21 resultados para Command and control system


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study describes a pragmatic approach to the implementation of production planning and scheduling techniques in foundries of all types and looks at the use of `state-of-the-art' management control and information systems. Following a review of systems for the classification of manufacturing companies, a definitive statement is made which highlights the important differences between foundries (i.e. `component makers') and other manufacturing companies (i.e. `component buyers'). An investigation of the manual procedures which are used to plan and control the manufacture of components reveals the inherent problems facing foundry production management staff, which suggests the unsuitability of many manufacturing techniques which have been applied to general engineering companies. From the literature it was discovered that computer-assisted systems are required which are primarily `information-based' rather than `decision based', whilst the availability of low-cost computers and `packaged-software' has enabled foundries to `get their feet wet' without the financial penalties which characterized many of the early attempts at computer-assistance (i.e. pre-1980). Moreover, no evidence of a single methodology for foundry scheduling emerged from the review. A philosophy for the development of a CAPM system is presented, which details the essential information requirements and puts forward proposals for the subsequent interactions between types of information and the sub-system of CAPM which they support. The work developed was oriented specifically at the functions of production planning and scheduling and introduces the concept of `manual interaction' for effective scheduling. The techniques developed were designed to use the information which is readily available in foundries and were found to be practically successful following the implementation of the techniques into a wide variety of foundries. The limitations of the techniques developed are subsequently discussed within the wider issues which form a CAPM system, prior to a presentation of the conclusions which can be drawn from the study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis presents an account of an attempt to utilize expert systems within the domain of production planning and control. The use of expert systems was proposed due to the problematical nature of a particular function within British Steel Strip Products' Operations Department: the function of Order Allocation, allocating customer orders to a production week and site. Approaches to tackling problems within production planning and control are reviewed, as are the general capabilities of expert systems. The conclusions drawn are that the domain of production planning and control contains both `soft' and `hard' problems, and that while expert systems appear to be a useful technology for this domain, this usefulness has by no means yet been demonstrated. Also, it is argued that the main stream methodology for developing expert systems is unsuited for the domain. A problem-driven approach is developed and used to tackle the Order Allocation function. The resulting system, UAAMS, contained two expert components. One of these, the scheduling procedure was not fully implemented due to inadequate software. The second expert component, the product routing procedure, was untroubled by such difficulties, though it was unusable on its own; thus a second system was developed. This system, MICRO-X10, duplicated the function of X10, a complex database query routine used daily by Order Allocation. A prototype version of MICRO-X10 proved too slow to be useful but allowed implementation and maintenance issues to be analysed. In conclusion, the usefulness of the problem-driven approach to expert systems development within production planning and control is demonstrated but restrictions imposed by current expert system software are highlighted in that the abilities of such software to cope with `hard' scheduling constructs and also the slow processing speeds of such software can restrict the current usefulness of expert systems within production planning and control.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years the topic of risk management has moved up the agenda of both government and industry, and private sector initiatives to improve risk and internal control systems have been mirrored by similar promptings for change in the public sector. Both regulators and practitioners now view risk management as an integral part of the process of corporate governance, and an aid to the achievement of strategic objectives. The paper uses case study material on the risk management control system at Birmingham City Council to extend existing theory by developing a contingency theory for the public sector. The case demonstrates that whilst the structure of the control system fits a generic model, the operational details indicate that controls are contingent upon three core variables—central government policies, information and communication technology and organisational size. All three contingent variables are suitable for testing the theory across the broader public sector arena.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to consider hierarchical control as a mode of governance, and analyses the extent of control exhibited by central government over local government through the best value (BV) and comprehensive performance assessment (CPA) performance regimes. Design/methodology/approach – This paper utilises Ouchi's framework and, specifically, his articulation of bureaucratic or hierarchical control in the move towards achievement of organisational objectives. Hierarchical control may be inferred from the extent of “command and control” by Central Government, use of rewards and sanctions, and alignment to government priorities and discrimination of performance. Findings – CPA represents a more sophisticated performance regime than BV in the governance of local authorities by central government. In comparison to BV, CPA involved less scope for dialogue with local government prior to introduction, closer inspection of and direction of support toward poorer performing authorities, and more alignment to government priorities in the weightings attached to service blocks. Originality/value - The paper focuses upon the hierarchic/bureaucratic mode of governance as articulated by Ouchi and expands on this mode in order to analyse shifts in performance regimes in the public sector.