4 resultados para Strategic information management
em Digital Commons - Michigan Tech
Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.
Resumo:
The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.
Resumo:
The objective of this research is to investigate the consequences of sharing or using information generated in one phase of the project to subsequent life cycle phases. Sometimes the assumptions supporting the information change, and at other times the context within which the information was created changes in a way that causes the information to become invalid. Often these inconsistencies are not discovered till the damage has occurred. This study builds on previous research that proposed a framework based on the metaphor of ‘ecosystems’ to model such inconsistencies in the 'supply chain' of life cycle information (Brokaw and Mukherjee, 2012). The outcome of such inconsistencies often results in litigation. Therefore, this paper studies a set of legal cases that resulted from inconsistencies in life cycle information, within the ecosystems framework. For each project, the errant information type, creator and user of the information and their relationship, time of creation and usage of the information in the life cycle of the project are investigated to assess the causes of failure of precise and accurate information flow as well as the impact of such failures in later stages of the project. The analysis shows that the misleading information is mostly due to lack of collaboration. Besides, in all the studied cases, lack of compliance checking, imprecise data and insufficient clarifications hinder accurate and smooth flow of information. The paper presents findings regarding the bottleneck of the information flow process during the design, construction and post construction phases. It also highlights the role of collaboration as well as information integration and management during the project life cycle and presents a baseline for improvement in information supply chain through the life cycle of the project.
Resumo:
This research is a study of the use of capital budgeting methods for investment decisions. It uses both the traditional methods and the newly introduced approach called the real options analysis to make a decision. The research elucidates how capital budgeting can be done when analysts encounter projects with high uncertainty and are capital intensive, for example oil and gas production. It then uses the oil and gas find in Ghana as a case study to support its argument. For a clear understanding a thorough literature review was done, which highlights the advantages and disadvantages of both methods. The revenue that the project will generate and the costs of production were obtained from the predictions by analysts from GNPC and compared to others experts’ opinion. It then applied both the traditional and real option valuation on the oil and gas find in Ghana to determine the project’s feasibility. Although, there are some short falls in real option analysis that are presented in this research, it is still helpful in valuing projects that are capital intensive with high volatility due to the strategic flexibility management possess in their decision making. It also suggests that traditional methods of evaluation should still be maintained and be used to value projects that have no options or those with options yet the options do not have significant impact on the project. The research points out the economic ripples the production of oil and gas will have on Ghana’s economy should the project be undertaken. These ripples include economic growth, massive job creation and reduction of the balance of trade deficit for the country. The long run effect is an eventually improvement of life of the citizens. It is also belief that the production of gas specifically can be used to generate electricity in Ghana which would enable the country to have a more stable and reliable power source necessary to attract more foreign direct investment.