49 resultados para Discrete time control systems


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research is concerned with the development of distributed real-time systems, in which software is used for the control of concurrent physical processes. These distributed control systems are required to periodically coordinate the operation of several autonomous physical processes, with the property of an atomic action. The implementation of this coordination must be fault-tolerant if the integrity of the system is to be maintained in the presence of processor or communication failures. Commit protocols have been widely used to provide this type of atomicity and ensure consistency in distributed computer systems. The objective of this research is the development of a class of robust commit protocols, applicable to the coordination of distributed real-time control systems. Extended forms of the standard two phase commit protocol, that provides fault-tolerant and real-time behaviour, were developed. Petri nets are used for the design of the distributed controllers, and to embed the commit protocol models within these controller designs. This composition of controller and protocol model allows the analysis of the complete system in a unified manner. A common problem for Petri net based techniques is that of state space explosion, a modular approach to both the design and analysis would help cope with this problem. Although extensions to Petri nets that allow module construction exist, generally the modularisation is restricted to the specification, and analysis must be performed on the (flat) detailed net. The Petri net designs for the type of distributed systems considered in this research are both large and complex. The top down, bottom up and hybrid synthesis techniques that are used to model large systems in Petri nets are considered. A hybrid approach to Petri net design for a restricted class of communicating processes is developed. Designs produced using this hybrid approach are modular and allow re-use of verified modules. In order to use this form of modular analysis, it is necessary to project an equivalent but reduced behaviour on the modules used. These projections conceal events local to modules that are not essential for the purpose of analysis. To generate the external behaviour, each firing sequence of the subnet is replaced by an atomic transition internal to the module, and the firing of these transitions transforms the input and output markings of the module. Thus local events are concealed through the projection of the external behaviour of modules. This hybrid design approach preserves properties of interest, such as boundedness and liveness, while the systematic concealment of local events allows the management of state space. The approach presented in this research is particularly suited to distributed systems, as the underlying communication model is used as the basis for the interconnection of modules in the design procedure. This hybrid approach is applied to Petri net based design and analysis of distributed controllers for two industrial applications that incorporate the robust, real-time commit protocols developed. Temporal Petri nets, which combine Petri nets and temporal logic, are used to capture and verify causal and temporal aspects of the designs in a unified manner.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this thesis is to present numerical investigations of the polarisation mode dispersion (PMD) effect. Outstanding issues on the side of the numerical implementations of PMD are resolved and the proposed methods are further optimized for computational efficiency and physical accuracy. Methods for the mitigation of the PMD effect are taken into account and simulations of transmission system with added PMD are presented. The basic outline of the work focusing on PMD can be divided as follows. At first the widely-used coarse-step method for simulating the PMD phenomenon as well as a method derived from the Manakov-PMD equation are implemented and investigated separately through the distribution of a state of polarisation on the Poincaré sphere, and the evolution of the dispersion of a signal. Next these two methods are statistically examined and compared to well-known analytical models of the probability distribution function (PDF) and the autocorrelation function (ACF) of the PMD phenomenon. Important optimisations are achieved, for each of the aforementioned implementations in the computational level. In addition the ACF of the coarse-step method is considered separately, based on the result which indicates that the numerically produced ACF, exaggerates the value of the correlation between different frequencies. Moreover the mitigation of the PMD phenomenon is considered, in the form of numerically implementing Low-PMD spun fibres. Finally, all the above are combined in simulations that demonstrate the impact of the PMD on the quality factor (Q=factor) of different transmission systems. For this a numerical solver based on the coupled nonlinear Schrödinger equation is created which is otherwise tested against the most important transmission impairments in the early chapters of this thesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When making predictions with complex simulators it can be important to quantify the various sources of uncertainty. Errors in the structural specification of the simulator, for example due to missing processes or incorrect mathematical specification, can be a major source of uncertainty, but are often ignored. We introduce a methodology for inferring the discrepancy between the simulator and the system in discrete-time dynamical simulators. We assume a structural form for the discrepancy function, and show how to infer the maximum-likelihood parameter estimates using a particle filter embedded within a Monte Carlo expectation maximization (MCEM) algorithm. We illustrate the method on a conceptual rainfall-runoff simulator (logSPM) used to model the Abercrombie catchment in Australia. We assess the simulator and discrepancy model on the basis of their predictive performance using proper scoring rules. This article has supplementary material online. © 2011 International Biometric Society.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis reports on the results of case studies in four commercial banks in Nigeria. The study focuses how management accounting and control systems (MCS) operate in the four banks. The study is motivated by the dearth of literature on management accounting practices in the developing world in general and in Nigeria in specific. The case study approach adopted in conducting the research was useful in exploring the dynamics of the MCS in the organisations. Data was gathered from two sources. First, semi-structured interviews were conducted with managers at the head office, regional office and branches of each bank. The participants were selected from different backgrounds and managerial levels to provide broader understanding of the operations of the MCS. Second, various internal and external documents were reviewed to provide supporting evidence for the interview results. New institutional sociology (NIS) provided the theoretical framework to understand the results. NIS provided explanations for how the MCS in the four banks were shaped by diverse external and internal factors. The key factors identified as shaping the operations of the MCS were the need to comply with the regulatory environment (coercive isomorphism), the need to maintain social and cultural support (normative isomorphism) and the need to imitate successful organisations in order to appear legitimate (mimetic isomorphism). The study also examines the interplay between the institutional forces, market forces and infra-organisational power relations. This analysis is necessary to overcome the criticism of NIS that it downplays the role of market forces, agency and intra-organisational relations. The findings of the study have implications for understanding the operations of MCS in the developing world.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research explores the links between the strategies adopted by companies and the mechanisms used to control the organisation. This is not seen as a one way process with the control system following from the strategy but rather as an interactive process between the control systems, the environment and the business strategy. The main proposition of the research, derived from a review of the relevant literature, is that the dimensions of Business Pro-Activity and Environmental Change provide a plausible explanation of the reasons why companies need to adopt different strategies in order to be successful in different markets. A model is proposed which links these dimensions with the business strategy, organisational structure, strategic planning system and management control systems. The model is used as a framework for analysing four companies in order to further our understanding of these interactions and the mechanisms which act to both promote and resist change. Whilst it is not suggested that the model in its present form is a perfect instrument it has, during the course of this research, proved to be an appropriate framework for analysing the various mechanisms used by four companies to formulate and implement their strategies. The research reveals that these should not be viewed independently but as a balanced system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Computerised production control developments have concentrated on Manufacturing Resources Planning (MRP II) systems. The literature suggests however, that despite the massive investment in hardware, software and management education, successful implementation of such systems in manufacturing industries has proved difficult. This thesis reviews the development of production planning and control systems, in particular, investigates the causes of failures in implementing MRP/MRP II systems in industrial environments and argues that the centralised and top-down planning structure, as well as the routine operational methodology of such systems, is inherently prone to failure. The thesis reviews the control benefits of cellular manufacturing systems but concludes that in more dynamic manufacturing environments, techniques such as Kanban are inappropriate. The basic shortcomings of MRP II systems are highlighted and a new enhanced operational methodology based on distributed planning and control principles is introduced. Distributed Manufacturing Resources Planning (DMRP), was developed as a capacity sensitive production planning and control solution for cellular manufacturing environments. The system utilises cell based, independently operated MRP II systems, integrated into a plant-wide control system through a Local Area Network. The potential benefits of adopting the system in industrial environments is discussed and the results of computer simulation experiments to compare the performance of the DMRP system against the conventional MRP II systems presented. DMRP methodology is shown to offer significant potential advantages which include ease of implementation, cost effectiveness, capacity sensitivity, shorter manufacturing lead times, lower working in progress levels and improved customer service.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis deals with the problems associated with the planning and control of production, with particular reference to a small aluminium die casting company. The main problem areas were identified as: (a) A need to be able to forecast the customers demands upon the company's facilities. (b) A need to produce a manufacturing programme in which the output of the foundry (or die casting section) was balanced with the available capacity in the machine shop. (c) The need to ensure that the resultant system enabled the company's operating budget to have a reasonable chance of being achieved. At the commencement of the research work the major customers were members of the automobile industry and had their own system of forecasting, from which they issued manufacturing schedules to their component suppliers, The errors in the forecast were analysed and the distributions noted. Using these distributions the customer's forecast was capable of being modified to enable his final demand to be met with a known degree of confidence. Before a manufacturing programme could be developed the actual manufacturing system had to be reviewed and it was found that as with many small companies there was a remarkable lack of formal control and written data. Relevant data with regards to the component and the manufacturing process had therefore to be collected and analysed. The foundry process was fixed but the secondary machining operations were analysed by a technique similar to Component Flow Analysis and as a result the machines were arranged in a series of flow lines. A system of manual production control was proposed and for comparison, a local computer bureau was approached and a system proposed incorporating the production of additional management information. These systems are compared and the relative merits discussed and a proposal made for implementation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT