6 resultados para Vehicle Routing Problem Multi-Trip Ricerca Operativa TSP VRP

em Digital Peer Publishing


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we propose two cooperation schemes to compose new parallel variants of the Variable Neighborhood Search (VNS). On the one hand, a coarse-grained cooperation scheme is introduced which is well suited for being enhanced with a solution warehouse to store and manage the so far best found solutions and a self-adapting mechanism for the most important search parameters. This makes an a priori parameter tuning obsolete. On the other hand, a fine-grained scheme was designed to reproduce the successful properties of the sequential VNS. In combination with the use of parallel exploration threads all of the best solutions and 11 out of 20 new best solutions for the Multi Depot Vehicle Routing Problem with Time Windows were found.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In reverse logistics networks, products (e.g., bottles or containers) have to be transported from a depot to customer locations and, after use, from customer locations back to the depot. In order to operate economically beneficial, companies prefer a simultaneous delivery and pick-up service. The resulting Vehicle Routing Problem with Simultaneous Delivery and Pick-up (VRPSDP) is an operational problem, which has to be solved daily by many companies. We present two mixed-integer linear model formulations for the VRPSDP, namely a vehicle-flow and a commodity-flow model. In order to strengthen the models, domain-reducing preprocessing techniques, and effective cutting planes are outlined. Symmetric benchmark instances known from the literature as well as new asymmetric instances derived from real-world problems are solved to optimality using CPLEX 12.1.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The procurement of transportation services via large-scale combinatorial auctions involves a couple of complex decisions whose outcome highly influences the performance of the tender process. This paper examines the shipper's task of selecting a subset of the submitted bids which efficiently trades off total procurement cost against expected carrier performance. To solve this bi-objective winner determination problem, we propose a Pareto-based greedy randomized adaptive search procedure (GRASP). As a post-optimizer we use a path relinking procedure which is hybridized with branch-and-bound. Several variants of this algorithm are evaluated by means of artificial test instances which comply with important real-world characteristics. The two best variants prove superior to a previously published Pareto-based evolutionary algorithm.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Over the past 30 years the Marlborough Family Service in London has pioneered multi-family work with marginalized families presenting simultaneously with abuse and neglect, family violence, substance misuse, educational failure and mental illness. The approach is based on a systemic multi-contextual mode and this chapter describes the evolving work, including the establishment of the first permanent multiple family day setting, specifically designed for and solely dedicated to the work with seemingly ‘hopeless’ families. The ingredients of ‘therapeutic assessments’ of parents and families are outlined and the importance of initial network meetings with professionals and family members is emphasized.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We present a new model formulation for a multi-product lot-sizing problem with product returns and remanufacturing subject to a capacity constraint. The given external demand of the products has to be satisfied by remanufactured or newly produced goods. The objective is to determine a feasible production plan, which minimizes production, holding, and setup costs. As the LP relaxation of a model formulation based on the well-known CLSP leads to very poor lower bounds, we propose a column-generation approach to determine tighter bounds. The lower bound obtained by column generation can be easily transferred into a feasible solution by a truncated branch-and-bound approach using CPLEX. The results of an extensive numerical study show the high solution quality of the proposed solution approach.