2 resultados para 640402 Primary mining and extraction processes
em Bucknell University Digital Commons - Pensilvania - USA
Resumo:
This study examined the meaning-making and psychosocial processes of five female legacy students at Bucknell University, each of whom having had at least one parent graduate from the institution. With a research philosophy, design, and methodology rooted in qualitative inquiry and phenomenology, inductive data analysis led to three primary categories that underscored legacy identity development. The first, Paradox of Influence and Identity, revealed through six themes nuanced experiences of separation-individuation. Second, Teaching and Learning, comprised of five themes, illuminated the impact of family — and of Bucknell parent alumni in particular — on their children’s internal working models. Lastly, Bucknell — the Environmental Contextand the five themes grouped therein highlighted the contributions of University community members, and of the campus culture and climate itself, to the co-construction of psychosocial formation. A tentative outline of grounded theory was offered, which explored categorical relationships; Paradox of Influence and Identity emerged as thedominant phenomenon, informing and being reinforced by the data of Teaching and Learning and Bucknell — the Environmental Context. Provisional intervention strategies for student affairs practice, in the contexts of academics, residential life, and career development, were discussed. Further, triangulated research is needed to substantiate and evolve the findings and theoretical model of this thesis.
Resumo:
The long-term performance of infrastructure depends on reliable and sustainable designs. Many of Pennsylvania’s streams experience sediment transport problems that increase maintenance costs and lower structural integrity of bridge crossings. A stream restoration project is one common mitigation measure used to correct such problems at bridge crossings. Specifically, in an attempt to alleviate aggradation problems with the Old Route 15 Bridge crossing on White Deer Creek, in White Deer, PA, two in-stream structures (rock cross vanes) and several bank stabilization features were installed along with a complete channel redevelopment. The objectives of this research were to characterize the hydraulic and sediment transport processes occurring at the White Deer Creek site, and to investigate, through physical and mathematical modeling, the use of instream restoration structures. The goal is to be able to use the results of this study to prevent aggradation or other sediment related problems in the vicinity of bridges through improved design considerations. Monitoring and modeling indicate that the study site on White Deer Creek is currently unstable, experiencing general channel down-cutting, bank erosion, and several local areas of increased aggradation and degradation of the channel bed. An in-stream structure installed upstream of the Old Route 15 Bridge failed by sediment burial caused by the high sediment load that White Deer Creek is transporting as well as the backwater effects caused by the bridge crossing. The in-stream structure installed downstream of the Old Route 15 Bridge is beginning to fail because of the alignment of the structure with the approach direction of flow from upstream of the restoration structure.