Operating oil pipelines in an optimum capacity through out its life, effective construction management and failure free operations are considered as critical success factors in oil transportation business. Operating oil pipelines in derated capacity due to deteriorating pipeline health or lack of demand, non-ability of augmenting pipeline capacity despite of demand, non-achievement of time, cost, and quality of pipeline construction projects, and many failures of pipelines despite of huge expenditure in inspection and maintenance are the common phenomena in oil pipelines industry. These not only cause business loss, but also increase stakeholders' concerns for sustainable development. This study addresses the above issues using an analytical framework through stakeholders' involvement. Copyright © 2006 Inderscience Enterprises Ltd.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Britain's sea and flood defences are becoming increasingly aged and as a consequence, more fragile and vulnerable. As the government's philosophy on resources shifts against the use of prime quarried and dredged geo-materials, the need to find alternative bulk materials to bolster Britain's prone defences becomes more pressing. One conceivable source for such a material is colliery waste or minestone. Although a plethora of erosion-abrasion studies have been carried out on soils and soil-cements, very little research has been undertaken to determine the resistance of minestone and its cement stabilized form to the effects of water erosion. The thesis reviews the current extent to which soil-cements, minestone and cement stabilized minestone (CSM) have been employed for hydraulic construction projects. A synopsis is also given on the effects of immersion on shales, mudstones and minestone, especially with regard to the phenomena of slaking. A laboratory study was undertaken featuring a selection of minestones from several British coalfields. The stability of minestone and CSM in sea water and distilled water was assessed using slaking tests and immersion monitoring and the bearing on the use of these materials for hydraulic construction is discussed. Following a review of current erosion apparatus, the erosion/abrasion test and rotating cylinder device were chosen and employed to assess the erosion resistance of minestone and CSM. Comparison was made with a sand mix designed to represent a dredged sand, the more traditional, bulk hydraulic construction material. The results of the erosion study suggest that both minestone and CSM were more resistant to erosion and abrasion than equivalently treated sand mixes. The greater resistance of minestone to the agents of erosion and abrasion is attributed to several factors including the size of the particles, a greater degree of cement bonding and the ability of the minestone aggregate to absorb, rather than transmit shock waves produced by impacting abrasive particles. Although minestone is shown to be highly unstable when subjected to cyclic changes in its moisture content, the study suggests that even in an intertidal regime where cyclic immersion does takes place, minestone will retain sufficient moisture within its fabric to prevent slaking from taking place. The slaking study reveals a close relationship between slaking susceptibility and total pore surface area as revealed by porosimetry. The immersion study shows that although the fabric of CSM is rapidly attacked in sea water, a high degree of the disruption is associated with the edges and corners of samples (ie. free surface) while the integrity of the internal fabric remains relatively intact. CSM samples were shown to be resilient when subjected to immersion in distilled water. An overall assessment of minestone and CSM would suggest that with the implementation of judicious selection and appropriate quality control they could be used as alternative materials for flood and sea defences. It is believed, that even in the harsh regime of a marine environment, CSM could be employed for temporary and sacrificial schemes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Korea has increasingly adopted design-build for public construction projects in the last few years. There is a much greater awareness of the need to change a system based on ‘Value for Money’ which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process as the bid awarding system is being changed from one based on lowest price, to one based on best value over the life-cycle. Key criteria like whole life cost, service life planning and design quality are important through the key stages of evaluation process. The model uses a systematic and holistic approach which enables a public sector to make better decisions in design-builder selection, which will deliver whole life benefits, based on long term cost-effectiveness and whole life.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Construction customers are persistently seeking to achieve sustainability and maximize value as sustainability has become a major consideration in the construction industry. In particular, it is essential to refurbish a whole house to achieve the sustainability agenda of 80% CO2 reduction by 2050 as the housing sector accounts for 28% of the total UK CO2 emission. However, whole house refurbishment seems to be challenging due to the highly fragmented nature of construction practice, which makes the integration of diverse information throughout the project lifecycle difficult. Consequently, Building Information Modeling (BIM) is becoming increasingly difficult to ignore in order to manage construction projects in a collaborative manner, although the current uptake of the housing sector is low at 25%. This research aims to investigate homeowners’ decision making factors for housing refurbishment projects and to provide a valuable dataset as an essential input to BIM for such projects. One-hundred and twelve homeowners and 39 construction professionals involved in UK housing refurbishment were surveyed. It was revealed that homeowners value initial cost more while construction professionals value thermal performance. The results supported that homeowners and professionals both considered the first priority to be roof refurbishment. This research revealed that BIM requires a proper BIM dataset and objects for housing refurbishment.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The UK government aims at achieving 80% CO2 emission reduction by 2050 which requires collective efforts across all the UK industry sectors. In particular, the housing sector has a large potential to contribute to achieving the aim because the housing sector alone accounts for 27% of the total UK CO2 emission, and furthermore, 87% of the housing which is responsible for current 27% CO2 emission will still stand in 2050. Therefore, it is essential to improve energy efficiency of existing housing stock built with low energy efficiency standard. In order for this, a whole‐house needs to be refurbished in a sustainable way by considering the life time financial and environmental impacts of a refurbished house. However, the current refurbishment process seems to be challenging to generate a financially and environmentally affordable refurbishment solution due to the highly fragmented nature of refurbishment practice and a lack of knowledge and skills about whole‐house refurbishment in the construction industry. In order to generate an affordable refurbishment solution, diverse information regarding costs and environmental impacts of refurbishment measures and materials should be collected and integrated in right sequences throughout the refurbishment project life cycle among key project stakeholders. Consequently, various researchers increasingly study a way of utilizing Building Information Modelling (BIM) to tackle current problems in the construction industry because BIM can support construction professionals to manage construction projects in a collaborative manner by integrating diverse information, and to determine the best refurbishment solution among various alternatives by calculating the life cycle costs and lifetime CO2 performance of a refurbishment solution. Despite the capability of BIM, the BIM adoption rate is low with 25% in the housing sector and it has been rarely studied about a way of using BIM for housing refurbishment projects. Therefore, this research aims to develop a BIM framework to formulate a financially and environmentally affordable whole‐house refurbishment solution based on the Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) methods simultaneously. In order to achieve the aim, a BIM feasibility study was conducted as a pilot study to examine whether BIM is suitable for housing refurbishment, and a BIM framework was developed based on the grounded theory because there was no precedent research. After the development of a BIM framework, this framework was examined by a hypothetical case study using BIM input data collected from questionnaire survey regarding homeowners’ preferences for housing refurbishment. Finally, validation of the BIM framework was conducted among academics and professionals by providing the BIM framework and a formulated refurbishment solution based on the LCC and LCA studies through the framework. As a result, BIM was identified as suitable for housing refurbishment as a management tool, and it is timely for developing the BIM framework. The BIM framework with seven project stages was developed to formulate an affordable refurbishment solution. Through the case study, the Building Regulation is identified as the most affordable energy efficiency standard which renders the best LCC and LCA results when it is applied for whole‐house refurbishment solution. In addition, the Fabric Energy Efficiency Standard (FEES) is recommended when customers are willing to adopt high energy standard, and the maximum 60% of CO2 emissions can be reduced through whole‐house fabric refurbishment with the FEES. Furthermore, limitations and challenges to fully utilize BIM framework for housing refurbishment were revealed such as a lack of BIM objects with proper cost and environmental information, limited interoperability between different BIM software and limited information of LCC and LCA datasets in BIM system. Finally, the BIM framework was validated as suitable for housing refurbishment projects, and reviewers commented that the framework can be more practical if a specific BIM library for housing refurbishment with proper LCC and LCA datasets is developed. This research is expected to provide a systematic way of formulating a refurbishment solution using BIM, and to become a basis for further research on BIM for the housing sector to resolve the current limitations and challenges. Future research should enhance the BIM framework by developing more detailed process map and develop BIM objects with proper LCC and LCA Information.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In an exploding and fluctuating construction market, managers are facing a challenge, which is how to manage business on a wider scale and to utilize modern developments in information technology to promote productivity. The extraordinary development of telecommunications and computer technology makes it possible for people to plan, lead, control, organize and manage projects from a distance without the need to be on site on a daily basis. A modern management known as distance management (DM) or remote management is emerging. Physical distance no longer determines the boundary of management since managers can now operate projects through virtual teams that organize manpower, material and production without face-to-face communication. What organization prototype could overcome psychological and physical barriers to reengineer a successful project through information technology? What criteria distinguishes the adapted way of communication of individual activities in a teamwork and assist the integration of an efficient and effective communication between face-to-face and a physical distance? The entire methodology has been explained through a case application on refuse incineration plant projects in Taiwan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The UK experienced a number of Extreme Weather Events (EWEs) during recent years and a significant number of businesses were affected as a result. With the intensity and frequency of weather extremes predicted in the future, enhancing the resilience of businesses, especially of Small and Medium-sized Enterprises (SMEs), who are considered as highly vulnerable, has become a necessity. However, little research has been undertaken on how construction SMEs respond to the risk of EWEs. In seeking to help address this dearth of research, this investigation sought to identify how construction SMEs were being affected by EWEs and the coping strategies being used. Design/methodology/approach – A mixed methods research design was adopted to elicit information from construction SMEs, involving a questionnaire survey and case study approach. Findings – Results indicate a lack of coping strategies among the construction SMEs studied. Where the coping strategies have been implemented, these were found to be extensions of their existing risk management strategies rather than radical measures specifically addressing EWEs. Research limitations/implications – The exploratory survey focused on the Greater London area and was limited to a relatively small sample size. This limitation is overcome by conducting detailed case studies utilising two SMEs whose projects were located in EWE prone localities. The mixed method research design adopted benefits the research by presenting more robust findings. Practical implications – A better way of integrating the potential of EWEs into the initial project planning stage is required by the SMEs. This could possibly be achieved through a better risk assessment model supported by better EWE prediction data. Originality/value – The paper provides an original contribution towards the overarching agenda of resilience of SMEs and policy making in the area of EWE risk management. It informs both policy makers and practitioners on issues of planning and preparedness against EWEs.