8 resultados para Resource Constraints
em BORIS: Bern Open Repository and Information System - Berna - Suiça
Resumo:
Microsoft Project is one of the most-widely used software packages for project management. For the scheduling of resource-constrained projects, the package applies a priority-based procedure using a specific schedule-generation scheme. This procedure performs relatively poorly when compared against other software packages or state-of-the-art methods for resource-constrained project scheduling. In Microsoft Project 2010, it is possible to work with schedules that are infeasible with respect to the precedence or the resource constraints. We propose a novel schedule-generation scheme that makes use of this possibility. Under this scheme, the project tasks are scheduled sequentially while taking into account all temporal and resource constraints that a user can define within Microsoft Project. The scheme can be implemented as a priority-rule based heuristic procedure. Our computational results for two real-world construction projects indicate that this procedure outperforms the built-in procedure of Microsoft Project
Resumo:
We study a real-world scheduling problem arising in the context of a rolling ingots production. First we review the production process and discuss peculiarities that have to be observed when scheduling a given set of production orders on the production facilities. We then show how to model this scheduling problem using prescribed time lags between operations, different kinds of resources, and sequence-dependent changeovers. A branch-and-bound solution procedure is presented in the second part. The basic principle is to relax the resource constraints by assuming infinite resource availability. Resulting resource conflicts are then stepwise resolved by introducing precedence relationships among operations competing for the same resources. The algorithm has been implemented as a beam search heuristic enumerating alternative sets of precedence relationships.
Resumo:
For executing the activities of a project, one or several resources are required, which are in general scarce. Many resource-allocation methods assume that the usage of these resources by an activity is constant during execution; in practice, however, the project manager may vary resource usage by individual activities over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and precedence and various work-content-related constraints are met.
Resumo:
Expanded access to antiretroviral therapy (ART) offers opportunities to strengthen HIV prevention in resource-limited settings. We invited 27 ART programmes from urban settings in Africa, Asia and South America to participate in a survey, with the aim to examine what preventive services had been integrated in ART programmes. Twenty-two programmes participated; eight (36%) from South Africa, two from Brazil, two from Zambia and one each from Argentina, India, Thailand, Botswana, Ivory Coast, Malawi, Morocco, Uganda and Zimbabwe and one occupational programme of a brewery company included five countries (Nigeria, Republic of Congo, Democratic Republic of Congo, Rwanda and Burundi). Twenty-one sites (96%) provided health education and social support, and 18 (82%) provided HIV testing and counselling. All sites encouraged disclosure of HIV infection to spouses and partners, but only 11 (50%) had a protocol for partner notification. Twenty-one sites (96%) supplied male condoms, seven (32%) female condoms and 20 (91%) provided prophylactic ART for the prevention of mother-to child transmission. Seven sites (33%) regularly screened for sexually transmitted infections (STI). Twelve sites (55%) were involved in activities aimed at women or adolescents, and 10 sites (46%) in activities aimed at serodiscordant couples. Stigma and discrimination, gender roles and funding constraints were perceived as the main obstacles to effective prevention in ART programmes. We conclude that preventive services in ART programmes in lower income countries focus on health education and the provision of social support and male condoms. Strategies that might be equally or more important in this setting, including partner notification, prompt diagnosis and treatment of STI and reduction of stigma in the community, have not been implemented widely.
Resumo:
Sustainable natural resource use requires that multiple actors reassess their situation in a systemic perspective. This can be conceptualised as a social learning process between actors from rural communities and the experts from outside organisations. A specifically designed workshop oriented towards a systemic view of natural resource use and the enhancement of mutual learning between local and external actors, provided the background for evaluating the potentials and constraints of intensified social learning processes. Case studies in rural communities in India, Bolivia, Peru and Mali showed that changes in the narratives of the participants of the workshop followed a similar temporal sequence relatively independently from their specific contexts. Social learning processes were found to be more likely to be successful if they 1) opened new space for communicative action, allowing for an intersubjective re-definition of the present situation, 2) contributed to rebalance the relationships between social capital and social, emotional and cognitive competencies within and between local and external actors.
Resumo:
Agents with single-peaked preferences share a resource coming from different suppliers; each agent is connected to only a subset of suppliers. Examples include workload balancing, sharing earmarked funds, and rationing utilities after a storm. Unlike in the one supplier model, in a Pareto optimal allocation agents who get more than their peak from underdemanded suppliers, coexist with agents who get less from overdemanded suppliers. Our Egalitarian solution is the Lorenz dominant Pareto optimal allocation. It treats agents with equal demands as equally as the connectivity constraints allow. Together, Strategyproofness, Pareto Optimality, and Equal Treatment of Equals, characterize our solution.
Resumo:
The paper deals with batch scheduling problems in process industries where final products arise from several successive chemical or physical transformations of raw materials using multi–purpose equipment. In batch production mode, the total requirements of intermediate and final products are partitioned into batches. The production start of a batch at a given level requires the availability of all input products. We consider the problem of scheduling the production of given batches such that the makespan is minimized. Constraints like minimum and maximum time lags between successive production levels, sequence–dependent facility setup times, finite intermediate storages, production breaks, and time–varying manpower contribute to the complexity of this problem. We propose a new solution approach using models and methods of resource–constrained project scheduling, which (approximately) solves problems of industrial size within a reasonable amount of time.
Resumo:
The paper analyzes how to comply with an emission constraint, which restricts the use of an established energy technique, given the two options to save energy and to invest in two alternative energy techniques. These techniques differ in their deterioration rates and the investment lags of the corresponding capital stocks. Thus, the paper takes a medium-term perspective on climate change mitigation, where the time horizon is too short for technological change to occur, but long enough for capital stocks to accumulate and deteriorate. It is shown that, in general, only one of the two alternative techniques prevails in the stationary state, although, both techniques might be utilized during the transition phase. Hence, while in a static economy only one technique is efficient, this is not necessarily true in a dynamic economy.