2 resultados para Deer hunting.

em Bucknell University Digital Commons - Pensilvania - USA


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recent demographic changes have made settlement patterns in the Canadian Arctic increasingly urban. Iqaluit, capital of Canada’s newest territory, Nunavut, is home to the largest concentration of Inuit and non-Inuit populations in the Canadian North. Despite these trends, Inuit cultural identity continues to rest heavily on the perception that to learn how to be authentically Inuit (or to be a better person), a person needs to spend time out on the land (and sea) hunting, fishing, trapping, and camping. Many Inuit also maintain a rather negative view of urban spaces in the Arctic, identifying them as places where Inuit values and practices have been eclipsed by Qallunaat (‘‘white people’’) ones. Some Inuit have even gone so far as to claim that a person is no longer able to be Inuit while living in towns like Iqaluit. This article examines those aspects of Canadian Inuit identity, culture, and tradition that disfavor the acceptance of an urban cultural identity. Based on ethnographic research conducted on Baffin Island in the mid 1990s and early 2000s, the many ways Iqaluit and outpost camp Inuit express the differences and similarities between living on the land and living in town are described. Then follows an examination of how the contrast of land and town is used in the rhetoric of Inuit politicians and leaders. Finally, a series of counterexamples are presented that favor the creation of an authentic urban Inuit identity in the Arctic, including recent attempts on the part of the Nunavut Territorial Government to make education and wage employment in the region more reliant on Inuit Qaujimajatuqangit, or Inuit traditional knowledge.1

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The long-term performance of infrastructure depends on reliable and sustainable designs. Many of Pennsylvania’s streams experience sediment transport problems that increase maintenance costs and lower structural integrity of bridge crossings. A stream restoration project is one common mitigation measure used to correct such problems at bridge crossings. Specifically, in an attempt to alleviate aggradation problems with the Old Route 15 Bridge crossing on White Deer Creek, in White Deer, PA, two in-stream structures (rock cross vanes) and several bank stabilization features were installed along with a complete channel redevelopment. The objectives of this research were to characterize the hydraulic and sediment transport processes occurring at the White Deer Creek site, and to investigate, through physical and mathematical modeling, the use of instream restoration structures. The goal is to be able to use the results of this study to prevent aggradation or other sediment related problems in the vicinity of bridges through improved design considerations. Monitoring and modeling indicate that the study site on White Deer Creek is currently unstable, experiencing general channel down-cutting, bank erosion, and several local areas of increased aggradation and degradation of the channel bed. An in-stream structure installed upstream of the Old Route 15 Bridge failed by sediment burial caused by the high sediment load that White Deer Creek is transporting as well as the backwater effects caused by the bridge crossing. The in-stream structure installed downstream of the Old Route 15 Bridge is beginning to fail because of the alignment of the structure with the approach direction of flow from upstream of the restoration structure.