2 resultados para Systems software

em Digital Commons - Michigan Tech


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Cliff Mine, an archaeological site situated on the Keweenaw Peninsula of Michigan, is the location of the first successful attempt to mine native copper in North America. Under the management of the Pittsburgh & Boston Mining Company from 1845-1879, two-third of the Cliff’s mineral output was in the form of mass copper, some pieces of which weighed over 5 tons when removed from the ground. The unique nature of mass copper and the Cliff Mine’s handling of it make it one of the best examples of early mining processes in the Keweenaw District. Mass copper only constituted 2% of the entire product of the Lake Superior copper districts, and the story of early mining on the Peninsula is generally overshadowed by later, longer running mines such as the Calumet & Helca and Quincy Mining Companies. Operating into the mid-twentieth century, the size and duration of these later mines would come to define the region, though they would not have been possible without the Cliff’s early success. Research on the Cliff Mine has previously focused on social and popular history, neglecting the structural remains. However, these remains are physical clues to the technical processes that defined early mining on the Keweenaw. Through archaeological investigations, these processes and their associated networks were documented as part of the 2010 Michigan Technological Archaeology Field School’s curriculum. The project will create a visual representation of these processes utilizing Geographic Information Systems software. This map will be a useful aid in future research, community engagement and possible future interpretive planning.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The electric utility business is an inherently dangerous area to work in with employees exposed to many potential hazards daily. One such hazard is an arc flash. An arc flash is a rapid release of energy, referred to as incident energy, caused by an electric arc. Due to the random nature and occurrence of an arc flash, one can only prepare and minimize the extent of harm to themself, other employees and damage to equipment due to such a violent event. Effective January 1, 2009 the National Electric Safety Code (NESC) requires that an arc-flash assessment be performed by companies whose employees work on or near energized equipment to determine the potential exposure to an electric arc. To comply with the NESC requirement, Minnesota Power’s (MP’s) current short circuit and relay coordination software package, ASPEN OneLinerTM and one of the first software packages to implement an arc-flash module, is used to conduct an arc-flash hazard analysis. At the same time, the package is benchmarked against equations provided in the IEEE Std. 1584-2002 and ultimately used to determine the incident energy levels on the MP transmission system. This report goes into the depth of the history of arc-flash hazards, analysis methods, both software and empirical derived equations, issues of concern with calculation methods and the work conducted at MP. This work also produced two offline software products to conduct and verify an offline arc-flash hazard analysis.