5 resultados para Allotment of land
em University of Connecticut - USA
Resumo:
Free riders and holdouts are market failures that potentially impede the completion of otherwise beneficial transactions. The key difference is that the free rider problem is a demand side externality that requires taxation to compel payment for a public good, while the holdout problem is a supply side externality that requires eminent domain to force the sale of land for large scale projects. This paper highlights that distinction between these two problems and uses the resulting insights to clarify the meaning of the public use requirement of the Fifth Amendment takings clause.
Resumo:
This paper examines the impact of land title systems on property values. The predominant system in the U.S., the recording system, awards title to claimants over current possessors, whereas the Torrens registration system awards title to the current owner. In theory, the registration system maximizes property value, all else equal, but in practice, the systems differ depending on the risk of a claim and administrative costs. A natural experiment in Cook County, Illinois, where both systems have existed since 1897, allows a test of the theory. The results, based on commercial and industrial properties, reveal that parcels tend to self-select into the two systems based on the predictions of the theory.
Resumo:
This paper develops a general theory of land inheritance rules. We distinguish between two classes of rules: those that allow a testator discretion in disposing of his land (like a best-qualified rule), and those that constrain his choice (like primogeniture). The primary benefit of the latter is to prevent rent seeking by heirs, but the cost is that testators cannot make use of information about the relative abilities of his heirs to manage the land. We also account for the impact of scale economies in land use. We conclude by offering some empirical tests of the model using a cross-cultural sample of societies.
Resumo:
The holdout problem is commonly cited as the justification for eminent domain, but the nature of the problem is not well understood. This paper models the holdout problem in a bargaining framework, where a developer seeks to acquire several parcels of land for a large-scale development. We show that in the absence of eminent domain, holdouts are inevitable, threatening costly delay. However, if the developer has the power to use eminent domain to acquire the land from holdouts, all sellers will bargain, thus avoiding delay. An offsetting cost is that owners may negotiate prices below their true value, possibly resulting in excessive transfer of land to the developer.
Resumo:
This paper offers a principal-agent model of feasible private contracting in mitigation and conservation banking aimed at the protection of natural habitat and bio-diversity of US wetlands and uplands. It is shown that while it is straightforward to design an incentive contract, such a contract may not achieve the federally mandated objective of no net loss of habitat. This is because the minimum payment required as an economic incentive to private agents may be greater than what they should receive for the habitat values that they actually created in the field. This possible problem is shown to derive from nonconvexity in the production possibility set between the biological value of land as natural habitat and in non-habitat uses such as in urban development. The paper concludes with a consideration of several institutional devises that may promote the convergence of private contracting and the attainment of no net loss. These include the payment of subsidies, greater accuracy in the identification of actual quality by the principal, and the use of several incentive alignment devises.