the work, a pragmatic, mixed methods approach was used to explore community pharmacists’ role in facilitating patient self-management of CVD. The thesis presents four studies: a qualitative study with pharmacists; a cross sectional questionnaire of community pharmacists; a systematic review and a qualitative study with patients with CVD. The qualitative study with pharmacists gave an insight into pharmacists’ experiences of giving patients with CVD lifestyle advice and the factors underpinning commonly cited barriers to providing public health services. This informed the development of the cross-sectional questionnaire which identified the predictors of pharmacists’ intentions to give two different types of advice to facilitate patient self-management. The systematic review identified a small number of interventions to prepare pharmacists to facilitate patient lifestyle behaviour change and evaluated the theories and behaviour change techniques used in successful interventions; however due to poor study quality and poor reporting of the interventions limited conclusions about the efficacy of the interventions could reliably be drawn. Finally, the qualitative study gave an insight into the experiences of patients with CVD using community pharmacy services and their expectations of the service they receive from community pharmacists. Recommendations about changes to pharmacy policy and practice in order to support pharmacists’ provision of CVD self-management advice are made.
Resumo:
Acute posterior vitreous detachment (PVD) is the most common cause of retinal detachment. The management of this condition can be variable and often undue reliance is placed upon associated signs and symptoms which can be a poor indicator of pathology. Optometrists undertake a number of extended roles, however involvement in vitreo-retinal sub-specialities appears to be limited. One objective was to directly compare an optometrist and ophthalmologist in the assessment of patients with PVD, for this a high level of agreement was found (95% sensitivity, 99% specificity, 0.94 kappa). A review of 1107 patients diagnosed with acute PVD that were re-evaluated in a PVD clinic a few weeks later was undertaken to determine whether such reviews are necessary. One-fifth of patients were found to have conditions undiagnosed at the initial assessment, overall 4% of patients had retinal breaks when examined in the PVD clinic and a total of 7% required further intervention. The sensitivity of fundus examination with +90D and 3-mirror lenses was 85-88% for detecting retinal breaks and 7-85% for pigment in the anterior vitreous for the presence of retinal breaks. Therefore patients with acute PVD should be examined by indirect ophthalmoscopy with indentation at the onset of PVD and 4-6 weeks later. The treatment of retinal breaks with laser retinopexy is performed by ophthalmologists with a primary success rate 54-85%. In a pioneering development, an optometrist undertaking this role achieved a comparable primary success rate (79%). Mid-vitreous opacities associated with PVD are described, and noted in 100% of eyes with PVD. The recognition of this sign is important in the diagnosis of PVD and retinal breaks. The importance of diagnostic imaging is also demonstrated, however the timing in relation to onset may be vital.
Resumo:
The fibroblast growth factor (FGF) family consists of 22 evolutionarily and structurally related proteins (FGF1 to FGF23; with FGF15 being the rodent ortholog of human FGF19). Based on their mechanism of action, FGFs can be categorized into intracrine, autocrine/paracrine and endocrine subgroups. Both autocrine/paracrine and endocrine FGFs are secreted from their cells of origin and exert their effects on target cells by binding to and activating specific single-pass transmembrane tyrosine kinase receptors (FGFRs). Moreover, FGF binding to FGFRs requires specific cofactors, namely heparin/heparan sulfate proteoglycans or Klothos for autocrine/paracrine and endocrine FGF signaling, respectively. FGFs are vital for embryonic development and mediate a broad spectrum of biological functions, ranging from cellular excitability to angiogenesis and tissue regeneration. Over the past decade certain FGFs (e.g. FGF1, FGF10, FGF15/FGF19 and FGF21) have been further recognized as regulators of energy homeostasis, metabolism and adipogenesis, constituting novel therapeutic targets for obesity and obesity-related cardiometabolic disease. Until recently, translational research has been mainly focused on FGF21, due to the pleiotropic, beneficial metabolic actions and the relatively benign safety profile of its engineered variants. However, increasing evidence regarding the role of additional FGFs in the regulation of metabolic homeostasis and recent developments regarding novel, engineered FGF variants have revitalized the research interest into the therapeutic potential of certain additional FGFs (e.g. FGF1 and FGF15/FGF19). This review presents a brief overview of the FGF family, describing the mode of action of the different FGFs subgroups, and focuses on FGF1 and FGF15/FGF19, which appear to also represent promising new targets for the treatment of obesity and type 2 diabetes.