10 resultados para project portfolio selection

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Various software packages for project management include a procedure for resource-constrained scheduling. In several packages, the user can influence this procedure by selecting a priority rule. However, the resource-allocation methods that are implemented in the procedures are proprietary information; therefore, the question of how the priority-rule selection impacts the performance of the procedures arises. We experimentally evaluate the resource-allocation methods of eight recent software packages using the 600 instances of the PSPLIB J120 test set. The results of our analysis indicate that applying the default rule tends to outperform a randomly selected rule, whereas applying two randomly selected rules tends to outperform the default rule. Applying a small set of more than two rules further improves the project durations considerably. However, a large number of rules must be applied to obtain the best possible project durations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

These guidelines were developed in the context of working block 3 of the DESIRE project. They address the facilitators in the 18 DESIRE study sites and support them in conducting stakeholder workshops aiming at the selection and decision on mitigation strategies to be implemented in the study site context. The decision-making process is supported by a multi-objective decision support system (MODSS) Software called 'Facilitator'.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most commercial project management software packages include planning methods to devise schedules for resource-constrained projects. As it is proprietary information of the software vendors which planning methods are implemented, the question arises how the software packages differ in quality with respect to their resource-allocation capabilities. We experimentally evaluate the resource-allocation capabilities of eight recent software packages by using 1,560 instances with 30, 60, and 120 activities of the well-known PSPLIB library. In some of the analyzed packages, the user may influence the resource allocation by means of multi-level priority rules, whereas in other packages, only few options can be chosen. We study the impact of various complexity parameters and priority rules on the project duration obtained by the software packages. The results indicate that the resource-allocation capabilities of these packages differ significantly. In general, the relative gap between the packages gets larger with increasing resource scarcity and with increasing number of activities. Moreover, the selection of the priority rule has a considerable impact on the project duration. Surprisingly, when selecting a priority rule in the packages where it is possible, both the mean and the variance of the project duration are in general worse than for the packages which do not offer the selection of a priority rule.