4 resultados para site preparation

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

60.00% 60.00%

Publicador:

Resumo:

PURPOSE: The purpose of this prospective study on humans were to evaluate (a) the clinical outcome of alveolar distraction osteogenesis for the correction of vertically deficient edentulous mandibular ridges, (b) the clinical outcome of dental implants placed in the distracted areas, and (c) the quality and quantity of the bone that had formed in the distraction gap. MATERIAL AND METHODS: Seven patients presenting vertically deficient edentulous ridges were treated by means of distraction osteogenesis with an intraoral alveolar distractor. Approximately 3 months after consolidation of the distracted segments, 20 ITI solid screw SLA implants were placed in the distracted areas. Three to 4 months later, abutments were connected and prosthetic loading of the implants started. During implant site preparation, bone biopsies were taken at the implant sites with trephine burrs for histologic and histometric analyses. RESULTS: The mean follow-up after the initial prosthetic loading was 18 months (range 12-24 months). The mean bone gain obtained at the end of distraction was 7 mm (range 5-9 mm). The cumulative success rate of implants 2 years after the onset of prosthetic loading was 95%, whereas the survival rate of implants was 100%. The newly formed bone consisted of woven bone reinforced by parallel-fibered bone with bone marrow spaces between the bone trabeculae. The bone area fraction in the distraction region ranged from 21.6% to 57.8% (38.5+/-11.7%). DISCUSSION AND CONCLUSIONS: Results from this study showed that (a) distraction osteogenesis is a reliable technique for the correction of vertically deficient edentulous ridges, (b) the regenerated bone withstood the functional demands of implant loading, (c) survival and success rates of implants placed in the distracted areas were consistent with those of implants placed in native bone, and (d) there is sufficient bone volume and maturity in the distracted region for primary stability of the implant.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

OBJECTIVES: The C-Port System (Cardica, Inc, Redwood City, Calif) integrates in one tool all functions necessary to enable rapid automated distal coronary anastomoses. The goal of this prospective, nonrandomized, and multicenter study is to determine the safety and efficacy of this novel anastomotic system. METHODS: Five centers enrolled 133 patients awaiting elective coronary artery bypass grafting surgery. Outcome variables were intraoperative device performance, incidence of device-related adverse events, predischarge and 6-month angiographic graft patency, and 12-month clinical outcome. Independent core laboratories performed qualitative and quantitative angiographic and computed tomographic assessments. RESULTS: The C-Port was used to perform a vein-to-coronary anastomosis in 130 patients. Intraoperative conversion to a hand-sewn anastomosis was necessary in 11 patients because of inadequate target site preparation, inappropriate target vessel selection, or both. Inadequate blood flow related to poor runoff required conversion in 3 additional patients. Three patients died before discharge of causes unrelated to the device. At discharge, 113 patients had a C-Port implant in place, and 104 C-Port anastomoses were studied by means of angiography, resulting in 100 FitzGibbon A, 3 FitzGibbon B, and 1 FitzGibbon 0 classifications. At 6 months, one additional patient died of a device-unrelated cause, and 98 patients were evaluated by means of angiography (n = 89). Overall patency (FitzGibbon A) was 92.1%. Three C-Port anastomoses were rated FitzGibbon B, and 4 were rated FitzGibbon 0. At 12 months, 107 (98.2%) of 109 alive patients were followed up, without any reports of device-related major adverse cardiac events. CONCLUSIONS: The C-Port System allows for a rapid, reliable, and compliant distal anastomosis and yields favorable 6-month angiographic and 12-month clinical results when compared with published studies.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

OBJECTIVES: To evaluate whether or not preparation of the implant site with osteotomes instead of drilling may improve peri-implant bone density and/or osseointegration, and whether or not this further improves the predictability of immediate loading of SLA implants. MATERIAL AND METHODS: The second, third, and fourth premolars were extracted in both sides of the mandible in six dogs, and after at least 3 months four SLA implants were inserted into each side of the jaw. In three animals, the implant sites were prepared by means of osteotomes, while standard stepwise drilling was used in the remaining animals. In each side of the jaw, two non-adjacent implants were restored with single crowns 4 days after installation, while the remaining two implants were left without crowns to serve as non-loaded controls. After 2, 4, or 12 weeks of loading, specimens including the implants and surrounding tissues were obtained and processed for histologic analysis of undecalcified sections. RESULTS: All implants placed with osteotomes were lost (five before delivery of the crowns and the rest during the first week after loading). None of the conventionally inserted implants, however, was lost, and histomorphometrical analysis revealed similar soft- and hard peri-implant tissue characteristics at immediately loaded and non-loaded implants at all observation times. Average bone-to-implant contact was 59-72% at immediately loaded implants vs. 60-63% at non-loaded ones. CONCLUSION: Preparation of the implant site by means of osteotomes had a deleterious effect on osseointegration, while immediate loading of single, free-standing, SLA implants following a conventional surgical protocol did not jeopardize their osseointegration.