2 resultados para Intolerance of uncertainty
em Digital Peer Publishing
Resumo:
The article examines whether the norms laid down in the Directive in relation to the exceptions and limitations on copyright and related rights can be conducive to a sensible degree of harmonisation across the European Union. Before discussing the degree of harmonisation achieved so far by the Directive, the first part gives a short overview of the main characteristics of the list of exceptions and limitations contained in Article 5 of the Directive. A comprehensive review of the implementation of each limitation by the Member States is beyond the scope of this article. The following section takes a closer look at three examples of limitations that have led to legislative changes at the Member State level as express measures towards the implementation of the Information Society Directive, that is, the limitations for the benefit of libraries, for teaching and research, and for persons with a disability. These exceptions and limitations were later on also identified by the European Commission as key elements in the deployment of a digital knowledge economy. The analysis will show that the implementation of the provisions on limitations in the Information Society Directive did not, and probably cannot, yield the expected level of harmonisation across the European Union and that, as a consequence, there still exists a significant degree of uncertainty for the stakeholders regarding the extent of permissible acts with respect to copyright protected works.
Resumo:
Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.