3 resultados para Conflicting management objectives

em Digital Commons - Michigan Tech


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Northern hardwood management was assessed throughout the state of Michigan using data collected on recently harvested stands in 2010 and 2011. Methods of forensic estimation of diameter at breast height were compared and an ideal, localized equation form was selected for use in reconstructing pre-harvest stand structures. Comparisons showed differences in predictive ability among available equation forms which led to substantial financial differences when used to estimate the value of removed timber. Management on all stands was then compared among state, private, and corporate landowners. Comparisons of harvest intensities against a liberal interpretation of a well-established management guideline showed that approximately one third of harvests were conducted in a manner which may imply that the guideline was followed. One third showed higher levels of removals than recommended, and one third of harvests were less intensive than recommended. Multiple management guidelines and postulated objectives were then synthesized into a novel system of harvest taxonomy, against which all harvests were compared. This further comparison showed approximately the same proportions of harvests, while distinguishing sanitation cuts and the future productive potential of harvests cut more intensely than suggested by guidelines. Stand structures are commonly represented using diameter distributions. Parametric and nonparametric techniques for describing diameter distributions were employed on pre-harvest and post-harvest data. A common polynomial regression procedure was found to be highly sensitive to the method of histogram construction which provides the data points for the regression. The discriminative ability of kernel density estimation was substantially different from that of the polynomial regression technique.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The “Quincy & Torch Lake Railroad Engine House Facility Management and Interpretive Plan" was designed to serve as a guide to aid the Quincy Mine Hoist Association in their efforts to restore and interpret historic railroad resources under their stewardship. Early searches for existing management and interpretive plans demonstrated that similar plans were primarily produced by the National Park Service and were intended to guide large scale heritage sites that consist of a variety of cultural resources. This project adapts concepts found in those large scale management and interpretive site plans, to guide small scale site management, restoration, and interpretive projects. The document presents a three stage, second phase restoration process. Each stage of development is guided by a series of management and interpretive goals and objectives which were set for the engine house facility.