18 resultados para Project process

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

40.00% 40.00%

Publicador:

Resumo:

BACKGROUND: In May 2003, a newborn auditory screening program was initiated in the Upper Palatinate. METHODS: Sequential OAE- and BERA-screening was conducted in all hospitals with obstetric facilities. The Screening Center at the Public Health Authority was responsible for the coordination of the screening process, completeness of participation, the follow-up of all subjects with a positive screening test and the quality of instrumental screening. RESULTS: A total of 96% of 17,469 newborns were screened. The referral rate at discharge was 1.6% (0.4% for bilateral positive findings). For 97% of the positive screening results, a definite diagnosis to confirm or exclude hearing loss was achieved; for 43% only after intervention by the Screening Center. Fifteen children with profound bilateral hearing impairment were identified of whom eight were only detected by the intervention of the Screening Center. CONCLUSION: The effective structures established in the Upper Palatinate provide a standard for the quality of neonatal auditory screening achievable in Germany.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The paper deals with batch scheduling problems in process industries where final products arise from several successive chemical or physical transformations of raw materials using multi–purpose equipment. In batch production mode, the total requirements of intermediate and final products are partitioned into batches. The production start of a batch at a given level requires the availability of all input products. We consider the problem of scheduling the production of given batches such that the makespan is minimized. Constraints like minimum and maximum time lags between successive production levels, sequence–dependent facility setup times, finite intermediate storages, production breaks, and time–varying manpower contribute to the complexity of this problem. We propose a new solution approach using models and methods of resource–constrained project scheduling, which (approximately) solves problems of industrial size within a reasonable amount of time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Advances in food transformation have dramatically increased the diversity of products on the market and, consequently, exposed consumers to a complex spectrum of bioactive nutrients whose potential risks and benefits have mostly not been confidently demonstrated. Therefore, tools are needed to efficiently screen products for selected physiological properties before they enter the market. NutriChip is an interdisciplinary modular project funded by the Swiss programme Nano-Tera, which groups scientists from several areas of research with the aim of developing analytical strategies that will enable functional screening of foods. The project focuses on postprandial inflammatory stress, which potentially contributes to the development of chronic inflammatory diseases. The first module of the NutriChip project is composed of three in vitro biochemical steps that mimic the digestion process, intestinal absorption, and subsequent modulation of immune cells by the bioavailable nutrients. The second module is a miniaturised form of the first module (gut-on-a-chip) that integrates a microfluidic-based cell co-culture system and super-resolution imaging technologies to provide a physiologically relevant fluid flow environment and allows sensitive real-time analysis of the products screened in vitro. The third module aims at validating the in vitro screening model by assessing the nutritional properties of selected food products in humans. Because of the immunomodulatory properties of milk as well as its amenability to technological transformation, dairy products have been selected as model foods. The NutriChip project reflects the opening of food and nutrition sciences to state-of-the-art technologies, a key step in the translation of transdisciplinary knowledge into nutritional advice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Children in emergencies need peripheral intravenous (IV) access in order to receive drugs or fluids. The success of IV access is associated with the age of patients and fails in up to 50% of children younger than 6 years. In such situations, it is essential that physicians and paramedics have a tool and easily learnable skills with a high chance of success. According to international guidelines intraosseous (IO) access would be the next step after failed IV access. Our hypothesis was that the success rate in IO puncturing can be improved by standardizing the training; so we developed an IO workshop. METHODS: Twenty-eight hospitals and ambulance services participated in an evaluation process over 3 years. IO workshops and the distribution of standardized IO sets were coordinated by the study group of the University Hospital of Berne. Any attempted or successful IO punctures were evaluated with a standardized interview. RESULTS: We investigated 35 applications in 30 patients (a total of 49 punctures) between November 2001 and December 2004. IO puncture was not successful in 5 patients. The success rate depended neither on the occupation nor the experience of users. Attendance at a standardized IO workshop increased the overall success rate from 77% to 100%, which was statistically not significant (P = 0.074). CONCLUSIONS: Standardized training in IO puncturing seems to improve success more than previous experience and occupation of providers. However, we could not show a significant increase in success rate after this training. Larger supranational studies are needed to show a significant impact of teaching on rarely used emergency skills.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Within the current context that favours the emergence of new diseases, syndromic surveillance (SyS) appears increasingly more relevant tool for the early detection of unexpected health events. The Triple-S project (Syndromic Surveillance Systems in Europe), co-financed by the European Commission, was launched in September 2010 for a three year period to promote both human and animal health SyS in European countries. Objectives of the project included performing an inventory of current and planned European animal health SyS systems and promoting knowledge transfer between SyS experts. This study presents and discusses the results of the Triple-S inventory of European veterinary SyS initiatives. European SyS systems were identified through an active process based on a questionnaire sent to animal health experts involved in SyS in Europe. Results were analyzed through a descriptive analysis and a multiple factor analysis (MFA) in order to establish a typology of the European SyS initiatives. Twenty seven European SyS systems were identified from twelve countries, at different levels of development, from project phase to active systems. Results of this inventory showed a real interest of European countries for SyS but also highlighted the novelty of this field. This survey highlighted the diversity of SyS systems in Europe in terms of objectives, population targeted, data providers, indicators monitored. For most SyS initiatives, statistical analysis of surveillance results was identified as a limitation in using the data. MFA results distinguished two types of systems. The first one belonged to the private sector, focused on companion animals and had reached a higher degree of achievement. The second one was based on mandatory collected data, targeted livestock species and is still in an early project phase. The exchange of knowledge between human and animal health sectors was considered useful to enhance SyS. In the same way that SyS is complementary to traditional surveillance, synergies between human and animal health SyS could be an added value, most notably to enhance timeliness, sensitivity and help interpreting non-specific signals.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Business and Information Technologies (BIT) project strives to reveal new insights into how modern IT impacts organizational structures and business practices using empirical methods. Due to its international scope, it allows for inter-country comparison of empirical results. Germany — represented by the European School of Management and Technologies (ESMT) and the Institute of Information Systems at Humboldt-Universität zu Berlin — joined the BIT project in 2006. This report presents the result of the first survey conducted in Germany during November–December 2006. The key results are as follows: • The most widely adopted technologies and systems in Germany are websites, wireless hardware and software, groupware/productivity tools, and enterprise resource planning (ERP) systems. The biggest potential for growth exists for collaboration and portal tools, content management systems, business process modelling, and business intelligence applications. A number of technological solutions have not yet been adopted by many organizations but also bear some potential, in particular identity management solutions, Radio Frequency Identification (RFID), biometrics, and third-party authentication and verification. • IT security remains on the top of the agenda for most enterprises: budget spending was increasing in the last 3 years. • The workplace and work requirements are changing. IT is used to monitor employees' performance in Germany, but less heavily compared to the United States (Karmarkar and Mangal, 2007).1 The demand for IT skills is increasing at all corporate levels. Executives are asking for more and better structured information and this, in turn, triggers the appearance of new decision-making tools and online technologies on the market. • The internal organization of companies in Germany is underway: organizations are becoming flatter, even though the trend is not as pronounced as in the United States (Karmarkar and Mangal, 2007), and the geographical scope of their operations is increasing. Modern IT plays an important role in enabling this development, e.g. telecommuting, teleconferencing, and other web-based collaboration formats are becoming increasingly popular in the corporate context. • The degree to which outsourcing is being pursued is quite limited with little change expected. IT services, payroll, and market research are the most widely outsourced business functions. This corresponds to the results from other countries. • Up to now, the adoption of e-business technologies has had a rather limited effect on marketing functions. Companies tend to extract synergies from traditional printed media and on-line advertising. • The adoption of e-business has not had a major impact on marketing capabilities and strategy yet. Traditional methods of customer segmentation are still dominating. The corporate identity of most organizations does not change significantly when going online. • Online sales channel are mainly viewed as a complement to the traditional distribution means. • Technology adoption has caused production and organizational costs to decrease. However, the costs of technology acquisition and maintenance as well as consultancy and internal communication costs have increased.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tropical wetlands are estimated to represent about 50% of the natural wetland methane (CH4) emissions and explain a large fraction of the observed CH4 variability on timescales ranging from glacial–interglacial cycles to the currently observed year-to-year variability. Despite their importance, however, tropical wetlands are poorly represented in global models aiming to predict global CH4 emissions. This publication documents a first step in the development of a process-based model of CH4 emissions from tropical floodplains for global applications. For this purpose, the LPX-Bern Dynamic Global Vegetation Model (LPX hereafter) was slightly modified to represent floodplain hydrology, vegetation and associated CH4 emissions. The extent of tropical floodplains was prescribed using output from the spatially explicit hydrology model PCR-GLOBWB. We introduced new plant functional types (PFTs) that explicitly represent floodplain vegetation. The PFT parameterizations were evaluated against available remote-sensing data sets (GLC2000 land cover and MODIS Net Primary Productivity). Simulated CH4 flux densities were evaluated against field observations and regional flux inventories. Simulated CH4 emissions at Amazon Basin scale were compared to model simulations performed in the WETCHIMP intercomparison project. We found that LPX reproduces the average magnitude of observed net CH4 flux densities for the Amazon Basin. However, the model does not reproduce the variability between sites or between years within a site. Unfortunately, site information is too limited to attest or disprove some model features. At the Amazon Basin scale, our results underline the large uncertainty in the magnitude of wetland CH4 emissions. Sensitivity analyses gave insights into the main drivers of floodplain CH4 emission and their associated uncertainties. In particular, uncertainties in floodplain extent (i.e., difference between GLC2000 and PCR-GLOBWB output) modulate the simulated emissions by a factor of about 2. Our best estimates, using PCR-GLOBWB in combination with GLC2000, lead to simulated Amazon-integrated emissions of 44.4 ± 4.8 Tg yr−1. Additionally, the LPX emissions are highly sensitive to vegetation distribution. Two simulations with the same mean PFT cover, but different spatial distributions of grasslands within the basin, modulated emissions by about 20%. Correcting the LPX-simulated NPP using MODIS reduces the Amazon emissions by 11.3%. Finally, due to an intrinsic limitation of LPX to account for seasonality in floodplain extent, the model failed to reproduce the full dynamics in CH4 emissions but we proposed solutions to this issue. The interannual variability (IAV) of the emissions increases by 90% if the IAV in floodplain extent is accounted for, but still remains lower than in most of the WETCHIMP models. While our model includes more mechanisms specific to tropical floodplains, we were unable to reduce the uncertainty in the magnitude of wetland CH4 emissions of the Amazon Basin. Our results helped identify and prioritize directions towards more accurate estimates of tropical CH4 emissions, and they stress the need for more research to constrain floodplain CH4 emissions and their temporal variability, even before including other fundamental mechanisms such as floating macrophytes or lateral water fluxes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An Advanced Planning System (APS) offers support at all planning levels along the supply chain while observing limited resources. We consider an APS for process industries (e.g. chemical and pharmaceutical industries) consisting of the modules network design (for long–term decisions), supply network planning (for medium–term decisions), and detailed production scheduling (for short–term decisions). For each module, we outline the decision problem, discuss the specifi cs of process industries, and review state–of–the–art solution approaches. For the module detailed production scheduling, a new solution approach is proposed in the case of batch production, which can solve much larger practical problems than the methods known thus far. The new approach decomposes detailed production scheduling for batch production into batching and batch scheduling. The batching problem converts the primary requirements for products into individual batches, where the work load is to be minimized. We formulate the batching problem as a nonlinear mixed–integer program and transform it into a linear mixed–binary program of moderate size, which can be solved by standard software. The batch scheduling problem allocates the batches to scarce resources such as processing units, workers, and intermediate storage facilities, where some regular objective function like the makespan is to be minimized. The batch scheduling problem is modelled as a resource–constrained project scheduling problem, which can be solved by an efficient truncated branch–and–bound algorithm developed recently. The performance of the new solution procedures for batching and batch scheduling is demonstrated by solving several instances of a case study from process industries.

Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Competing water demands for household consumption as well as the production of food, energy, and other uses pose challenges for water supply and sustainable development in many parts of the world. Designing creative strategies and learning processes for sustainable water governance is thus of prime importance. While this need is uncontested, suitable approaches still have to be found. In this article we present and evaluate a conceptual approach to scenario building aimed at transdisciplinary learning for sustainable water governance. The approach combines normative, explorative, and participatory scenario elements. This combination allows for adequate consideration of stakeholders’ and scientists’ systems, target, and transformation knowledge. Application of the approach in the MontanAqua project in the Swiss Alps confirmed its high potential for co-producing new knowledge and establishing a meaningful and deliberative dialogue between all actors involved. The iterative and combined approach ensured that stakeholders’ knowledge was adequately captured, fed into scientific analysis, and brought back to stakeholders in several cycles, thereby facilitating learning and co-production of new knowledge relevant for both stakeholders and scientists. However, the approach also revealed a number of constraints, including the enormous flexibility required of stakeholders and scientists in order for them to truly engage in the co-production of new knowledge. Overall, the study showed that shifts from strategic to communicative action are possible in an environment of mutual trust. This ultimately depends on creating conditions of interaction that place scientists’ and stakeholders’ knowledge on an equal footing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

IS outsourcing projects often fail to achieve project goals. To inhibit this failure, managers need to design formal controls that are tailored to the specific contextual demands. However, the dynamic and uncertain nature of IS outsourcing projects makes the design of such specific formal controls at the outset of a project challenging. Hence, the process of translating high-level project goals into specific formal controls becomes crucial for success or failure of IS outsourcing projects. Based on a comparative case study of four IS outsourcing projects, our study enhances current understanding of such translation processes and their consequences by developing a process model that explains the success or failure to achieve high-level project goals as an outcome of two unique translation patterns. This novel process-based explanation for how and why IS outsourcing projects succeed or fail has important implications for control theory and IS project escalation literature.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND AND PURPOSE Intensity-modulated radiotherapy (IMRT) credentialing for a EORTC study was performed using an anthropomorphic head phantom from the Radiological Physics Center (RPC; RPC(PH)). Institutions were retrospectively requested to irradiate their institutional phantom (INST(PH)) using the same treatment plan in the framework of a Virtual Phantom Project (VPP) for IMRT credentialing. MATERIALS AND METHODS CT data set of the institutional phantom and measured 2D dose matrices were requested from centers and sent to a dedicated secure EORTC uploader. Data from the RPC(PH) and INST(PH) were thereafter centrally analyzed and inter-compared by the QA team using commercially available software (RIT; ver.5.2; Colorado Springs, USA). RESULTS Eighteen institutions participated to the VPP. The measurements of 6 (33%) institutions could not be analyzed centrally. All other centers passed both the VPP and the RPC ±7%/4 mm credentialing criteria. At the 5%/5 mm gamma criteria (90% of pixels passing), 11(92%) as compared to 12 (100%) centers pass the credentialing process with RPC(PH) and INST(PH) (p = 0.29), respectively. The corresponding pass rate for the 3%/3 mm gamma criteria (90% of pixels passing) was 2 (17%) and 9 (75%; p = 0.01), respectively. CONCLUSIONS IMRT dosimetry gamma evaluations in a single plane for a H&N prospective trial using the INST(PH) measurements showed agreement at the gamma index criteria of ±5%/5 mm (90% of pixels passing) for a small number of VPP measurements. Using more stringent, criteria, the RPC(PH) and INST(PH) comparison showed disagreement. More data is warranted and urgently required within the framework of prospective studies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Information systems (IS) outsourcing projects often fail to achieve initial goals. To avoid project failure, managers need to design formal controls that meet the specific contextual demands of the project. However, the dynamic and uncertain nature of IS outsourcing projects makes it difficult to design such specific formal controls at the outset of a project. It is hence crucial to translate high-level project goals into specific formal controls during the course of a project. This study seeks to understand the underlying patterns of such translation processes. Based on a comparative case study of four outsourced software development projects, we inductively develop a process model that consists of three unique patterns. The process model shows that the performance implications of emergent controls with higher specificity depend on differences in the translation process. Specific formal controls have positive implications for goal achievement if only the stakeholder context is adapted, while they are negative for goal achievement if in the translation process tasks are unintendedly adapted. In the latter case projects incrementally drift away from their initial direction. Our findings help to better understand control dynamics in IS outsourcing projects. We contribute to a process theoretic understanding of IS outsourcing governance and we derive implications for control theory and the IS project escalation literature.