19 resultados para Ponzi schemes
Resumo:
This thesis presents a theoretical investigation on applications of Raman effect in optical fibre communication as well as the design and optimisation of various Raman based devices and transmission schemes. The techniques used are mainly based on numerical modelling. The results presented in this thesis are divided into three main parts. First, novel designs of Raman fibre lasers (RFLs) based on Phosphosilicate core fibre are analysed and optimised for efficiency by using a discrete power balance model. The designs include a two stage RFL based on Phosphosilicate core fibre for telecommunication applications, a composite RFL for the 1.6 μm spectral window, and a multiple output wavelength RFL aimed to be used as a compact pump source for fiat gain Raman amplifiers. The use of Phosphosilicate core fibre is proven to effectively reduce the design complexity and hence leads to a better efficiency, stability and potentially lower cost. Second, the generalised Raman amplified gain model approach based on the power balance analysis and direct numerical simulation is developed. The approach can be used to effectively simulate optical transmission systems with distributed Raman amplification. Last, the potential employment of a hybrid amplification scheme, which is a combination between a distributed Raman amplifier and Erbium doped amplifier, is investigated by using the generalised Raman amplified gain model. The analysis focuses on the use of the scheme to upgrade a standard fibre network to 40 Gb/s system.
Resumo:
Recent surveys reveal that many university students in the U.K. are not satisfied with the timeliness and usefulness of the feedback given by their tutors. Ensuring timeliness in marking can result in a reduction in the quality of feedback. Though suitable use of Information and Communication Technology should alleviate this problem, existing Virtual Learning Environments are inadequate to support detailed marking scheme creation and they provide little support for giving detailed feedback. This paper describes a unique new web-based tool called e-CAF for facilitating coursework assessment and feedback management directed by marking schemes. Using e-CAF, tutors can create or reuse detailed marking schemes efficiently without sacrificing the accuracy or thoroughness in marking. The flexibility in marking scheme design also makes it possible for tutors to modify a marking scheme during the marking process without having to reassess the students’ submissions. The resulting marking process will become more transparent to students.
Resumo:
An analytical first order calculation of the impact of Gaussian white noise on a novel single Mach-Zehnder Interferometer demodulation scheme for DQPSK reveals a constant Q factor ratio to the conventional scheme.
Resumo:
The main aim of this thesis is to evaluate the economic and socio-economic viability of energy crops as raw material for bioenergy schemes at the local level. The case examined is Greece, a southern Mediterranean country. Based on the current state, on foreseen trends and on the information presented in the literature review (conducted at the beginning of the study), the main goal was defined as follows: To examine the evidence supporting a strong role for dedicated energy crops local bioenergy developments in Greece, a sector that is forecasted to be increasingly important in the short to medium term.' Two perennial energy crops, cardoon (Cynara cardunculus L.) and giant reed (Arundo donax L.) were evaluated. The thesis analysed their possible introduction in the agricultural system of Rhodope, northern Greece, as alternative land use, through comparative financial appraisal with the main conventional crops. Based on the output of this comparative analysis, the breakeven for the two selected energy crops was defined along with a sensitivity analysis for the risk of the potential implementation. Following, the author performed an economic and socio-economic evaluation of a district heating system fuelled with energy crops in the selected region. Finally, the author, acknowledging that bioenergy deployment should be studied in the context of innovations proceeded in examining the different perceptions of the key groups involved, farmers and potential end users. Results indicated that biomass exploitation for energy purposes is more likely to be accepted when it is seen clearly as one strand in a national energy, environmental and agricultural policy which embraces several sources of renewable energy, and which also encourages energy efficiency and conservation.
Resumo:
The current rate of global biodiversity loss led many governments to sign the international agreement ‘Halting Biodiversity Loss by 2010 and beyond’ in 2001. The UK government was one of these and has a number of methods to tackle this, such as: commissioning specific technical guidance and supporting the UK Biodiversity Acton Plan (BAP) targets. However, by far the most effective influence the government has upon current biodiversity levels is through the town planning system. This is due to the control it has over all phases of a new development scheme’s lifecycle.There is an increasing myriad of regulations, policies and legislation, which deal with biodiversity protection and enhancement across the hierarchical spectrum: from the global and European level, down to regional and local levels. With these drivers in place, coupled with the promotion of benefits and incentives, increasing biodiversity value ought to be an achievable goal on most, if not all development sites. However, in the professional world, this is not the case due to a number of obstructions. Many of these tend to be ‘process’ barriers, which are particularly prevalent with ‘urban’ and ‘major’ development schemes, and is where the focus of this research paper lies.The paper summarises and discusses the results of a questionnaire survey, regarding obstacles to maximising biodiversity enhancements on major urban development schemes. The questionnaire was completed by Local Government Ecologists in England. The paper additionally refers to insights from previous action research, specialist interviews, and case studies, to reveal the key process obstacles.Solutions to these obstacles are then alluded to and recommendations are made within the discussion.
Resumo:
IEEE 802.16 standard specifies two contention based bandwidth request schemes working with OFDM physical layer specification in point-to-multipoint (PMP) architecture, the mandatory one used in region-full and the optional one used in region-focused. This letter presents a unified analytical model to study the bandwidth efficiency and channel access delay performance of the two schemes. The impacts of access parameters, available bandwidth and subchannelization have been taken into account. The model is validated by simulations. The mandatory scheme is observed to perform closely to the optional one when subchannelization is active for both schemes.
Resumo:
This work numerically analyzes the performances of a 2R (reamplification and reshaping) regenerator based on a nonlinear optical loop mirror and a 3R (reamplification, reshaping, and retiming) regenerator using a nonlinearly enhanced amplitude modulator in 40-Gb/s standard single-mode fiber (SMF)-based optical networks with large amplifier spacing. The characteristics of one(600 km of SMF) and two-step regeneration are examined and the feasibility of wavelength-division multiplexing (WDM) operation is demonstrated.
Resumo:
Multicast is an efficient approach to save network bandwidth for multimedia streaming services. To provide Quality of Services (QoS) for the multimedia services while maintain the advantage of multicast in bandwidth efficiency, admission control for multicast sessions are expected. Probe-based multicast admission control (PBMAC) schemes are of a sort of scalable and simple admission control for multicast. Probing scheme is the essence of PBMAC. In this paper, after a detailed survey on three existing probing schemes, we evaluate these schemes using simulation and analysis approaches in two aspects: admission correctness and group scalability. Admission correctness of the schemes is compared by simulation investigation. Analytical models for group scalability are derived, and validated by simulation results. The evaluation results illustrate the advantages and weaknesses of each scheme, which are helpful for people to choose proper probing scheme for network.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
This paper numerically analyzes the performances of a 2R (reamplification and reshaping) regenerator based on a nonlinear optical loop mirror and a 3R (reamplification, reshaping, and retiming) regenerator using a nonlinearly enhanced amplitude modulator in 40-Gb/s standard single-mode fiber (SMF)-based optical networks with large amplifier spacing. The characteristics of one- (600 km of SMF) and two-step regeneration are examined and the feasibility of wavelength-division multiplexing operation is demonstrated. © 2005 IEEE.
Resumo:
This article presents a potential method to assist developers of future bioenergy schemes when selecting from available suppliers of biomass materials. The method aims to allow tacit requirements made on biomass suppliers to be considered at the design stage of new developments. The method used is a combination of the Analytical Hierarchy Process and the Quality Function Deployment methods (AHP-QFD). The output of the method is a ranking and relative weighting of the available suppliers which could be used to improve optimization algorithms such as linear and goal programming. The paper is at a conceptual stage and no results have been obtained. The aim is to use the AHP-QFD method to bridge the gap between treatment of explicit and tacit requirements of bioenergy schemes; allowing decision makers to identify the most successful supply strategy available.
Resumo:
bCHP (Biomass combined heat and power) systems are highly efficient at smaller-scales when a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost fossil fuel incumbent. The paper reviews the barriers to small-scale bCHP project development in the UK along with a case study of a failed 1.5MWel bCHP scheme. The paper offers possible explanations for the project's failure and suggests adaptations to improve the project resilience. Analysis of the project's: capital structuring contract length and bankability; feedstock type and price uncertainty, and plant oversizing highlight the negative impact of the existing project barriers on project development. The research paper concludes with a discussion on the effects of these barriers on the case study project and this industry more generally. A greater understanding of the techno-economic effects of some barriers for small-scale bCHP schemes is demonstrated within this paper, along with some methods for improving the attractiveness and resilience of projects of this kind. © 2014 Elsevier Ltd.
Resumo:
We report an experimental comparison between broadband fibre Bragg gratings (FBGs) and conventional dispersion compensating fibre (DCF) for a 40 x 10Gb/s DWDM system over 525km. A performanceoptimised configuration using FBG compensators is presented.
Resumo:
This chapter discusses network protection of high-voltage direct current (HVDC) transmission systems for large-scale offshore wind farms where the HVDC system utilizes voltage-source converters. The multi-terminal HVDC network topology and protection allocation and configuration are discussed with DC circuit breaker and protection relay configurations studied for different fault conditions. A detailed protection scheme is designed with a solution that does not require relay communication. Advanced understanding of protection system design and operation is necessary for reliable and safe operation of the meshed HVDC system under fault conditions. Meshed-HVDC systems are important as they will be used to interconnect large-scale offshore wind generation projects. Offshore wind generation is growing rapidly and offers a means of securing energy supply and addressing emissions targets whilst minimising community impacts. There are ambitious plans concerning such projects in Europe and in the Asia-Pacific region which will all require a reliable yet economic system to generate, collect, and transmit electrical power from renewable resources. Collective offshore wind farms are efficient and have potential as a significant low-carbon energy source. However, this requires a reliable collection and transmission system. Offshore wind power generation is a relatively new area and lacks systematic analysis of faults and associated operational experience to enhance further development. Appropriate fault protection schemes are required and this chapter highlights the process of developing and assessing such schemes. The chapter illustrates the basic meshed topology, identifies the need for distance evaluation, and appropriate cable models, then details the design and operation of the protection scheme with simulation results used to illustrate operation. © Springer Science+Business Media Singapore 2014.