Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.
Resumo:
The objective of this research is to investigate the consequences of sharing or using information generated in one phase of the project to subsequent life cycle phases. Sometimes the assumptions supporting the information change, and at other times the context within which the information was created changes in a way that causes the information to become invalid. Often these inconsistencies are not discovered till the damage has occurred. This study builds on previous research that proposed a framework based on the metaphor of ‘ecosystems’ to model such inconsistencies in the 'supply chain' of life cycle information (Brokaw and Mukherjee, 2012). The outcome of such inconsistencies often results in litigation. Therefore, this paper studies a set of legal cases that resulted from inconsistencies in life cycle information, within the ecosystems framework. For each project, the errant information type, creator and user of the information and their relationship, time of creation and usage of the information in the life cycle of the project are investigated to assess the causes of failure of precise and accurate information flow as well as the impact of such failures in later stages of the project. The analysis shows that the misleading information is mostly due to lack of collaboration. Besides, in all the studied cases, lack of compliance checking, imprecise data and insufficient clarifications hinder accurate and smooth flow of information. The paper presents findings regarding the bottleneck of the information flow process during the design, construction and post construction phases. It also highlights the role of collaboration as well as information integration and management during the project life cycle and presents a baseline for improvement in information supply chain through the life cycle of the project.