5 resultados para stochastic simulation method
em Digital Peer Publishing
Resumo:
This article deals with complex material flow systems and series connections of conveyor and op-erating elements. These can be characterised by a specific availability. The thus resultant overall availabil-ity of necessary “technical throughput” of the individual elements for the achievement of a specified throughput. When the conveyor and operating elements are subjected to a stochastic distribution, the interposition of buffers is necessary but these can also lead to a reduction of the necessary throughput due faults. The system behaviour of complex installations can only be investigated by simulation. The parame-ter changes required in order to achieve specific target values can also be determined by simulation runs in iteration loops.
Resumo:
Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.
Resumo:
Die erzielbare Fördergeschwindigkeit bei Vibrationsförderern hängt maßgeblich von der Bewegungsfunktion des Förderorganes ab. Für die gezielte Simulation dieser Anlagen mittels der diskreten Elemente Methode (DEM) ist es notwendig die geometrisch vernetzen Förderorgannachbildungen mit praxisrelevanten Bewegungsfunktionen zu beaufschlagen. Der Artikel beschreibt die Einbindung dieser Bewegungsfunktionen in die quellenoffene DEM-Software LIGGGHTS. Während des Simulationsprozesses wird eine Bewegung vernetzter CAD-Modelle durch trigonometrische Reihen ermöglicht.
Resumo:
Truncated distributions of the exponential family have great influence in the simulation models. This paper discusses the truncated Weibull distribution specifically. The truncation of the distribution is achieved by the Maximum Likelihood Estimation method or combined with the expectation and variance expressions. After the fitting of distribution, the goodness-of-fit tests (the Chi-Square test and the Kolmogorov-Smirnov test) are executed to rule out the rejected hypotheses. Finally the distributions are integrated in various simulation models, e. g. shipment consolidation model, to compare the influence of truncated and original versions of Weibull distribution on the model.
Resumo:
Im Beitrag wird ein neuartiges Förderprinzip zur federnden Aufnahme und zum Transport von massenhaft anfallenden Paketstrukturen vorgestellt. Das Förderprinzip beruht auf einem flächigen Tragmittel in Form eines veränderbaren, elastischen Verbundes von kleinskaligen Fördermodulen. Das konzipierte Transportprinzip mit peristaltischen Eigenschaften soll entstehende Staus der Pakete schnell auflösen und eine dedizierte Steuerung von Teilmengen zulassen, um den erforderlichen Durchsatz innerhalb eines Materialflusssystems zu erreichen. Diese Lösung ermöglicht eine sinnvolle Verknüpfung von Wirkprinzipien der Schüttgut- und Stückgutförderung zur Aufnahme und Fortbewegung von Pakete als Schüttgut. Die Grundfunktionalität des Förderkonzepts wird durch die numerische Simulation auf Basis der Diskrete Elemente Methode sowie der Mehrkörpersimulation überprüft.