4 resultados para Unactivation of industries

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper we follow a theory-based approach to study the assimilation of compliance software in highly regulated multinational enterprises. These relatively new software products support the automation of controls which are associated with mandatory compliance requirements. We use institutional and success factor theories to explain the assimilation of compliance software. A framework for analyzing the assimilation of Access Control Systems (ACS), a special type of compliance software, is developed and used to reflect the experiences obtained in four in-depth case studies. One result is that coercive, mimetic, and normative pressures significantly effect ACS assimilation. On the other hand, quality aspects have only a moderate impact at the beginning of the assimilation process, in later phases the impact may increase if performance and improvement objectives become more relevant. In addition, it turns out that position of the enterprises and compatibility heavily influence the assimilation process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The paper deals with batch scheduling problems in process industries where final products arise from several successive chemical or physical transformations of raw materials using multi–purpose equipment. In batch production mode, the total requirements of intermediate and final products are partitioned into batches. The production start of a batch at a given level requires the availability of all input products. We consider the problem of scheduling the production of given batches such that the makespan is minimized. Constraints like minimum and maximum time lags between successive production levels, sequence–dependent facility setup times, finite intermediate storages, production breaks, and time–varying manpower contribute to the complexity of this problem. We propose a new solution approach using models and methods of resource–constrained project scheduling, which (approximately) solves problems of industrial size within a reasonable amount of time.