31 resultados para Management - simulation methods
Resumo:
With the features of low-power and flexible networking capabilities IEEE 802.15.4 has been widely regarded as one strong candidate of communication technologies for wireless sensor networks (WSNs). It is expected that with an increasing number of deployments of 802.15.4 based WSNs, multiple WSNs could coexist with full or partial overlap in residential or enterprise areas. As WSNs are usually deployed without coordination, the communication could meet significant degradation with the 802.15.4 channel access scheme, which has a large impact on system performance. In this thesis we are motivated to investigate the effectiveness of 802.15.4 networks supporting WSN applications with various environments, especially when hidden terminals are presented due to the uncoordinated coexistence problem. Both analytical models and system level simulators are developed to analyse the performance of the random access scheme specified by IEEE 802.15.4 medium access control (MAC) standard for several network scenarios. The first part of the thesis investigates the effectiveness of single 802.15.4 network supporting WSN applications. A Markov chain based analytic model is applied to model the MAC behaviour of IEEE 802.15.4 standard and a discrete event simulator is also developed to analyse the performance and verify the proposed analytical model. It is observed that 802.15.4 networks could sufficiently support most WSN applications with its various functionalities. After the investigation of single network, the uncoordinated coexistence problem of multiple 802.15.4 networks deployed with communication range fully or partially overlapped are investigated in the next part of the thesis. Both nonsleep and sleep modes are investigated with different channel conditions by analytic and simulation methods to obtain the comprehensive performance evaluation. It is found that the uncoordinated coexistence problem can significantly degrade the performance of 802.15.4 networks, which is unlikely to satisfy the QoS requirements for many WSN applications. The proposed analytic model is validated by simulations which could be used to obtain the optimal parameter setting before WSNs deployments to eliminate the interference risks.
Resumo:
The advent of global competition has introduced the need for new competitive manufacturing strategies. The implementation of new strategies has a dramatic effect on measuring product cost compared to traditional management accounting methods. It is found that new cost management methods are required to measure success and support decision-making within the new strategies. One example is the consequences of using traditional management accounting methods for measuring the effects of lean having catastrophic results during reporting. Such results steer managers away from lean manufacture based upon a false picture of the potential benefits. This research examines cost management methods potentially applicable within the automotive supplier sector. Because of the lack of cost-related data collected within the supplier sector companies, this paper ends with a demonstration of a novel method for use in data scarce environments. Copyright © 2008 Inderscience Enterprises Ltd.
Resumo:
SPOT simulation imagery was acquired for a test site in the Forest of Dean in Gloucestershire, U.K. This data was qualitatively and quantitatively evaluated for its potential application in forest resource mapping and management. A variety of techniques are described for enhancing the image with the aim of providing species level discrimination within the forest. Visual interpretation of the imagery was more successful than automated classification. The heterogeneity within the forest classes, and in particular between the forest and urban class, resulted in poor discrimination using traditional `per-pixel' automated methods of classification. Different means of assessing classification accuracy are proposed. Two techniques for measuring textural variation were investigated in an attempt to improve classification accuracy. The first of these, a sequential segmentation method, was found to be beneficial. The second, a parallel segmentation method, resulted in little improvement though this may be related to a combination of resolution in size of the texture extraction area. The effect on classification accuracy of combining the SPOT simulation imagery with other data types is investigated. A grid cell encoding technique was selected as most appropriate for storing digitised topographic (elevation, slope) and ground truth data. Topographic data were shown to improve species-level classification, though with sixteen classes overall accuracies were consistently below 50%. Neither sub-division into age groups or the incorporation of principal components and a band ratio significantly improved classification accuracy. It is concluded that SPOT imagery will not permit species level classification within forested areas as diverse as the Forest of Dean. The imagery will be most useful as part of a multi-stage sampling scheme. The use of texture analysis is highly recommended for extracting maximum information content from the data. Incorporation of the imagery into a GIS will both aid discrimination and provide a useful management tool.
Resumo:
Suggests that simulation of the workflow component of a computer supported co-operative work (CSCW) system has the potential to reduce the costs of system implementation, while at the same time improving the quality of the delivered system. Demonstrates the value of being able to assess the frequency and volume of workflow transactions using a case study of CSCW software developed for estate agency co-workers in which a model was produced based on a discrete-event simulation approach with implementation on a spreadsheet platform.
Resumo:
Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.
Resumo:
This study analyzes the validity of different Q-factor models in the BER estimation in RZ-DPSK transmission at 40 Gb/s channel rate. The impact of the duty cycle of the carrier pulses on the accuracy of the BER estimates through the different models has also been studied.
Resumo:
Applying direct error counting, we compare the accuracy and evaluate the validity of different available numerical approaches to the estimation of the bit-error rate (BER) in 40-Gb/s return-to-zero differential phase-shift-keying transmission. As a particular example, we consider a system with in-line semiconductor optical amplifiers. We demonstrate that none of the existing models has an absolute superiority over the others. We also reveal the impact of the duty cycle on the accuracy of the BER estimates through the differently introduced Q-factors.
Resumo:
A simulation model has been constructed of a valve manufacturing plant with the aim of assessing capacity requirements in response to a forecast increase in demand. The plant provides a weekly cycle of valves of varying types, based on a yearly production plan. Production control is provided by a just-in-time type system to minimise inventory. The simulation model investigates the effect on production lead time of a range of valve sequences into the plant. The study required the collection of information from a variety of sources, and a model that reflected the true capabilities of the production system. The simulation results convinced management that substantial changes were needed in order to meet demand. The case highlights the use of simulation in enabling a manager to quantify operational scenarios and thus provide a rational basis on which to take decisions on meeting performance criteria.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
This study analyzes the validity of different Q-factor models in the BER estimation in RZ-DPSK transmission at 40 Gb/s channel rate. The impact of the duty cycle of the carrier pulses on the accuracy of the BER estimates through the different models has also been studied.
Resumo:
Applying direct error counting, we compare the accuracy and evaluate the validity of different available numerical approaches to the estimation of the bit-error rate (BER) in 40-Gb/s return-to-zero differential phase-shift-keying transmission. As a particular example, we consider a system with in-line semiconductor optical amplifiers. We demonstrate that none of the existing models has an absolute superiority over the others. We also reveal the impact of the duty cycle on the accuracy of the BER estimates through the differently introduced Q-factors. © 2007 IEEE.