2 resultados para [day] [integrated]

em DigitalCommons@The Texas Medical Center


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Integrated pest management is a viable alternative to traditional pest control methods. A paired sample design was utilized to measure the effect of IPM education on the number of cockroaches in a 200 unit, seven story public housing building for the elderly in Houston, TX. Glue traps were placed in 71 randomly selected apartments (5traps/unit) and left in place for two nights. Baseline cockroach counts were shared with the property manager, maintenance/janitorial staff, service coordinator, pest control professional and tenant representatives at the end of a one dayIntegrated Pest Management in Multi-Family Housingtraining course.^ There was a significant decrease in the average number of cockroaches after IPM education and implementation of IPM principles (P < 0.0003). Positive changes in behavior by members of the IPM team and changes in the housing authority operational plan were also found. Paired t-tests comparing the difference between mean cockroach counts at baseline and follow-up by location within the apartment all demonstrated a significant decrease in the number of cockroaches.^ Results supported the premise that IPM education and the implementation of IPM principles are effective measures to change pest control behaviors and control cockroaches. Cockroach infestations in multi-story housing are not solely determined by the actions of individual tenants. The actions of other residents, property managers and pest control professionals are also important factors in pest control.^ Findings support the implementation of IPM education and the adoption of IPM practices by public housing authorities. This study adds to existing evidence that clear communication of policies, a team approach and a commitment to ongoing inspection and monitoring of pests combined with corrective action to eliminate food, water and harborage and the judicial use of low risk pesticides have the potential to improve the living conditions of elderly residents living in public housing.^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A patient classification system was developed integrating a patient acuity instrument with a computerized nursing distribution method based on a linear programming model. The system was designed for real-time measurement of patient acuity (workload) and allocation of nursing personnel to optimize the utilization of resources.^ The acuity instrument was a prototype tool with eight categories of patients defined by patient severity and nursing intensity parameters. From this tool, the demand for nursing care was defined in patient points with one point equal to one hour of RN time. Validity and reliability of the instrument was determined as follows: (1) Content validity by a panel of expert nurses; (2) predictive validity through a paired t-test analysis of preshift and postshift categorization of patients; (3) initial reliability by a one month pilot of the instrument in a practice setting; and (4) interrater reliability by the Kappa statistic.^ The nursing distribution system was a linear programming model using a branch and bound technique for obtaining integer solutions. The objective function was to minimize the total number of nursing personnel used by optimally assigning the staff to meet the acuity needs of the units. A penalty weight was used as a coefficient of the objective function variables to define priorities for allocation of staff.^ The demand constraints were requirements to meet the total acuity points needed for each unit and to have a minimum number of RNs on each unit. Supply constraints were: (1) total availability of each type of staff and the value of that staff member (value was determined relative to that type of staff's ability to perform the job function of an RN (i.e., value for eight hours RN = 8 points, LVN = 6 points); (2) number of personnel available for floating between units.^ The capability of the model to assign staff quantitatively and qualitatively equal to the manual method was established by a thirty day comparison. Sensitivity testing demonstrated appropriate adjustment of the optimal solution to changes in penalty coefficients in the objective function and to acuity totals in the demand constraints.^ Further investigation of the model documented: correct adjustment of assignments in response to staff value changes; and cost minimization by an addition of a dollar coefficient to the objective function. ^