2 resultados para Hydrologic sciences|Civil engineering|Water Resource Management

em Bucknell University Digital Commons - Pensilvania - USA


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Green roof mitigation of volume and peak flow-rate of stormwater runoff has been studied extensively. However, due to the common practice of green roof fertilization, there is the potential for introduction of nutrients into local bodies of water. Therefore, this study compares green roof runoff quality with the water quality of precipitation and runoff from a bare shingle roof. The runoff from a demonstration-scale extensive green roof was analyzed during the summer of 2011 for its effect on runoff volume and analyzed during eleven storm events in the fall and winter for concentrations of copper, cadmium, zinc, lead, nitrogen species, total nitrogen, total organic carbon, sulfate, orthophosphate, and other monovalent and divalent ions. The green roof reduced the overall volume of runoff and served as a sink for NO3 - and NH4 +. However, the green roof was also a source for the pollutants PO4 3-, SO4 2-, TOC, cations, and total nitrogen. Metals such as zinc and lead showed trends of higher mass loads in the bare roof runoff than in precipitation and green roof runoff, although results were not statistically significant. The green roof also showed trends, although also not statistically significant, of retaining cadmium and copper. With the green roof serving as a source of phosphorous species and a sink for nitrogen species, and appearing to a retain metals and total volume, the life cycle impact analysis shows minimum impacts from the green roof, when compared with precipitation and bare roof runoff, in all but fresh water eutrophication. Therefore, the best environments to install a green roof may be in coastal environments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In-stream structures including cross-vanes, J-hooks, rock vanes, and W-weirs are widely used in river restoration to limit bank erosion, prevent changes in channel gradient, and improve aquatic habitat. During this investigation, a rapid assessment protocol was combined with post-project monitoring data to assess factors influencing the performance of more than 558 in-stream structures and rootwads in North Carolina. Cross-sectional survey data examined for 221 cross sections from 26 sites showed that channel adjustments were highly variable from site to site, but approximately 60 % of the sites underwent at least a 20 % net change in channel capacity. Evaluation of in-stream structures ranging from 1 to 8 years in age showed that about half of the structures were impaired at 10 of the 26 sites. Major structural damage was often associated with floods of low to moderate frequency and magnitude. Failure mechanisms varied between sites and structure types, but included: (1) erosion of the channel bed and banks (outflanking); (2) movement of rock materials during floods; and (3) burial of the structures in the channel bed. Sites with reconstructed channels that exhibited large changes in channel capacity possessed the highest rates of structural impairment, suggesting that channel adjustments between structures led to their degradation of function. The data question whether currently used in-stream structures are capable of stabilizing reconfigured channels for even short periods when applied to dynamic rivers.