2 resultados para Static-order-trade-off

em Digital Peer Publishing


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we analyze a dynamic agency problem where contracting parties do not know the agent's future productivity at the beginning of the relationship. We consider a two-period model where both the agent and the principal observe the agent's second-period productivity at the end of the first period. This observation is assumed to be non-verifiable information. We compare long-term contracts with short-term contracts with respect to their suitability to motivate effort in both periods. On the one hand, short-term contracts allow for a better fine-tuning of second-period incentives as they can be aligned with the agent's second-period productivity. On the other hand, in short-term contracts first-period effort incentives might be distorted as contracts have to be sequentially optimal. Hence, the difference between long-term and short-term contracts is characterized by a trade-off between inducing effort in the first and in the second period. We analyze the determinants of this trade-off and demonstrate its implications for performance measurement and information system design.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.