2 resultados para Transporting Atpase
em Bucknell University Digital Commons - Pensilvania - USA
Resumo:
Capuchin monkeys are notable among New World monkeys for their widespread use of tools. They use both hammer tools and insertion tools in the wild to acquire food that would be unobtainable otherwise. Evidence indicates that capuchins transport stones to anvil sites and use the most functionally efficient stones to crack nuts. We investigated capuchins’ assessment of functionality by testing their ability to select a tool that was appropriate for two different tool-use tasks: A stone for a hammer task and a stick for an insertion task. To select the appropriate tools, the monkeys investigated a baited tool-use apparatus (insertion or hammer), traveled to a location in their enclosure where they could no longer see the apparatus, made a selection between two tools (stick or stone), and then could transport the tool back to the apparatus to obtain a walnut. Four capuchins were first trained to select and use the appropriate tool for each apparatus. After training, they were then tested by allowing them to view a baited apparatus and then travel to a location 8 m distant where they could select a tool while out of view of the apparatus. All four monkeys chose the correct tool significantly more than expected and transported the tools back to the apparatus. Results confirm capuchins’ propensity for transporting tools, demonstrate their capacity to select the functionally appropriate tool for two different tool-use tasks, and indicate that they can retain the memory of the correct choice during a travel time of several seconds.
Resumo:
The long-term performance of infrastructure depends on reliable and sustainable designs. Many of Pennsylvania’s streams experience sediment transport problems that increase maintenance costs and lower structural integrity of bridge crossings. A stream restoration project is one common mitigation measure used to correct such problems at bridge crossings. Specifically, in an attempt to alleviate aggradation problems with the Old Route 15 Bridge crossing on White Deer Creek, in White Deer, PA, two in-stream structures (rock cross vanes) and several bank stabilization features were installed along with a complete channel redevelopment. The objectives of this research were to characterize the hydraulic and sediment transport processes occurring at the White Deer Creek site, and to investigate, through physical and mathematical modeling, the use of instream restoration structures. The goal is to be able to use the results of this study to prevent aggradation or other sediment related problems in the vicinity of bridges through improved design considerations. Monitoring and modeling indicate that the study site on White Deer Creek is currently unstable, experiencing general channel down-cutting, bank erosion, and several local areas of increased aggradation and degradation of the channel bed. An in-stream structure installed upstream of the Old Route 15 Bridge failed by sediment burial caused by the high sediment load that White Deer Creek is transporting as well as the backwater effects caused by the bridge crossing. The in-stream structure installed downstream of the Old Route 15 Bridge is beginning to fail because of the alignment of the structure with the approach direction of flow from upstream of the restoration structure.