3 resultados para Dam
em DigitalCommons - The University of Maine Research
Resumo:
The rapid unloading of ice from the southeastern sector of the Greenland ice sheet between 2001 and 2006 caused an elastic uplift of similar to 35 mm at a GPS site in Kulusuk. Most of the uplift results from ice dynamic-induced volume losses on two nearby outlet glaciers. Volume loss from Helheim Glacier, calculated from sequential digital elevation models, contributes about similar to 16 mm of the observed uplift, with an additional similar to 5 mm from volume loss of Kangerdlugssuaq Glacier. The remaining uplift signal is attributed to significant melt-induced ice volume loss from the ice sheet margin along the southeast coast between 62 degrees N and 66 degrees N.
Resumo:
I modeled the cumulative impact of hydroelectric projects with and without commercial fishing weirs and water-control dams on the production, survival to the sea, and potential fecundity of migrating female silver-phase American eels, Anguilla rostrata in the Kennebec River basin, Maine, This river basin has 22 hydroelectric projects, 73 water-control dams, and 15 commercial fishing weir sites. The modeled area included an 8,324 km(2) segment of the drainage area between Merrymeeting Bay and the upper limit of American eel distribution in the basin. One set of input,, (assumed or real values) concerned population structure (Le., population density and sex ratio changes throughout the basin, female length-class distribution, and drainage area between dams), Another set concerned factors influencing survival and potential fecundity of migrating American eels (i.e., pathway sequences through projects, survival rate per project by length-class. and length-fecundity relationship). Under baseline conditions about 402,400 simulated silver female American eels would be produced annually reductions in their numbers due to dams and weirs would reduce the realized fecundity (i.e., the number of eggs produced by all females that survived the migration). Without weirs or water-control dams, about 63% of the simulated silverphase American eels survived their freshwater spawning migration run to the sea when the survival rate at each hydroelectric dam was 9017, 40% survived at 80% survival per dam, and 18% survived at 60% survival per dam. Removing the lowermost hydroelectric dam on the Kennebec River increased survival by 6.0-7.6% for the basin. The efficient commercial weirs reduced survival to the sea to 69-76%( of what it would have been without weirs', regardless of survival rates at hydroelectric dams. Water-control dams had little impact on production in this basin because most were located in the upper reaches of tributaries. Sensitivity analysis led to the conclusion that small changes in population density and female length distribution had greater effects on survival and realized fecundity than similar changes in turbine survival rate. The latter became more important as turbine survival rate decreased. Therefore, it might be more fruitful to determine population distribution in basins of interest than to determine mortality rate at each hydroelectric project.
Resumo:
Relatively little is known about the distribution and seasonal movement patterns of shortnose sturgeon Acipenser brevirostrum and Atlantic sturgeon Acipenser oxyrinchus oxyrinchus occupying rivers in the northern part of their range. During 2006 and 2007, 40 shortnose sturgeon (66-113.4 cm fork length [FL]) and 8 Atlantic sturgeon (76.2-166.2 cm FL) were captured in the Penobscot River, Maine, implanted with acoustic transmitters, and monitored using an array of acoustic receivers in the Penobscot River estuary and Penobscot Bay. Shortnose sturgeon were present year round in the estuary and overwintered from fall (mid-October) to spring (mid-April) in the upper estuary. In early spring, all individuals moved downstream to the middle estuary. Over the course of the summer, many individuals moved upstream to approximately 2 km of the downstream-most dam (46 river kilometers [rkm] from the Penobscot River mouth [rkm 0]) by August. Most aggregated into an overwintering site (rkm 36.5) in mid-to late fall. As many as 50% of the tagged shortnose sturgeon moved into and out of the Penobscot River system during 2007, and 83% were subsequently detected by an acoustic array in the Kennebec River, located 150 km from the Penobscot River estuary. Atlantic sturgeon moved into the estuary from the ocean in the summer and concentrated into a 1.5-km reach. All Atlantic sturgeon moved to the ocean by fall, and two of these were detected in the Kennebec River. Although these behaviors are common for Atlantic sturgeon, regular coastal migrations of shortnose sturgeon have not been documented previously in this region. These results have important implications for future dam removals as well as for rangewide and river-specific shortnose sturgeon management.