21 resultados para Construction industry - Cost effectiveness


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background/aims: Retinal screening programmes in England and Scotland have similar photographic grading schemes for background (non-proliferative) and proliferative diabetic retinopathy, but diverge over maculopathy. We looked for the most cost-effective method of identifying diabetic macular oedema from retinal photographs including the role of automated grading and optical coherence tomography, a technology that directly visualises oedema. Methods: Patients from seven UK centres were recruited. The following features in at least one eye were required for enrolment: microaneurysms/dot haemorrhages or blot haemorrhages within one disc diameter, or exudates within one or two disc diameters of the centre of the macula. Subjects had optical coherence tomography and digital photography. Manual and automated grading schemes were evaluated. Costs and QALYs were modelled using microsimulation techniques. Results: 3540 patients were recruited, 3170 were analysed. For diabetic macular oedema, England's scheme had a sensitivity of 72.6% and specificity of 66.8%; Scotland 's had a sensitivity of 59.5% and specificity of 79.0%. When applying a ceiling ratio of £30 000 per quality adjusted life years (QALY) gained, Scotland's scheme was preferred. Assuming automated grading could be implemented without increasing grading costs, automation produced a greater number of QALYS for a lower cost than England's scheme, but was not cost effective, at the study's operating point, compared with Scotland's. The addition of optical coherence tomography, to each scheme, resulted in cost savings without reducing health benefits. Conclusions: Retinal screening programmes in the UK should reconsider the screening pathway to make best use of existing and new technologies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: Heavy menstrual bleeding (HMB) is a common problem, yet evidence to inform decisions about initial medical treatment is limited. OBJECTIVES: To assess the clinical effectiveness and cost-effectiveness of the levonorgestrel-releasing intrauterine system (LNG-IUS) (Mirena(®), Bayer) compared with usual medical treatment, with exploration of women's perspectives on treatment. DESIGN: A pragmatic, multicentre randomised trial with an economic evaluation and a longitudinal qualitative study. SETTING: Women who presented in primary care. PARTICIPANTS: A total of 571 women with HMB. A purposeful sample of 27 women who were randomised or ineligible owing to treatment preference participated in semistructured face-to-face interviews around 2 and 12 months after commencing treatment. INTERVENTIONS: LNG-IUS or usual medical treatment (tranexamic acid, mefenamic acid, combined oestrogen-progestogen or progesterone alone). Women could subsequently swap or cease their allocated treatment. OUTCOME MEASURES: The primary outcome was the patient-reported score on the Menorrhagia Multi-Attribute Scale (MMAS) assessed over a 2-year period and then again at 5 years. Secondary outcomes included general quality of life (QoL), sexual activity, surgical intervention and safety. Data were analysed using iterative constant comparison. A state transition model-based cost-utility analysis was undertaken alongside the randomised trial. Quality-adjusted life-years (QALYs) were derived from the European Quality of Life-5 Dimensions (EQ-5D) and the Short Form questionnaire-6 Dimensions (SF-6D). The intention-to-treat analyses were reported as cost per QALY gained. Uncertainty was explored by conducting both deterministic and probabilistic sensitivity analyses. RESULTS: The MMAS total scores improved significantly in both groups at all time points, but were significantly greater for the LNG-IUS than for usual treatment [mean difference over 2 years was 13.4 points, 95% confidence interval (CI) 9.9 to 16.9 points; p < 0.001]. However, this difference between groups was reduced and no longer significant by 5 years (mean difference in scores 3.9 points, 95% CI -0.6 to 8.3 points; p = 0.09). By 5 years, only 47% of women had a LNG-IUS in place and 15% were still taking usual medical treatment. Five-year surgery rates were low, at 20%, and were similar, irrespective of initial treatments. There were no significant differences in serious adverse events between groups. Using the EQ-5D, at 2 years, the relative cost-effectiveness of the LNG-IUS compared with usual medical treatment was £1600 per QALY, which by 5 years was reduced to £114 per QALY. Using the SF-6D, usual medical treatment dominates the LNG-IUS. The qualitative findings show that women's experiences and expectations of medical treatments for HMB vary considerably and change over time. Women had high expectations of a prompt effect from medical treatments. CONCLUSIONS: The LNG-IUS, compared with usual medical therapies, resulted in greater improvement over 2 years in women's assessments of the effect of HMB on their daily routine, including work, social and family life, and psychological and physical well-being. At 5 years, the differences were no longer significant. A similar low proportion of women required surgical intervention in both groups. The LNG-IUS is cost-effective in both the short and medium term, using the method generally recommended by the National Institute for Health and Care Excellence. Using the alternative measures to value QoL will have a considerable impact on cost-effectiveness decisions. It will be important to explore the clinical and health-care trajectories of the ECLIPSE (clinical effectiveness and cost-effectiveness of levonorgestrel-releasing intrauterine system in primary care against standard treatment for menorrhagia) trial participants to 10 years, by which time half of the cohort will have reached menopause. TRIAL REGISTRATION: Current Controlled Trials ISRCTN86566246. FUNDING: This project was funded by the NIHR Health Technology Assessment programme and will be published in full in Health Technology Assessment; Vol. 19, No. 88. See the NIHR Journals Library website for further project information.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Computerised production control developments have concentrated on Manufacturing Resources Planning (MRP II) systems. The literature suggests however, that despite the massive investment in hardware, software and management education, successful implementation of such systems in manufacturing industries has proved difficult. This thesis reviews the development of production planning and control systems, in particular, investigates the causes of failures in implementing MRP/MRP II systems in industrial environments and argues that the centralised and top-down planning structure, as well as the routine operational methodology of such systems, is inherently prone to failure. The thesis reviews the control benefits of cellular manufacturing systems but concludes that in more dynamic manufacturing environments, techniques such as Kanban are inappropriate. The basic shortcomings of MRP II systems are highlighted and a new enhanced operational methodology based on distributed planning and control principles is introduced. Distributed Manufacturing Resources Planning (DMRP), was developed as a capacity sensitive production planning and control solution for cellular manufacturing environments. The system utilises cell based, independently operated MRP II systems, integrated into a plant-wide control system through a Local Area Network. The potential benefits of adopting the system in industrial environments is discussed and the results of computer simulation experiments to compare the performance of the DMRP system against the conventional MRP II systems presented. DMRP methodology is shown to offer significant potential advantages which include ease of implementation, cost effectiveness, capacity sensitivity, shorter manufacturing lead times, lower working in progress levels and improved customer service.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Radio-frequency identification technology (RFID) is a popular modern technology proven to deliver a range of value-added benefits to achieve system and operational efficiency, as well as cost-effectiveness. The operational characteristics of RFID outperform barcodes in many aspects. One of the main challenges for RFID adoption is proving its ability to improve competitiveness. In this paper, we examine multiple real-world examples where RFID technology has been demonstrated to provide significant benefits to industry competitiveness, and also to enhance human experience in the service sector. This paper will explore and survey existing value-added applications of RFID systems in industry and the service sector, with particular focus on applications in retail, logistics, manufacturing, healthcare, leisure and the public sector. © 2012 AICIT.