5 resultados para phases of the project

em Digital Commons - Michigan Tech


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this research is to investigate the consequences of sharing or using information generated in one phase of the project to subsequent life cycle phases. Sometimes the assumptions supporting the information change, and at other times the context within which the information was created changes in a way that causes the information to become invalid. Often these inconsistencies are not discovered till the damage has occurred. This study builds on previous research that proposed a framework based on the metaphor of ‘ecosystems’ to model such inconsistencies in the 'supply chain' of life cycle information (Brokaw and Mukherjee, 2012). The outcome of such inconsistencies often results in litigation. Therefore, this paper studies a set of legal cases that resulted from inconsistencies in life cycle information, within the ecosystems framework. For each project, the errant information type, creator and user of the information and their relationship, time of creation and usage of the information in the life cycle of the project are investigated to assess the causes of failure of precise and accurate information flow as well as the impact of such failures in later stages of the project. The analysis shows that the misleading information is mostly due to lack of collaboration. Besides, in all the studied cases, lack of compliance checking, imprecise data and insufficient clarifications hinder accurate and smooth flow of information. The paper presents findings regarding the bottleneck of the information flow process during the design, construction and post construction phases. It also highlights the role of collaboration as well as information integration and management during the project life cycle and presents a baseline for improvement in information supply chain through the life cycle of the project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

KIVA is an open Computational Fluid Dynamics (CFD) source code that is capable to compute the transient two and three-dimensional chemically reactive fluid flows with spray. The latest version in the family of KIVA codes is the KIVA-4 which is capable of handling the unstructured mesh. This project focuses on the implementation of the Conjugate Heat Transfer code (CHT) in KIVA-4. The previous version of KIVA code with conjugate heat transfer code has been developed at Michigan Technological University by Egel Urip and is be used in this project. During the first phase of the project, the difference in the code structure between the previous version of KIVA and the KIVA-4 has been studied, which is the most challenging part of the project. The second phase involves the reverse engineering where the CHT code in previous version is extracted and implemented in KIVA-4 according to the new code structure. The validation of the implemented code is performed using a 4-valve Pentroof engine case. A solid cylinder wall has been developed using GRIDGEN which surrounds 3/4th of the engine cylinder and heat transfer to the solid wall during one engine cycle (0-720 Crank Angle Degree) is compared with that of the reference result. The reference results are nothing but the same engine case run in the previous version with the original code developed by Egel. The results of current code are very much comparable to that of the reference results which verifies that successful implementation of the CHT code in KIVA-4.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this research is to examine the role of the mining company office in the management of the copper industry in Michigan’s Keweenaw Peninsula between 1901 and 1946. Two of the largest and most influential companies were examined – the Calumet & Hecla Mining Company and the Quincy Mining Company. Both companies operated for more than forty years under general managers who were arguably the most influential people in the management of each company. James MacNaughton, general manager at Calumet and Hecla, worked from 1901 through 1941; Charles Lawton, general manager at Quincy Mining Company, worked from 1905 through 1946. In this case, both of these managers were college-educated engineers and adopted scientific management techniques to operate their respective companies. This research focused on two main goals. The first goal of this project was to address the managerial changes in Michigan’s copper mining offices of the early twentieth century. This included the work of MacNaughton and Lawton, along with analysis of the office structures themselves and what changes occurred through time. The second goal of the project was to create a prototype virtual exhibit for use at the Quincy Mining Company office. A virtual exhibit will allow visitors the opportunity to visit the office virtually, experiencing the office as an office worker would have in the early twentieth century. To meet both goals, this project used various research materials, including archival sources, oral histories, and material culture to recreate the history of mining company management in the Copper Country.

Relevância:

100.00% 100.00%

Publicador: