4 resultados para FINANCIAL MANAGEMENT
em Digital Commons - Michigan Tech
Resumo:
Increases in oil prices after the economic recession have been surprising for domestic oil production in the United States since the beginning of 2009. Not only did the conventional oil extraction increase, but unconventional oil production and exploration also improved greatly with the favorable economic conditions. This favorable economy encourages companies to invest in new reservoirs and technological developments. Recently, enhanced drilling techniques including hydraulic fracturing and horizontal drilling have been supporting the domestic economy by way of unconventional shale and tight oil from various U.S. locations. One of the main contributors to this oil boom is the unconventional oil production from the North Dakota Bakken field. Horizontal drilling has increased oil production in the Bakken field, but the economic issues of unconventional oil extraction are still debatable due to volatile oil prices, high decline rates of production, a limited production period, high production costs, and lack of transportation. The economic profitability and viability of the unconventional oil play in the North Dakota Bakken was tested with an economic analysis of average Bakken unconventional well features. Scenario analysis demonstrated that a typical North Dakota Bakken unconventional oil well is profitable and viable as shown by three financial metrics; net present value, internal rate of return, and break-even prices.
Resumo:
Metals price risk management is a key issue related to financial risk in metal markets because of uncertainty of commodity price fluctuation, exchange rate, interest rate changes and huge price risk either to metals’ producers or consumers. Thus, it has been taken into account by all participants in metal markets including metals’ producers, consumers, merchants, banks, investment funds, speculators, traders and so on. Managing price risk provides stable income for both metals’ producers and consumers, so it increases the chance that a firm will invest in attractive projects. The purpose of this research is to evaluate risk management strategies in the copper market. The main tools and strategies of price risk management are hedging and other derivatives such as futures contracts, swaps and options contracts. Hedging is a transaction designed to reduce or eliminate price risk. Derivatives are financial instruments, whose returns are derived from other financial instruments and they are commonly used for managing financial risks. Although derivatives have been around in some form for centuries, their growth has accelerated rapidly during the last 20 years. Nowadays, they are widely used by financial institutions, corporations, professional investors, and individuals. This project is focused on the over-the-counter (OTC) market and its products such as exotic options, particularly Asian options. The first part of the project is a description of basic derivatives and risk management strategies. In addition, this part discusses basic concepts of spot and futures (forward) markets, benefits and costs of risk management and risks and rewards of positions in the derivative markets. The second part considers valuations of commodity derivatives. In this part, the options pricing model DerivaGem is applied to Asian call and put options on London Metal Exchange (LME) copper because it is important to understand how Asian options are valued and to compare theoretical values of the options with their market observed values. Predicting future trends of copper prices is important and would be essential to manage market price risk successfully. Therefore, the third part is a discussion about econometric commodity models. Based on this literature review, the fourth part of the project reports the construction and testing of an econometric model designed to forecast the monthly average price of copper on the LME. More specifically, this part aims at showing how LME copper prices can be explained by means of a simultaneous equation structural model (two-stage least squares regression) connecting supply and demand variables. A simultaneous econometric model for the copper industry is built: {█(Q_t^D=e^((-5.0485))∙P_((t-1))^((-0.1868) )∙〖GDP〗_t^((1.7151) )∙e^((0.0158)∙〖IP〗_t ) @Q_t^S=e^((-3.0785))∙P_((t-1))^((0.5960))∙T_t^((0.1408))∙P_(OIL(t))^((-0.1559))∙〖USDI〗_t^((1.2432))∙〖LIBOR〗_((t-6))^((-0.0561))@Q_t^D=Q_t^S )┤ P_((t-1))^CU=e^((-2.5165))∙〖GDP〗_t^((2.1910))∙e^((0.0202)∙〖IP〗_t )∙T_t^((-0.1799))∙P_(OIL(t))^((0.1991))∙〖USDI〗_t^((-1.5881))∙〖LIBOR〗_((t-6))^((0.0717) Where, Q_t^D and Q_t^Sare world demand for and supply of copper at time t respectively. P(t-1) is the lagged price of copper, which is the focus of the analysis in this part. GDPt is world gross domestic product at time t, which represents aggregate economic activity. In addition, industrial production should be considered here, so the global industrial production growth that is noted as IPt is included in the model. Tt is the time variable, which is a useful proxy for technological change. A proxy variable for the cost of energy in producing copper is the price of oil at time t, which is noted as POIL(t ) . USDIt is the U.S. dollar index variable at time t, which is an important variable for explaining the copper supply and copper prices. At last, LIBOR(t-6) is the 6-month lagged 1-year London Inter bank offering rate of interest. Although, the model can be applicable for different base metals' industries, the omitted exogenous variables such as the price of substitute or a combined variable related to the price of substitutes have not been considered in this study. Based on this econometric model and using a Monte-Carlo simulation analysis, the probabilities that the monthly average copper prices in 2006 and 2007 will be greater than specific strike price of an option are defined. The final part evaluates risk management strategies including options strategies, metal swaps and simple options in relation to the simulation results. The basic options strategies such as bull spreads, bear spreads and butterfly spreads, which are created by using both call and put options in 2006 and 2007 are evaluated. Consequently, each risk management strategy in 2006 and 2007 is analyzed based on the day of data and the price prediction model. As a result, applications stemming from this project include valuing Asian options, developing a copper price prediction model, forecasting and planning, and decision making for price risk management in the copper market.
Resumo:
Northern hardwood management was assessed throughout the state of Michigan using data collected on recently harvested stands in 2010 and 2011. Methods of forensic estimation of diameter at breast height were compared and an ideal, localized equation form was selected for use in reconstructing pre-harvest stand structures. Comparisons showed differences in predictive ability among available equation forms which led to substantial financial differences when used to estimate the value of removed timber. Management on all stands was then compared among state, private, and corporate landowners. Comparisons of harvest intensities against a liberal interpretation of a well-established management guideline showed that approximately one third of harvests were conducted in a manner which may imply that the guideline was followed. One third showed higher levels of removals than recommended, and one third of harvests were less intensive than recommended. Multiple management guidelines and postulated objectives were then synthesized into a novel system of harvest taxonomy, against which all harvests were compared. This further comparison showed approximately the same proportions of harvests, while distinguishing sanitation cuts and the future productive potential of harvests cut more intensely than suggested by guidelines. Stand structures are commonly represented using diameter distributions. Parametric and nonparametric techniques for describing diameter distributions were employed on pre-harvest and post-harvest data. A common polynomial regression procedure was found to be highly sensitive to the method of histogram construction which provides the data points for the regression. The discriminative ability of kernel density estimation was substantially different from that of the polynomial regression technique.
Resumo:
This research is a study of the use of capital budgeting methods for investment decisions. It uses both the traditional methods and the newly introduced approach called the real options analysis to make a decision. The research elucidates how capital budgeting can be done when analysts encounter projects with high uncertainty and are capital intensive, for example oil and gas production. It then uses the oil and gas find in Ghana as a case study to support its argument. For a clear understanding a thorough literature review was done, which highlights the advantages and disadvantages of both methods. The revenue that the project will generate and the costs of production were obtained from the predictions by analysts from GNPC and compared to others experts’ opinion. It then applied both the traditional and real option valuation on the oil and gas find in Ghana to determine the project’s feasibility. Although, there are some short falls in real option analysis that are presented in this research, it is still helpful in valuing projects that are capital intensive with high volatility due to the strategic flexibility management possess in their decision making. It also suggests that traditional methods of evaluation should still be maintained and be used to value projects that have no options or those with options yet the options do not have significant impact on the project. The research points out the economic ripples the production of oil and gas will have on Ghana’s economy should the project be undertaken. These ripples include economic growth, massive job creation and reduction of the balance of trade deficit for the country. The long run effect is an eventually improvement of life of the citizens. It is also belief that the production of gas specifically can be used to generate electricity in Ghana which would enable the country to have a more stable and reliable power source necessary to attract more foreign direct investment.