102 resultados para Scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The execution of a project requires resources that are generally scarce. Classical approaches to resource allocation assume that the usage of these resources by an individual project activity is constant during the execution of that activity; in practice, however, the project manager may vary resource usage over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and various work-content-related constraints are met. We formulate this problem for the first time as a mixed-integer linear program. Our computational results for a standard test set from the literature indicate that this model outperforms the state-of-the-art solution methods for this problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with scheduling batch (i.e., discontinuous), continuous, and semicontinuous production in process industries (e.g., chemical, pharmaceutical, or metal casting industries) where intermediate storage facilities and renewable resources (processing units and manpower) of limited capacity have to be observed. First, different storage configurations typical of process industries are discussed. Second, a basic scheduling problem covering the three above production modes is presented. Third, (exact and truncated) branch-and-bound methods for the basic scheduling problem and the special case of batch scheduling are proposed and subjected to an experimental performance analysis. The solution approach presented is flexible and in principle simple, and it can (approximately) solve relatively large problem instances with sufficient accuracy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Car manufacturers increasingly offer delivery programs for the factory pick-up of new cars. Such a program consists of a broad range of event-marketing activities. In this paper we investigate the problem of scheduling the delivery program activities of one day such that the sum of the customers’ waiting times is minimized. We show how to model this problem as a resource-constrained project scheduling problem with nonregular objective function, and we present a relaxation-based beam-search solution heuristic. The relaxations are solved by exploiting a duality relationship between temporal scheduling and min-cost network flow problems. This approach has been developed in cooperation with a German automaker. The performance of the heuristic has been evaluated based on practical and randomly generated test instances.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We study a real-world scheduling problem arising in the context of a rolling ingots production. First we review the production process and discuss peculiarities that have to be observed when scheduling a given set of production orders on the production facilities. We then show how to model this scheduling problem using prescribed time lags between operations, different kinds of resources, and sequence-dependent changeovers. A branch-and-bound solution procedure is presented in the second part. The basic principle is to relax the resource constraints by assuming infinite resource availability. Resulting resource conflicts are then stepwise resolved by introducing precedence relationships among operations competing for the same resources. The algorithm has been implemented as a beam search heuristic enumerating alternative sets of precedence relationships.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An Advanced Planning System (APS) offers support at all planning levels along the supply chain while observing limited resources. We consider an APS for process industries (e.g. chemical and pharmaceutical industries) consisting of the modules network design (for long–term decisions), supply network planning (for medium–term decisions), and detailed production scheduling (for short–term decisions). For each module, we outline the decision problem, discuss the specifi cs of process industries, and review state–of–the–art solution approaches. For the module detailed production scheduling, a new solution approach is proposed in the case of batch production, which can solve much larger practical problems than the methods known thus far. The new approach decomposes detailed production scheduling for batch production into batching and batch scheduling. The batching problem converts the primary requirements for products into individual batches, where the work load is to be minimized. We formulate the batching problem as a nonlinear mixed–integer program and transform it into a linear mixed–binary program of moderate size, which can be solved by standard software. The batch scheduling problem allocates the batches to scarce resources such as processing units, workers, and intermediate storage facilities, where some regular objective function like the makespan is to be minimized. The batch scheduling problem is modelled as a resource–constrained project scheduling problem, which can be solved by an efficient truncated branch–and–bound algorithm developed recently. The performance of the new solution procedures for batching and batch scheduling is demonstrated by solving several instances of a case study from process industries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper deals with batch scheduling problems in process industries where final products arise from several successive chemical or physical transformations of raw materials using multi–purpose equipment. In batch production mode, the total requirements of intermediate and final products are partitioned into batches. The production start of a batch at a given level requires the availability of all input products. We consider the problem of scheduling the production of given batches such that the makespan is minimized. Constraints like minimum and maximum time lags between successive production levels, sequence–dependent facility setup times, finite intermediate storages, production breaks, and time–varying manpower contribute to the complexity of this problem. We propose a new solution approach using models and methods of resource–constrained project scheduling, which (approximately) solves problems of industrial size within a reasonable amount of time.