2 resultados para Causes of satisfaction

em Digital Peer Publishing


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The dominant emotion in violence-threatening situations is confrontational tension/fear (ct/f), which causes most violence to abort, or to be carried out inaccurately and incompetently. For violence to be successful, there must be a pathway around the barrier of ct/f. These pathways include: attacking the weak; audience-oriented staged and controlled fair fights; confrontation-avoiding remote violence; confrontation-avoiding by deception; confrontation-avoiding by absorption in technique. Successfully violent persons, on both sides of the law, are those who have developed these skilled interactional techniques. Since successful violence involves dominating the emotional attention space, only a small proportion of persons can belong to the elite which does most of each type of violence. Macro-violence, including victory and defeat in war, and in struggles of paramilitaries and social movements, is shaped by both material resources and social/emotional resources for maintaining violent organizations and forcing their opponents into organizational breakdown. Social and emotional destruction generally precedes physical destruction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.